Registered No litigation declared Residential / Group Housing project

Dignity Bayview

By DIGNITY REALTY AND HOUSING

RG-MH-73888 · RERA P51900048008 · Last updated on MahaRERA portal: 25 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 7 months from the original
12 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
80 of 191Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Dignity Bayview is a Residential / Group Housing project by DIGNITY REALTY AND HOUSING in Mumbai City, Maharashtra, registered with MahaRERA as P51900048008 on 7 Dec 2022. Possession is promised by 31 Jul 2027. The completion date has moved by 7 months from the original filing. 111 of the 191 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameDignity Bayview
  • TypeResidential / Group Housing
  • Location
    • Bhairavnath Mandir Marg Katrak Road
    • Wadala west
    • Mumbai City
    • 400031
  • Pincode400031
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900048008
  • ReraGenie IDRG-MH-73888

Builder

  • NameDIGNITY REALTY AND HOUSING
  • Entity typePartnership
  • PartnersAMBALAL JETHALAL PATEL, RAVI MANOHAR RAMCHANDANI, DHANJI KARAMSHI FATAK, KETAN JAYANTILAL FATAK, NARAN BHAGWANJI CHAUDHARI, BHARAT BILAMCHAND BHANDARI
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2022First promiseDec 2026Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed98 files

Current status

58%111 of 191 units booked

Figures as on 25 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DIGNITY BAYVIEWNA15151160116
SHREE BHAIRAVNATH HEIGHTSNA3023631275

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

DIGNITY BAYVIEW49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHREE BHAIRAVNATH HEIGHTS72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered150
BuildingClosed/CoveredTotal
DIGNITY BAYVIEW104104
SHREE BHAIRAVNATH HEIGHTS4646

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,391 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilation Authority
Permissible FSI18086.37
Proposed, not sanctioned12,586 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 2, 3 and 4, Gr Flr, Shree Krishna Gyan Mandir Patshala Bldg Station Rd, Wadala, Mumbai 40003

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associates
EngineerUnisteps consulting
Chartered AccountantN B Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
DIGNITY REALTY AND HOUSING-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01082621982Dec 2026 → Jul 2027

Reason as filed by the promoterThe delay in completion of the Project is primarily attributable to the statutory process involved in obtaining the Environmental Clearance (EC), which was applied for on 30/06/2025 and granted by SEIAA, Maharashtra on 23/12/2025, resulting in a material impact on the Project execution schedule. Subsequently, procurement constraints, financial limitations, and site-specific execution challenges further affected the progress of the balance works; accordingly, we request an extension until 31/07/2027 to complete the Project and fulfil all applicable regulatory requirements.

Litigation declared1

CaseCourtStatus
282/2021high court bombaytill date suit is pendng

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 of Dignity Bay View - FY 2024-25.pdf25 Aug 2026
Form 1File: Form 1 - Dignity Bayview as on Dec 2024.pdf24 Aug 2026
Form 2File: Form 2 - Dignity Bayview as on Dec 2024.pdf24 Aug 2026
Form 3File: Form 3 - Dignity Bayview as on Dec 2024.pdf24 Aug 2026
Disclosure of Sold and Booked InventoryFile: Dignity Bayview Circular 29.pdf24 Aug 2026
OthersFile: Architect Certificate - Dignity Bayview (1).pdf24 Aug 2026
Form 1File: Form 1 - Dignity Bayview as on March 2025.pdf21 Aug 2026
Form 2File: Form 2 - Dignity Bayview as on March 2025.pdf21 Aug 2026
Form 3File: Form 3 - Dignity Bayview as on March 2025.pdf21 Aug 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dignity Bayview as on March 2025.pdf21 Aug 2026
OthersFile: Architect Certificate - Dignity Bayview.pdf21 Aug 2026
Form 1File: Form 1 - Dignity Bayview as on June 2026.pdf22 Jul 2026
Form 2File: Form 2 - Dignity Bayview as on June 2026.pdf22 Jul 2026
Form 3File: Form 3 - Dignity Bayview as on June 2026.pdf22 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular-29- Dignity Bayview as on June 2026.pdf22 Jul 2026
Form 1File: Form 1 - Dignity Bayview as on March 2026.pdf9 Jul 2026
Form 2File: Form 2 - Dignity Bayview as on March 2026.pdf9 Jul 2026
Form 3File: Form 3 - Dignity Bayview as on March 2026.pdf9 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dignity Bayview March 2026.pdf9 Jul 2026
Form 2A (FY 2024-2025)File: Dignity_Bayview_Form2A_2024-25_03-07-2026_12-47 (1).pdf6 Jul 2026
Form 2A (FY 2022-2023)File: Dignity_Bayview_Form2A_2022-23.pdf6 Jul 2026
Form 2A (FY 2023-2024)File: Dignity_Bayview_Form2A_2023-24_.pdf6 Jul 2026
Form 2A (FY 2025-2026)File: Dignity_Bayview_Form2A_2025-26_.pdf4 Jul 2026
Form 1File: Form 1 - Dignity Bay View as on Dec 2025.pdf14 May 2026
Form 2File: Form 2 - Dignity Bay View as on Dec 2025.pdf14 May 2026
Form 3File: Form 3 - Dignity Bay View as on Dec 2025.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: Dignity Bayview Circular 29.pdf14 May 2026
Form 1File: Form 1 - Dignity Bayview as on June 2025.pdf3 Jan 2026
Form 2File: Form 2 - Dignity Bayview as on June 2025.pdf3 Jan 2026
Form 3File: Form 3 - Dignity Bayview as on June 2025.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dignity Bayview as on Sept 2025.pdf3 Jan 2026
Form 1File: Form 1 - Dignity Bayview as on Sept 2025.pdf19 Dec 2025
Form 2File: Form 2 - Dignity Bay View as on Sept 2025.pdf19 Dec 2025
Form 3File: Form 3 - Dignity Bay View as on Sept 2025.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dignity Bayview as on Sept 2025.pdf19 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bayview as on March 2025.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dignity Bayview as on March 2025.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dignity Bayview as on March 2025.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Dignity Bayview as on March 2025.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bayview as on Dec 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dignity Bayview as on Dec 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dignity Bayview_compressed.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Dignity Bayview Circular 29.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bay View as on Sep 2024.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dignity Bayview as on Sep 2024.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dignity Bayview as on Sep 2024.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Dignity Bayview as on Sep 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dignity Bayview as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bay View 30-06-2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dignity Bayview as on June 2024.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Digity Bayview as on June 2024.pdf8 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declaration of Grievance Redressal Cell.pdf28 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Dignity Bay View - FY 2023-24.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dignity Bayview as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Antal Aspire as on 31-03-2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bay View 31st March 2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Dignity Bayview Circular.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Dignity Bayview as on Dec 2023.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dignity Bayview as on Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bay View 31st December 2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dignity Bayview as on Dec 2023.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dignity Bayview as on September 2023.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bay View 30th Sept 2023.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Dignity Bay View FY 2022-23.pdf22 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dignity Bayview as on June 2023.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Dignity Bayview as on June 2023.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: Dignity Bayview Inventory.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dignity Bay View - March 2023.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: Circular 29- Dignity Bayview.pdf3 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dignity Bayview as on December 2022.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Dignity Bayview as on December 2022.pdf25 Jan 2023
Building plan approvalFile: Sale Plan - Dignity.pdf29 Nov 2022
Building plan approvalFile: Rehab 1-2_11zon.pdf29 Nov 2022
Building plan approvalFile: Rehab 3-5.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sale Plan - Dignity.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Rehab 1-2_11zon.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Rehab 3-5.pdf29 Nov 2022
Declaration about Commencement CertificateFile: 2 Other - Technical.pdf29 Nov 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DIGNITY DIVINEwadala mumbai 40003160CompletedDec 2022Jun 2022
Shree Datta Sai Towerwadala mumbai 40003114CompletedMar 2021Mar 2021
Dignity TowerPlot bearing no 319 of Sewree Wadala Scheme No 57 N Road NO 33 A Wadala W Mumbai 400 03131CompletedMar 2015Late, May 2015

How this compares with Mumbai City

58%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 7 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dignity Bayview on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadala west780+ in Mumbai City

2 kmDignity BayviewCompleted 77Lapsed / revoked 50Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 199 registered projects within 2 km.

Builder: DIGNITY REALTY AND HOUSING

DIGNITY REALTY AND HOUSING has 1 registration on MahaRERA, including Dignity Bayview. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Dignity Bayview is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dignity Bayview?

The registered promoter entity is DIGNITY REALTY AND HOUSING, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dignity Bayview?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dignity Bayview?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dignity Bayview?

The professionals named in the filing: Architect: Vilas Desai & Associates; Engineer: Unisteps consulting; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dignity Bayview?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dignity Bayview. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dignity Bayview to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.