ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Jalaram Eco Homes Phase I

Registered No litigation declared Residential / Group Housing project

Jalaram Eco Homes Phase I

By Amar Harshad Upadhyay

RG-MH-06318 · RERA P99000052585 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 65%
104 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Jalaram Eco Homes Phase I is a Residential / Group Housing project by Amar Harshad Upadhyay in Palghar, Maharashtra, registered with MahaRERA as P99000052585 on 11 Sep 2023. Possession is promised by 31 Oct 2027. 7 of the 111 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameJalaram Eco Homes Phase I
  • TypeResidential / Group Housing
  • Location
    • Poman- Vasai
    • Poman
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000052585
  • ReraGenie IDRG-MH-06318

Builder

  • NameAmar Harshad Upadhyay
  • Entity typeIndividual
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2023PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion31 Oct 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Current status

6%7 of 111 units booked
83.4%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing HNA8848048
Wing INA8863063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 65%.

Wing H53%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Wing I62%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered60
Open Space3
BuildingClosed/CoveredOpen SpaceTotal
Wing H26127
Wing I34236

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,991 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Declared on10 Jun 2025
LandownerVillageDistrict
Anand Ramasray SinghVarsovaMumbai Suburban
Rizwan Abdullah PatelVarsovaMumbai Suburban
Ajay Rajendra SinghVarsovaMumbai Suburban
Ziyauddin Abdul Razzak SumbadVarsovaMumbai Suburban
Suresh Kumar Girdharilal GuptaVarsovaMumbai Suburban

Approvals and building plan

Sanctioning authorityCollector of Palghar
Permissible FSI4285.22
Proposed, not sanctioned4,285 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1, Guinea Paradise CHS Ltd, Jai Prakash Rd, Near Seven Bunglow, Versova, Andheri West Mumbai
Estimated costRs 4.79 cr
Cost incurredRs 3.99 cr
Work done83.43%
BuildingWingEstimatedIncurred
Wing HNARs 2.27 crRs 1.99 cr
Wing INARs 2.27 crRs 1.99 cr
-NARs 23.93 lakhRs 1.96 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Arch
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Amar Harshad Upadhyay-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2027

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Jalaram Eco Homes Phase I as on March 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 - Jalaram Eco Homes Phase I as on March 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 - Jalaram Eco Homes Phase I as on March 2026.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 Jalaram Eco Homes Phase I as on 30-12-2025.pdf13 Jun 2026
Withdrawal Update Form 1File: Form 1 Jalaram Eco Homes Phase I as on 30-12-2025.pdf13 Jun 2026
Withdrawal Update Form 1File: Form 1 Jalaram Eco Homes Phase I as on 30-12-2025.pdf13 Jun 2026
Withdrawal Update Form 1File: Form 1 Jalaram Eco Homes Phase I as on 30-12-2025.pdf13 Jun 2026
Withdrawal Update Form 2File: Form 2 Jalaram Eco Homes Phase I as on 30-12-2025.pdf13 Jun 2026
Withdrawal Update Form 2File: Form 2 Jalaram Eco Homes Phase I as on 30-12-2025.pdf13 Jun 2026
Withdrawal Update Form 2File: Form 2 Jalaram Eco Homes Phase I as on 31-12-2025.pdf13 Jun 2026
Withdrawal Update Form 2File: Form 2 Jalaram Eco Homes Phase I as on 31-12-2025.pdf13 Jun 2026
Withdrawal Update Form 3File: Form 3 Jalaram Eco Homes Phase I as on 30-09-2025.pdf13 Jun 2026
Withdrawal Update Form 3File: Form 3 Jalaram Eco Homes Phase I as on 31-12-2025.pdf13 Jun 2026
Withdrawal Update Form 3File: Form 3 Jalaram Eco Homes Phase I as on 30-09-2025.pdf13 Jun 2026
Withdrawal Update Form 3File: Form 3 Jalaram Eco Homes Phase I as on 31-12-2025.pdf13 Jun 2026
Withdrawal Update Form 1File: Form 1 - Jalaram Eco Homes Phase I as on June 2025.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 - Jalaram Eco Homes Phase I as on June 2025.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 - Jalaram Eco Homes Phase I as on June 2025.pdf3 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jalaram Eco Homes Phase I as on March 2025.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jalaram Eco Homes Phase I as on Dec 2024.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jalaram Eco Homes Phase I as on March 2025.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jalaram Eco Homes Phase I as on 13-12-2024.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jalaram Eco Homes Phase I as on Dec 2024.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jalaram Eco Homes Phase I as on March 2025.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on Dec 2024.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on March 2025.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jalaram Eco Homes Phase I as on 30-09-2024_compressed (1).pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on June 2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jalaram Eco Homes Phase I as on 30-06-2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JJ phase 1 (1) (1).pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on March 2024.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jalaram Eco Homes Phase I as on March 2024.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jalaram Eco Homes Phase I as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on 30th September 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Jalaram Eco Homes Phase I as on 30th September 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Jalaram Eco Homes Phase I as on 31st December 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jalaram Eco Homes Phase I as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 - Jalaram Eco Homes Phase I as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Jalaram Eco Homes Phase I as on 31st December 2023.pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 6.pdf18 Aug 2023
Other - TechnicalFile: 6.pdf18 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A rera_organized.pdf20 Jul 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf15 Jul 2023
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout).pdf15 Jul 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf15 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance- Finance.pdf15 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance- Legal.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: No Encumbrance- Finance.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: No Encumbrance- Legal.pdf15 Jul 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf15 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout).pdf15 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf15 Jul 2023
Declaration about Commencement CertificateFile: Format D.pdf15 Jul 2023
Declaration in FORM BFile: Form B Promoter.pdf15 Jul 2023
CERSAI detailsFile: Cersai Declaration.pdf15 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_11zon.pdf15 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf15 Jul 2023
Proforma of Agreement for saleFile: AFS-jalaram_amar upadhyay.pdf15 Jul 2023
Proforma of Allotment letterFile: Al_JALARAM_Amar upadhyay.pdf15 Jul 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment.pdf15 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS.pdf15 Jul 2023
PAN CardFile: Amar PAN Card.pdf14 Jul 2023
Copy of the legal title reportFile: Title Search poman 2023.pdf14 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf14 Jul 2023

How this compares with Palghar

6%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jalaram Eco Homes Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Poman3,200+ in Palghar

2 kmJalaram Eco Homes Phase Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: Amar Harshad Upadhyay

Amar Harshad Upadhyay has 2 registrations on MahaRERA, including Jalaram Eco Homes Phase I and Jalaram Eco Homes Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Jalaram Eco Homes Phase I is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jalaram Eco Homes Phase I?

The registered promoter entity is Amar Harshad Upadhyay, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jalaram Eco Homes Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jalaram Eco Homes Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jalaram Eco Homes Phase I?

The professionals named in the filing: Architect: Studio Arch; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jalaram Eco Homes Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jalaram Eco Homes Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jalaram Eco Homes Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.