Home / Browse projects / Skye 31
Skye 31
By B P Gangar Constructions Pvt Ltd
RG-MH-25493 · RERA P51900002859 · Last updated on MahaRERA portal: 29 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 31 complaints at MahaRERA
- Completion date moved by 49 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Skye 31 is a Residential / Group Housing project by B P Gangar Constructions Pvt Ltd in Wadala, 400031, registered with MahaRERA as P51900002859 on 4 Aug 2017. Possession is promised by 31 Jul 2028. The completion date has moved by 49 months from the original filing. 138 of the 159 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 31 complaints are on record with the regulator.
At a glance
Project
- NameSkye 31
- TypeResidential / Group Housing
- Location
- Katrak Road
- Wadala
- 400031
- Pincode400031
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900002859
- ReraGenie IDRG-MH-25493
Builder
- NameB P Gangar Constructions Pvt Ltd
- Entity typeCompany
- Managing DirectorDevchand Bhimshi Gangar
- DirectorSubbaraman Anand Vilayannur
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2017
- Promised completion31 Jul 2028
- Revised completionRevised to 31 Jul 2028 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 29 Aug 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Skye 31 | NA | 65 | 65 | 159 | 0 | 159 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 10%.
Skye 31: 38% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed227
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Studio Changani Consultancy Company |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Partner | Role in project |
|---|---|
| B P Gangar Constructions Pvt Ltd | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn 2019 the Terms of Planning, as per the 2034 development plan, the road line touching the plot shifted, due to which additional road set back area needed to be handed over to the MCGM. This further impacted the planning of the Sale building and took us right back to the drawing board. The company started the foundation work on the sale building and by the beginning of 2020 completed the Pile Foundations as required. After the pandemic in august 2020 we re-started work on the Rehab building. We decided to complete the rehab building. Today: The rehab building is 95% completed. We expect to gi
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work
Complaints filed with MahaRERA31
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000171672 | BHASKAR BABURAO PATIL | TATTVA MITTAL DEVELOPER | 26/11/2019 |
| CC006000000210143 | BHASKAR BABURAO PATIL | B.P.GANGAR CONSTRUCTION PVT LTD AND TATTV MITTAL | 23/02/2022 |
| CC006000000591047 | Kersi Jamshed Divecha | B P Gangar Construction Pvt Ltd | 11/07/2024 |
| CC12500184 | Alka Rajendra Patil | B P Gangar Constructions Pvt Ltd | 20/01/2025 |
| CC12500479 | Rajendra Shivaji Patil | B P Gangar Constructions Pvt Ltd | 13/02/2025 |
| CC12500849 | ABID ABDUL KALAM SHAIKH | B P Gangar Constructions Pvt Ltd | 12/03/2025 |
| CC12501171 | Vishal Madhukar Halbe | B P Gangar Constructions Pvt Ltd | 08/04/2025 |
| CC12501373 | ASHUTOSH GAJENDRA RAI | B P Gangar Constructions Pvt Ltd | 25/04/2025 |
| CC12501358 | Nitin Madhukar Khadse | B P Gangar Constructions Pvt Ltd | 24/04/2025 |
| CC12501753 | Kishor Subhashchandra Mundargi | B P Gangar Constructions Pvt Ltd | 28/05/2025 |
| CC12502200 | NANDU VISHNU PAWAR | B P Gangar Constructions Pvt Ltd | 02/07/2025 |
| CC12502216 | Anil Mohanlal Dron | B P Gangar Constructions Pvt Ltd | 03/07/2025 |
| CC12502242 | Saurabh Gupta | B P Gangar Constructions Pvt Ltd | 05/07/2025 |
| CC12502329 | Pratibha Madhav Patil | B P Gangar Constructions Pvt Ltd | 10/07/2025 |
| CC12502558 | Atul Kumar Pangasa | B P Gangar Constructions Pvt Ltd | 25/07/2025 |
| CC12502559 | Atul Kumar Pangasa | B P Gangar Constructions Pvt Ltd | 25/07/2025 |
| CC12502536 | Neha Sanjay Kulkarni | B P Gangar Constructions Pvt Ltd | 23/07/2025 |
| CC12502697 | Rucha Amar Kulkarni | B P Gangar Constructions Pvt Ltd | 02/08/2025 |
| CC12502755 | Ananda Sakharam Patil | B P Gangar Constructions Pvt Ltd | 06/08/2025 |
| CC12502920 | Harshwardhan Dilip Shirodkar | B P Gangar Constructions Pvt Ltd | 20/08/2025 |
| CC12503010 | Anil Karunakar Shetty | B P Gangar Constructions Pvt Ltd | 26/08/2025 |
| CC12503132 | ANIL MOHANLAL DRON | B P Gangar Constructions Pvt Ltd | 05/09/2025 |
| CC12503421 | Vinayak Parab | B P Gangar Constructions Pvt Ltd | 25/09/2025 |
| CC12504190 | Vishal Madhukar Halbe | B P Gangar Constructions Pvt Ltd | 26/11/2025 |
| CC12504343 | Neville Dorab Panday | B P Gangar Constructions Pvt Ltd | 08/12/2025 |
| CC12600023 | Manju Manmohan Jagade | B P Gangar Constructions Pvt Ltd | 02/01/2026 |
| CC12601875 | ASHUTOSH GAJENDRA RAI | B P Gangar Constructions Pvt Ltd | 30/03/2026 |
| CC12602131 | Kersi Jamshed Divecha | B P Gangar Constructions Pvt Ltd | 11/04/2026 |
| CC12602262 | Chandrika Dilip Sanghvi | B P Gangar Constructions Pvt Ltd | 17/04/2026 |
| CC12602919 | Kishor Subhashchandra Mundargi | B P Gangar Constructions Pvt Ltd | 18/05/2026 |
| CC12603547 | ARCHITECT MILIND CHANGANI | B P Gangar Constructions Pvt Ltd | 09/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Mar 2024
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1-SKYE 31 as on March 2025.pdf | 29 Aug 2025 |
| Form 2File: Form 2 - Skye 31 as on March 2025.pdf | 29 Aug 2025 |
| Form 3File: Form 3 - Skye 31 as on March 2025.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29.pdf | 29 Aug 2025 |
| Certificates of CA (Form 3)File: Form 3 of Skye 31 as on 31-12-2024.pdf | 16 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on Dec 2024.pdf | 16 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Skye 31 as on Dec 2024.pdf | 13 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: 11 Certificates of CA (Form 3).pdf | 15 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Skye 31 as on September2024.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on September2024.pdf | 20 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Skye 31 as on June 2024.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Skye 31 as on 2nd Sep 2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 of Skye 31 as on 31-03-2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 of Skye 31 as on 30-06-2024.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on March 2024.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on 30-06-2024.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 16 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: 7 Certificates of CA (Form 3).pdf | 16 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Skye 31.pdf | 30 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Skye 31 as on March 2024.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on June 2023.pdf | 28 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on Sep 2023.pdf | 28 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on Dec 2023.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 - Skye 31 as on June 2023.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 - Skye 31 as on Sep 2023.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 - Skye 31 as on Dec 2023.pdf | 28 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Skye 31.pdf | 8 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Skye 31.pdf | 8 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Skye 31 as on Dec 2023.pdf | 5 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on Dec 2022.pdf | 9 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Skye 31 as on March 2023.pdf | 9 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 - Skye 31 as on Dec 2022.pdf | 9 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 - Skye 31 as on March 2023.pdf | 9 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Skye 31 as on March 2023.pdf | 24 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Skye 31 as on June 2023.pdf | 24 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Skye 31 for Qtr Sep 23.pdf | 24 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Skye 31 for June-23.pdf | 24 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Skye 31 as on 04-05-2023.pdf | 17 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Skye 31 Sept 2022 - Form 2.pdf | 15 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3- Skye 31 as on September 2022.pdf | 15 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Skye 31_compressed.pdf | 7 Feb 2023 |
| Building plan approvalFile: 2287585Amendletter_signed updated.pdf | 13 Jan 2023 |
| Building Plan Approval (IOD)File: 2287585Amendletter_signed updated.pdf | 13 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Skye 31.pdf | 30 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 4064_211229125444_001_compressed.pdf | 29 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4065_211229125457_001_compressed.pdf | 29 Dec 2021 |
| Details of Restarting of Construction work post lockdownFile: 3962_211210115413_001.pdf | 10 Dec 2021 |
| Declaration about Commencement CertificateFile: Declaration of CC.pdf | 8 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold desclosure_compressed.pdf | 8 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report_200225436320_For_Debtor_Based_Search_07_12_2021_13_55_32_671 (1).pdf | 7 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Gangar - 2018-19_compressed (1)_compressed.pdf | 7 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: March- 2020_compressed (1).pdf | 7 Dec 2021 |
| Copy of the legal title reportFile: Title certificate.pdf | 15 Jul 2021 |
| Building plan approvalFile: IOD-2020.pdf | 21 Aug 2020 |
| Building Plan Approval (IOD)File: IOD-2020.pdf | 21 Aug 2020 |
| Proforma of Allotment letterFile: Allotment Letter and Agreement for sale.pdf | 6 Mar 2019 |
| PAN CardFile: PAN- gangar.pdf | 14 Jan 2019 |
| Certificates of CA (Form 5)File: Form - 5.pdf | 14 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Vithoba.pdf | 23 Mar 2018 |
| Layout approvalFile: Layout Plan.pdf | 28 Jul 2017 |
| Building plan approvalFile: IOD2015.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Encumbrances Letter.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: IOD2015.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Form B RERA.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 28 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate2.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Agreement Letter Allotment Letter.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Skye 31 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadala
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
Godrej Horizon Phase I
Godrej Projects Development Ltd
Godrej Horizon Phase III
Godrej Projects Development Ltd
Godrej Horizon Phase II
Godrej Projects Development Ltd
Rustomjee Vista Bay
Xcellent Realty Private Limited
Dignity Bayview
DIGNITY REALTY AND HOUSING
New National Market Annexe
Suleman Haroon & Company
Builder: B P Gangar Constructions Pvt Ltd
B P Gangar Constructions Pvt Ltd has 1 registration on MahaRERA, including Skye 31. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if Skye 31 is delayed beyond 31 Jul 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Skye 31?
The registered promoter entity is B P Gangar Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Skye 31?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Skye 31?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Skye 31?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Skye 31?
The professionals named in the filing: Architect: Studio Changani Consultancy Company; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Skye 31?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback