Home / Browse projects / Godrej Horizon Phase II

Registered Litigation declared Residential / Group Housing project

Godrej Horizon Phase II

By Godrej Projects Development Ltd

RG-MH-54972 · RERA P51900049757 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2029Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 91%
69 of 352Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 165 documents Report an error

Godrej Horizon Phase II is a Residential / Group Housing project by Godrej Projects Development Ltd in Wadala, 400031, registered with MahaRERA as P51900049757 on 24 Feb 2023. Possession is promised by 30 Jun 2029. 283 of the 352 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Horizon Phase II
  • TypeResidential / Group Housing
  • Location
    • R A Kidwai Marg
    • Wadala
    • 400031
  • Pincode400031
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900049757
  • ReraGenie IDRG-MH-54972

Builder

  • NameGodrej Projects Development Ltd
  • Entity typeCompany
  • CINU70102MH2010PLC210227
  • GSTIN27AAECG0366L1ZG
  • Associate Vice President Region Head MMR TwoPriyamvada Navet
  • Other registrations3 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2023PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed165 files

Current status

80%283 of 352 units booked
47.8%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 2 Wing- ANA47441570157
Tower 2 Wing- BNA47441950195

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 91%.

Tower 2 Wing- A48%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 2 Wing- B48%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Open Space8
BuildingOpen SpaceTotal
Tower 2 Wing- A44
Tower 2 Wing- B44

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,893 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Oct 2024
LandownerVillageDistrict
Shree Azadnagar Co-operative Housing Society LtdCHARHOLIMumbai City
Om Azadnagar Co-operative Housing Society LtdCHARHOLIMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI38241.84
Proposed, not sanctioned5,824 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJeevan Prakash Building, G F, Sir Pirozshah Mehta Road, Fort, Mumbai
Estimated costRs 391.51 cr
Cost incurredRs 187.27 cr
Work done47.83%
BuildingWingEstimatedIncurred
Tower 2 Wing- BNARs 209.02 crRs 99.46 cr
Tower 2 Wing- ANARs 178.05 crRs 84.72 cr
-NARs 4.44 crRs 3.09 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
EngineerVinyasa Consultants
EngineerRajendra Joshi
EngineerSamartha Constro Consultants LLP
Chartered AccountantAKPJ & Associates
Chartered AccountantBSR and Co. LLP ( 101248W/W-100022)
Chartered AccountantBSR and Co. LLP
PartnerRole in project
Godrej Projects Development Ltd-

Litigation declared2

CaseCourtStatus
2690/2022City Civil Court MumbaiOngoing
Application 28/2023/2023National Green Tribunal (Western Zone Bench) PuneOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000396819VIKAS VINAYAK DEODHARGODREJ PROJECTS DEVELOPMENT LTD,25/07/2023
CC006000000396810Yazad PatelGodrej Projects Development Limited18/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed165

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 165 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: PH2_FORM 2A Signed.pdf12 Jun 2026
Withdrawal Update Form 1File: Ph2_Signed AC.pdf20 Apr 2026
Withdrawal Update Form 2File: Ph2_Signed EC.pdf20 Apr 2026
Withdrawal Update Form 3File: Ph2 Signed CA certificate_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: PHASE_2 Signed AC.pdf19 Jan 2026
Withdrawal Update Form 2File: Phase_2 signed EC.pdf19 Jan 2026
Withdrawal Update Form 3File: Ph_2_final signed CA certificate.pdf19 Jan 2026
Withdrawal Update Form 1File: Phase_2_Architect Certificate_1_signed_copy.pdf18 Oct 2025
Withdrawal Update Form 1File: Phase_2_Architect Certificate_1_signed_copy.pdf18 Oct 2025
Withdrawal Update Form 1File: Phase_2_Architect Certificate_1_signed_copy.pdf18 Oct 2025
Withdrawal Update Form 2File: Phase_2_Engineer Certificate.pdf18 Oct 2025
Withdrawal Update Form 2File: Phase_2_Engineer Certificate.pdf18 Oct 2025
Withdrawal Update Form 2File: Phase_2_Engineer Certificate.pdf18 Oct 2025
Withdrawal Update Form 3File: Phase_2_CA Certificate_Signed.pdf18 Oct 2025
Withdrawal Update Form 3File: Phase_2_CA Certificate_Signed.pdf18 Oct 2025
Withdrawal Update Form 3File: Phase_2_CA Certificate_Signed.pdf18 Oct 2025
Form 5 (FY 2022-2023)File: Phase2 FY22-23FORM5.pdf19 Sep 2025
Form 5 (FY 2024-2025)File: Godrej Horizon AZ Phase II Signed.pdf28 Aug 2025
Form 1File: Architect Certificate - Phase 2.pdf20 Jul 2025
Form 2File: Engineers Certificate - Phase 2.pdf20 Jul 2025
Form 3File: CA Certificate - Phase 2.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory - Phase 2.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: Engineers Certificate on Quality Assurance - Horizon Phase 2.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Phase 2.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: Godrej Horizon Ph2 - Sold disclosure.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-Phase-2.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Phase 2.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Horizon Ph2 - Architect Certificate.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Horizon Ph2 - Architect Certificate.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Horizon Ph2 - Architect Certificate.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Horizon Ph2 - Engineers Certificate.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Godrej Horizon Ph2 - Sold disclosure.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase-2.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Horizon Ph2 - Engineers Certificate.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Godrej Horizon Ph2 - Sold disclosure.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase-2.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase-2.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Horizon Ph2 - Engineers Certificate.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Godrej Horizon Ph2 - Sold disclosure.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Horizon Ph2 - Architect Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Horizon Ph2 - Engineers Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Horizon Ph2 - Disclosure of sales.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon Ph2 - CA Certificate.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Horizon Ph2 - Architect Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Horizon Ph2 - Engineers Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Horizon Ph2 - Disclosure of sales.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon Ph2 - CA Certificate.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Horizon Ph2 - Architect Certificate.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon Ph2 - CA Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Horizon Ph2 - Engineers Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Horizon Ph2 - Disclosure of sales.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Horizon Ph 2 Form 5 FY 23 24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Horizon Ph 2 Form 5 FY 23 24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Horizon Ph 2 Form 5 FY 23 24.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Godrej Horizon Ph 2 Form 5 FY 23 24.pdf3 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Horizon Ph2 - Architect Certificate.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Horizon Ph2 - Engineers Certificate.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: Horizon Ph2 - Disclosure of sold inventory.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon Ph2 - CA CERTIFICATE.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Horizon Phase 2- QA Certificate FY2024.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Certificate FY 2023.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory Phase 2.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase 2.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase 2.pdf24 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: Home Buyer Allottee Grievance Redressal Cell Godrej Horizon Phase II.pdf26 Mar 2024
Disclosure of sold/ booked inventoryFile: Godrej Horizon Phase 2 - Disclosure of Sold Inventory.pdf14 Mar 2024
Building plan approvalFile: IOD Letter - Sale Amended plans.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Letter - Sale Amended plans.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth Re-endorsement CC dtd 24-03-2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase II.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon CA Certificate Phase II.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase II.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon CA Certificate Phase II.pdf31 Oct 2023
Other - LegalFile: Application Form- Phase II - FINISHED.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final deliverable Phase 2.pdf29 Sep 2023
Other - TechnicalFile: Layout, Amenity bldg and MLCP bldg_page-0001.pdf3 Aug 2023
Other - TechnicalFile: Layout, Amenity bldg and MLCP bldg_page-0001.pdf3 Aug 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Godrej SummitVillage Gurugram Sector 104 Gurugram1,177CompletedSep 2018Late, Dec 2018
Godrej BKCG Block Bandra Kurla Complex Bandra East Mumbai 40005130CompletedJun 2016May 2016
Godrej PlatinumInternational Airport Road Hebbal Bengaluru Karnataka 560024108CompletedMar 2016Late, Jan 2017
Godrej GenesisPlot No X1 9 10 13 and 14 Block EP and GP Sector V Saltlake Kolkata 700091125CompletedSep 2015Late, Dec 2015

Keep Godrej Horizon Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadala

2 kmGodrej Horizon Phase IICompleted 6Lapsed / revoked 3Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: Godrej Projects Development Ltd

Godrej Projects Development Ltd has 4 registrations on MahaRERA, including Godrej Horizon Phase I and Godrej Five Gardens. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Godrej Horizon Phase II is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Horizon Phase II?

The registered promoter entity is Godrej Projects Development Ltd, a company as per the filing. Its CIN U70102MH2010PLC210227 and GSTIN 27AAECG0366L1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Horizon Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Horizon Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Horizon Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Horizon Phase II?

The professionals named in the filing: Architect: R Design Architects; Engineer: Vinyasa Consultants; Engineer: Rajendra Joshi; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: AKPJ & Associates; Chartered Accountant: BSR and Co. LLP ( 101248W/W-100022). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Horizon Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Horizon Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Horizon Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.