Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2029Possession promisedno revision filed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
30 of 213Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

JADE GARDENS is a Residential / Group Housing project by NIWAS LIFESPACES LLP in Palghar, Maharashtra, registered with MahaRERA as P99000048402 on 3 Jan 2023. Possession is promised by 1 Oct 2029. 183 of the 213 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameJADE GARDENS
  • TypeResidential / Group Housing
  • Location
    • MAHIM ROAD
    • MAHIM
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000048402
  • ReraGenie IDRG-MH-61554

Builder

  • NameNIWAS LIFESPACES LLP
  • Entity typeCompany
  • DirectorNIMISH LAXMICHAND PASAD
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2023PromisedOct 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion1 Oct 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed88 files

Current status

86%183 of 213 units booked
97.8%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 WING A AND BNA881100110
BUILDING NO 2 WING C AND DNA881030103

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 1 WING A AND B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 WING C AND D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes40%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed248

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots248
Closed/Covered93
Open Space155
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1 WING A AND B4865113
BUILDING NO 2 WING C AND D4590135

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCollector Office Palghar
Permissible FSI8944.21
Proposed, not sanctioned8,944 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 5 AND 6 APNA GHAR CHSL LOKHANDWALA COMPLEX ANDHERI WEST MUMBAI 400053
Estimated costRs 18.82 cr
Cost incurredRs 18.41 cr
Work done97.82%
BuildingWingEstimatedIncurred
BUILDING NO 1 WING A AND BNARs 9.39 crRs 9.20 cr
BUILDING NO 2 WING C AND DNARs 8.32 crRs 8.16 cr
-NARs 1.11 crRs 1.05 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG MISTRY AND ASSOCIATES
ArchitectCHIRAG MISTRY & ASSOCAITES
EngineerSHAH AND ASSOCIATES
EngineerDEEPAK MHATRE
Chartered AccountantCA DISHANK RAJENDRA VORA
Chartered AccountantPARTH SAVLA & Co.
PartnerRole in project
NIWAS LIFESPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Oct 2029

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Niwas JG Architect Certificate From1 Jan - Mar 26.pdf22 Apr 2026
Withdrawal Update Form 2File: Form-2.pdf22 Apr 2026
Withdrawal Update Form 3File: Jade Gardens Withdrawal Application Form3.pdf22 Apr 2026
Withdrawal Update Form 1File: Niwas JG Architect Certificate From1 Oct - Dec 25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2.pdf20 Jan 2026
Withdrawal Update Form 3File: Niwas JG CA Certificate Form 3 Oct - Dec 25.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1.pdf19 Oct 2025
Withdrawal Update Form 2File: Form-2.pdf19 Oct 2025
Withdrawal Update Form 3File: Form-3.pdf19 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A(Fy 2024-25)-Jade Gardens.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 JG System Signed.pdf24 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architech Certificate Niwas JG.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificate JG.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Enginner certificate Niwas JG.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect certificate (1).pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas Form 3 CA - 30-12-2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate (2) (1).pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jade Gardens (FROM-1).pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas Form 3 CA - 22-10-2024.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY Q2 24-25.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 (apr - jun 24).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 (apr - jun 24).pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Niwas Form 2A 2023 - 2024.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-6-24_compressed.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant's Certificate Form - 3 (apr - jun 24).pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1Jade Gardens.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 (jan - mar 24).pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31-3-24_compressed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas Form 3 CA - 31-03-2024.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY_compressed.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas Form 3 CA - 31-12-2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NIWAS JG RERA FORM 1 ARCHITECT CERTIFICATE dec 2023_compressed.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NIWAS JG RERA FORM 2 ENGINEERS CERTIFICATE.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: NIWAS_JG_DCB_ENCUMBRANCES_RERA_DECLARATION_.pdf1 Dec 2023
Details of encumbrances concerned to LegalFile: NIWAS_JG_DCB_ENCUMBRANCES_RERA_DECLARATION_.pdf1 Dec 2023
Details of encumbrances concerned to FinanceFile: 2 CERSAI details.pdf30 Nov 2023
Details of encumbrances concerned to LegalFile: 2 CERSAI details.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NIWAS JG RERA FORM 1 ARCHITECT CERTIFICATE 07102023.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NIWAS JG RERA FORM 2 ENGINEERS CERTIFICATE 07102023.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY 14102023_compressed.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NIWAS JG RERA FORM 3 CA CERTIFICATE 30092023.pdf18 Oct 2023
CERSAI detailsFile: Declaration for account changing.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Signed JADE GARDEN.pdf5 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022 - 2023.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Niwas jade gardens Architect Certificate (Form-1).pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NIWAS JG RERA FORM 2 ENGINEERS CERTIFICATE Jul 08, 2023.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: Niwas Sold - Unsold inventory_compressed.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas Form 3 CA - 30-06-23.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chirag B Mistry architect.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shah Associates engineer.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY_compressed.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas Form 3 CA 31 March 2023_compressed.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NIWAS JG CA FORM 3_compressed.pdf23 Dec 2022
Copy of the legal title reportFile: NIWAS JG TITLE SEARCH REPORT AS PER RERA.pdf13 Dec 2022
Proforma of Agreement for saleFile: NIWAS JG AGREEMENT FOR SALE AS PER RERA.pdf13 Dec 2022
Proforma of Allotment letterFile: NIWAS JG ALLOTMENT LETTER AS PER RERA.pdf13 Dec 2022
Deviation Report with respect to Allotment letterFile: Declaration allotment deviation report (1).pdf12 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Declaration agreement deviation report (1).pdf12 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: NIWAS LLP COLLECTOR ORDER_compressed.pdf10 Dec 2022
Layout approvalFile: scan220221103_070732 Sheet 1_compressed (1).pdf8 Dec 2022
Building plan approvalFile: scan220221103_070833 Sheet 2_compressed.pdf8 Dec 2022
Building plan approvalFile: scan220221103_070932 Sheet 3_compressed.pdf8 Dec 2022
Building plan approvalFile: scan220221103_071037 Sheet 4_compressed.pdf8 Dec 2022
Building plan approvalFile: scan220221103_071037 Sheet 4_compressed.pdf8 Dec 2022
Building plan approvalFile: scan220221103_071238 Sheet 5_compressed.pdf8 Dec 2022
Building plan approvalFile: scan220221103_071309 Sheet 6.pdf8 Dec 2022
PAN CardFile: COMPANY PANCARD.pdf8 Dec 2022
Details of encumbrances concerned to FinanceFile: Declaration legal encumbrances (1).pdf8 Dec 2022
Details of encumbrances concerned to FinanceFile: Declaration Finance encumbrances (1).pdf8 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration legal encumbrances (1).pdf8 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration Finance encumbrances (1).pdf8 Dec 2022
Copy of Layout Approval (in case of layout)File: scan220221103_070732 Sheet 1_compressed (1).pdf8 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: scan220221103_070833 Sheet 2_compressed.pdf8 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: scan220221103_070932 Sheet 3_compressed.pdf8 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: scan220221103_071037 Sheet 4_compressed.pdf8 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: scan220221103_071037 Sheet 4_compressed.pdf8 Dec 2022

How this compares with Palghar

86%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JADE GARDENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM3,200+ in Palghar

2 kmJADE GARDENSCompleted 14Lapsed / revoked 10Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: NIWAS LIFESPACES LLP

NIWAS LIFESPACES LLP has 2 registrations on MahaRERA, including JADE GARDENS and KIARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if JADE GARDENS is delayed beyond 1 Oct 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JADE GARDENS?

The registered promoter entity is NIWAS LIFESPACES LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JADE GARDENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JADE GARDENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JADE GARDENS?

The professionals named in the filing: Architect: CHIRAG MISTRY AND ASSOCIATES; Architect: CHIRAG MISTRY & ASSOCAITES; Engineer: SHAH AND ASSOCIATES; Engineer: DEEPAK MHATRE; Chartered Accountant: CA DISHANK RAJENDRA VORA; Chartered Accountant: PARTH SAVLA & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JADE GARDENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JADE GARDENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JADE GARDENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.