ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JVMs Magnum

Completed No litigation declared Residential / Group Housing project

JVMs Magnum

By JVM Spectrum LLP

RG-MH-06401 · RERA P51700052431 · Last updated on MahaRERA portal: 18 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
26 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

JVMs Magnum is a Residential / Group Housing project by JVM Spectrum LLP in Thane, Maharashtra, registered with MahaRERA as P51700052431 on 25 Aug 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 17 of the 43 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameJVMs Magnum
  • TypeResidential / Group Housing
  • Location
    • Dhokali- Thane
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052431
  • ReraGenie IDRG-MH-06401

Builder

  • NameJVM Spectrum LLP
  • Entity typePartnership
  • LLPINABZ-1822
  • GSTIN27AASFJ7896H1ZD
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersNilesh Dinesh Patil, Nimit Jitendra Mehta
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Current status

40%17 of 43 units booked
50.0%Work done, per cost certificate

Figures as on 18 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building- ANA9843043

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

Building- A: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 18 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered41
Open Space8

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area632 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Bharat Kutir Co Op Hsg Soc LtdThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipa Corporation
Permissible FSI2488.81
Proposed, not sanctioned2,089 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch3and4, A/6, Rita Saibaba Vihar Complex, Kavesar
Estimated costRs 10.13 cr
Cost incurredRs 5.06 cr
Work done49.99%
BuildingWingEstimatedIncurred
Building- ANARs 9.62 crRs 4.81 cr
-NARs 50.65 lakhRs 25.32 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBuiltform Architects
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
PartnerRole in project
JVM Spectrum LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - JVMS Magnum as on June 2025.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 - JVMS Magnum as on Sep 2025.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 - JVMS Magnum as on June 2025.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 - JVMS Magnum as on Sep 2025.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 - JVMS Magnum as on June 2025.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 - JVMS Magnum as on Sep 2025.pdf18 Dec 2025
Layout approvalFile: JVM Magnum Amended Plans.pdf13 May 2025
Building plan approvalFile: JVM Magnum Amended Plans.pdf13 May 2025
Copy of Layout Approval (in case of layout)File: JVM Magnum Amended Plans.pdf13 May 2025
Commencement Certificates / NA Order for plotted developmentFile: JVM Magnum CC.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: JVM Magnum Amended Plans.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - JVMs Magnum as on March 2025.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Magnum as on March 2025.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of JVMs Magnum as on 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Magnum as on 31-12-2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVM's Magnum as on December 2024.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 JVMS Magnum as on Sep 2024.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 of JVMs Magnum as on 30-09-2024.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 of JVMs Magnum as on 30-09-2024.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of JVMs Magnum as on 30-09-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Magnum as on Sep 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JVMS Magnum Form 1 Sep 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Magnum as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of JVMs Magnum as on 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVMS Magnum as on June 2024.pdf4 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: JVMS Magnum Rera Declaration.pdf27 Jun 2024
Details of encumbrances concerned to FinanceFile: bharat kutir.pdf11 Jun 2024
Details of encumbrances concerned to LegalFile: bharat kutir.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Magnum March 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of JVMs Magnum as on 31-03-2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVMS Magnum as on March 2024.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Magnum Dec 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of JVMs Magnum as on Dec 2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVMS Magnum as on Dec 2023.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVMS Magnum as on Sep 2023.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of JVMs Magnum as on 30-09-2023.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of JVMs Magnum as on 30-09-2023.pdf4 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: JVMs Magnum CC Confirmation (1).pdf18 Aug 2023
Other - TechnicalFile: JVMs Magnum CC Confirmation (1).pdf18 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 of JVMs Magnum.pdf4 Aug 2023
Proforma of Agreement for saleFile: AFS_JVM Magnum_JVM Spectrum.pdf4 Aug 2023
Proforma of Allotment letterFile: Allotment Letter_JVM Magnum_JVM Spectrum.pdf4 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT_A.pdf3 Aug 2023
Copy of the legal title reportFile: Revised Title-Jvms Magnum-Maharera_11zon.pdf27 Jul 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf27 Jul 2023
Declaration in FORM BFile: form b promoter.pdf27 Jul 2023
CERSAI detailsFile: 1 CERSAI details.pdf27 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (3).pdf27 Jul 2023
Deviation Report with respect to Allotment letterFile: Deviation report of allotment letter.pdf27 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report of AFS.pdf27 Jul 2023
Building plan approvalFile: Plan 1st page jvms.pdf26 Jul 2023
Layout approvalFile: Page 1 jvm plan.pdf26 Jul 2023
PAN CardFile: PANgbi.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: No encumbrance letter - dues.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: No encumbrance letter - litigation.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: No encumbrance letter - dues.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: No encumbrance letter - litigation.pdf26 Jul 2023
Copy of Layout Approval (in case of layout)File: Page 1 jvm plan.pdf26 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 1st page jvms.pdf26 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: cc jvms.pdf26 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
JVMs SpectrumSurvey No 76-B-12 Sector No- 05 Dhokali- Thane56OngoingDec 2025Dec 2025

How this compares with Thane

40%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JVMs Magnum on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhokali- Thane7,600+ in Thane

Builder: JVM Spectrum LLP

JVM Spectrum LLP has 3 registrations on MahaRERA, including JVMs Spectrum and JVMs Magnum. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JVMs Magnum is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JVMs Magnum?

The registered promoter entity is JVM Spectrum LLP, a partnership as per the filing. Its LLPIN ABZ-1822 and GSTIN 27AASFJ7896H1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JVMs Magnum?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JVMs Magnum?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JVMs Magnum?

The professionals named in the filing: Architect: Builtform Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JVMs Magnum?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JVMs Magnum. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JVMs Magnum to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.