Home / Browse projects / Mumbai City, Maharashtra / JADE CREST
JADE CREST
RG-MH-65312 · RERA P51900033760 · Last updated on MahaRERA portal: 7 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JADE CREST is a Residential / Group Housing project by National Happy Homes in Mumbai City, Maharashtra, registered with MahaRERA as P51900033760 on 8 Mar 2022. The registration is recorded completed; possession was promised by 30 Sep 2026.
At a glance
Project
- NameJADE CREST
- TypeResidential / Group Housing
- Location
- Road No 10A
- Wadala West
- Mumbai City
- 400031
- Pincode400031
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900033760
- ReraGenie IDRG-MH-65312
Builder
- NameNational Happy Homes
- Entity typePartnership
- GSTIN27AAFFN1387E1ZA
- PartnersNaresh Bhavanji Chheda, Umang Dinesh Kuwadia, Jitesh Kantilal Jain, Mukesh Vijpar Nishar, Vimi Mukesh Nishar
- Other registrations4 more →
- Completed4 of 5
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Mar 2022
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JADE CREST | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
JADE CREST: 94% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities16
As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 65% |
| Storm Water Drains | Yes | 65% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 65% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Fitness Center | Yes | 0% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GA Designs Architects & Interior Design |
| Engineer | S N Apte & Co |
| Chartered Accountant | Girish L Shethia Chartered Accountant |
| Partner | Role in project |
|---|---|
| National Happy Homes | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 May 2025
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 NHH JC 2024 25.pdf | 7 Jul 2025 |
| Other - TechnicalFile: jc 2.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 3.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 4.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 5.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 5.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 6.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 7.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 8.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 9.pdf | 1 Jul 2025 |
| Other - TechnicalFile: jc 10.pdf | 1 Jul 2025 |
| Form 1File: Jade Crest Architect Certificate 31032025.pdf | 28 May 2025 |
| Form 2File: Jade Crest Engineer Certificate 31032025.pdf | 28 May 2025 |
| Form 3File: NHH JC Form3 31032025.pdf | 28 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Jade Crest Disclosure of SoldUnsold Inventory 31032025.pdf | 28 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20250425 Occupation Certificate.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jade Crest 31122024.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC FORM 3 for Decem 2024.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Jade Crest 31122024.pdf | 21 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Soldunsold Inventory Jade Crest 311224.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC 2425 Q2 Form3.pdf | 13 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate Jade Crest Q1 300923.pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate Jade Crest Q2 310324.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jade Crest for 31032024.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jade Crest for 30062024.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC Form3 30092023.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHHJCForm3032024.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHHJCForm3062024.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JC Engg Cert for 31032024.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JC Engg Cert for 30062024.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Jade Crest Sold Booked Inventory 30 June 2024.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NHH JC 2324 Form5 31032024.pdf | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Jade Crest Sold Booked Inventory 31 December 2023.pdf | 24 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JC Form 3 Dec 2023.pdf | 13 Mar 2024 |
| Building plan approvalFile: 20221012 Amended letter.pdf | 7 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 20221012 Amended letter.pdf | 7 Mar 2024 |
| Declaration about Commencement CertificateFile: 20230131 Endorse and Extended Full CC.pdf | 7 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC Form3 30092023.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC Form3 30062023.pdf | 16 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NHH JC Form 5 31032023.pdf | 16 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jade Crest Form 3 for March 2023.pdf | 15 Jun 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration for Society formation.pdf | 9 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jade Crest Form 3 CA upto December 2022.pdf | 15 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jade Crest Form 3 CA upto 10 March 2023.pdf | 15 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Jade Crest Sold Unsold Inventory for Q1.pdf | 30 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Jade Crest Sold Unsold Inventory for Q2.pdf | 30 Jan 2023 |
| Proforma of Agreement for saleFile: Proforma Agreement for Sale JC.pdf | 30 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC FORM 3 for Sept 2022.pdf | 10 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JC Form 3 June 2022.pdf | 6 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Jade Crest Form5 AY 2022.pdf | 8 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH-JC Form 3 March 2022.pdf | 3 Aug 2022 |
| Building plan approvalFile: 20211215 IOD Approval Letter.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC 1_compressed.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC - Page 2.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC 3_compressed.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC 4_compressed.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC 5_compressed.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC - Page 6.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC - Page 7.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC - Page 7.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC - Page 8.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC 9_compressed.pdf | 3 Mar 2022 |
| Building plan approvalFile: JC 10.pdf | 3 Mar 2022 |
| Layout approvalFile: Declaration for No Layout JC.pdf | 3 Mar 2022 |
| PAN CardFile: NHH Pan Card.pdf | 3 Mar 2022 |
| Copy of the legal title reportFile: Rera Title Certificate JC_compressed.pdf | 3 Mar 2022 |
| Details of encumbrancesFile: Declaration for Emcrumbrances.pdf | 3 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Declaration for No Layout JC.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 20211215 IOD Approval Letter.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC 1_compressed.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC - Page 2.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC 3_compressed.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC 4_compressed.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC 5_compressed.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC - Page 6.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC - Page 7.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC - Page 7.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC - Page 8.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC 9_compressed.pdf | 3 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: JC 10.pdf | 3 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep JADE CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadala West780+ in Mumbai City
Filed coordinates, straight-line distance. 187 registered projects within 2 km.
Godrej Horizon Phase I
Godrej Projects Development Ltd
Godrej Horizon Phase III
Godrej Projects Development Ltd
Godrej Horizon Phase II
Godrej Projects Development Ltd
Rustomjee Vista Bay
Xcellent Realty Private Limited
Dignity Bayview
DIGNITY REALTY AND HOUSING
Skye 31
B P Gangar Constructions Pvt Ltd
See every Mumbai City project, with the district possession charts
Builder: National Happy Homes
National Happy Homes has 5 registrations on MahaRERA, including JADE VEDANT and Kamal Kunj. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if JADE CREST is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JADE CREST?
The registered promoter entity is National Happy Homes, a partnership as per the filing. Its GSTIN 27AAFFN1387E1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JADE CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for JADE CREST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JADE CREST?
The professionals named in the filing: Architect: GA Designs Architects & Interior Design; Engineer: S N Apte & Co; Chartered Accountant: Girish L Shethia Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JADE CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback