Home / Browse projects / Mumbai Suburban, Maharashtra / JD PRIDE BUSINESS PARK

Registered No litigation declared Commercial project

JD PRIDE BUSINESS PARK

By DENNIS JAMES FERNANDES

RG-MH-82310 · RERA P51800081061 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2028Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 50%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

JD PRIDE BUSINESS PARK is a Commercial project by DENNIS JAMES FERNANDES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800081061 on 5 Dec 2025. Possession is promised by 31 May 2028.

At a glance

Project

  • NameJD PRIDE BUSINESS PARK
  • TypeCommercial
  • Location
    • RC MARG
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800081061
  • ReraGenie IDRG-MH-82310

Builder

  • NameDENNIS JAMES FERNANDES
  • Entity typeIndividual
  • GSTIN27AAOPF1127B1Z8
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredDec 2025PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Dec 2025
  • Promised completion31 May 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Paralkarwadi CHS Ltd-Wing A-Composite BuildingNA1313000
Paralkarwadi CHS Ltd-Wing B-Composite BuildingNA1212000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 50%.

Paralkarwadi CHS Ltd-Wing A-Composite Building10%
ActivityProgress
Excavation50%
Basement (if any)30%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Paralkarwadi CHS Ltd-Wing B-Composite Building10%
ActivityProgress
Excavation50%
Basement (if any)30%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area783 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Paralkarwadi SRA Co-op.Hsg. Society LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI7652.8
Proposed, not sanctioned3,835 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJai Building Plot Number 359 Central Avenue Road Opp Diamond Garden Chembur Mumbai Maharashtra 400 071

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Jadhav
EngineerV.V.R. CONSULTANT RCC & STEEL STRUCTURES
Chartered AccountantS M BHAT & ASSOCIATES
PartnerRole in project
DENNIS JAMES FERNANDES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q1-26-27.pdf15 Jul 2026
Form 2File: Form 2 Q1-26-27.pdf15 Jul 2026
Form 3File: FORM-3-Q1.pdf15 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q1 Disclosure of Sold or Unsold Inventory.pdf15 Jul 2026
Form 1File: FORM 1 Q3.pdf15 Jul 2026
Form 2File: Q3- FORM -2 -Signed.pdf15 Jul 2026
Form 3File: FORM-3-Q3.pdf15 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q3 Disclosure of Sold or Unsold Inventory.pdf15 Jul 2026
Form 1File: FORM 1 Q4.pdf15 Jul 2026
Form 2File: Q4- FORM -2 -Signed.pdf15 Jul 2026
Form 3File: FORM-3-Q4.pdf15 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q4 Disclosure of Sold or Unsold Inventory.pdf15 Jul 2026
CERSAI detailsFile: Asset Based Report.pdf24 Nov 2025
Other - FinanceFile: Clarification for Finance.pdf24 Nov 2025
CERSAI detailsFile: Asset Based Report.pdf24 Nov 2025
Other - FinanceFile: Clarification for Finance.pdf24 Nov 2025
Other - LegalFile: Revised LOI-Paralkarwadi.pdf14 Oct 2025
Other - LegalFile: CC Verification.pdf14 Oct 2025
Other - LegalFile: Revised LOI-Paralkarwadi.pdf14 Oct 2025
Other - LegalFile: CC Verification.pdf14 Oct 2025
Layout approvalFile: Sanctioned Layout merged_compressed.pdf3 May 2025
Building plan approvalFile: Parlkarwadi Amended IOA issue.pdf3 May 2025
Layout approvalFile: Sanctioned Layout merged_compressed.pdf3 May 2025
Building plan approvalFile: Parlkarwadi Amended IOA issue.pdf3 May 2025
PAN CardFile: Pan card-Dennis Sir.pdf3 May 2025
Copy of the legal title reportFile: Legal Title Report_Final revised_2.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance.pdf3 May 2025
Copy of Layout Approval (in case of layout)File: Sanctioned Layout merged_compressed.pdf3 May 2025
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf3 May 2025
Declaration in FORM BFile: promoter form B.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PARLKARWADI SRA RERA CER UPTO 30-4-25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_with promoter Sign.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Forn 2- Paralkarawadi.pdf3 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC (Commencement Certificate).pdf3 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Parlkarwadi Amended IOA issue.pdf3 May 2025
Declaration about Commencement CertificateFile: Declaration about CC_Revised.pdf3 May 2025
CERSAI detailsFile: Asset Based Declaration.pdf3 May 2025
CERSAI detailsFile: Debtor Based Declaration.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format A.pdf3 May 2025
Deviation Report with respect to Allotment letterFile: no deviation-allotment.pdf3 May 2025
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance.pdf3 May 2025
Other - TechnicalFile: Order No 50-2024_One Plot One Registration JD Pride Business Park.pdf3 May 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation_Agreement for Sale.pdf3 May 2025
Proforma of Agreement for saleFile: Final_Agreement for Sale.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 28-2-25Disclosure of Interest in Other Real Estate Organizations.pdf3 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf3 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: Merged Decl of CA and Promoter.pdf3 May 2025
PAN CardFile: Pan card-Dennis Sir.pdf3 May 2025
Copy of the legal title reportFile: Legal Title Report_Final revised_2.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance.pdf3 May 2025
Copy of Layout Approval (in case of layout)File: Sanctioned Layout merged_compressed.pdf3 May 2025
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf3 May 2025
Declaration in FORM BFile: promoter form B.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PARLKARWADI SRA RERA CER UPTO 30-4-25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_with promoter Sign.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Forn 2- Paralkarawadi.pdf3 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC (Commencement Certificate).pdf3 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Parlkarwadi Amended IOA issue.pdf3 May 2025
Declaration about Commencement CertificateFile: Declaration about CC_Revised.pdf3 May 2025
CERSAI detailsFile: Asset Based Declaration.pdf3 May 2025
CERSAI detailsFile: Debtor Based Declaration.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format A.pdf3 May 2025
Deviation Report with respect to Allotment letterFile: no deviation-allotment.pdf3 May 2025
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance.pdf3 May 2025
Other - TechnicalFile: Order No 50-2024_One Plot One Registration JD Pride Business Park.pdf3 May 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation_Agreement for Sale.pdf3 May 2025
Proforma of Agreement for saleFile: Final_Agreement for Sale.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 28-2-25Disclosure of Interest in Other Real Estate Organizations.pdf3 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf3 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: Merged Decl of CA and Promoter.pdf3 May 2025

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JD PRIDE BUSINESS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: DENNIS JAMES FERNANDES

DENNIS JAMES FERNANDES has 3 registrations on MahaRERA, including SUPRABHAT CLASSIC and SAILEELA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JD PRIDE BUSINESS PARK is delayed beyond 31 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JD PRIDE BUSINESS PARK?

The registered promoter entity is DENNIS JAMES FERNANDES, an individual as per the filing. Its GSTIN 27AAOPF1127B1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JD PRIDE BUSINESS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JD PRIDE BUSINESS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JD PRIDE BUSINESS PARK?

The professionals named in the filing: Architect: Sachin Jadhav; Engineer: V.V.R. CONSULTANT RCC & STEEL STRUCTURES; Chartered Accountant: S M BHAT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JD PRIDE BUSINESS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JD PRIDE BUSINESS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JD PRIDE BUSINESS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.