ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / ISA FORMING THE PART OF COMPLEX AKHAND

Registered No litigation declared Residential / Group Housing project

ISA FORMING THE PART OF COMPLEX AKHAND

By TECHTON LIFESPACES LLP

RG-MH-07278 · RERA P99000054814 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 96%
68 of 164Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

ISA FORMING THE PART OF COMPLEX AKHAND is a Residential / Group Housing project by TECHTON LIFESPACES LLP in Palghar, Maharashtra, registered with MahaRERA as P99000054814 on 12 Feb 2024. Possession is promised by 30 Jun 2028. 96 of the 164 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameISA FORMING THE PART OF COMPLEX AKHAND
  • TypeResidential / Group Housing
  • Location
    • GOKHIVARE
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000054814
  • ReraGenie IDRG-MH-07278

Builder

  • NameTECHTON LIFESPACES LLP
  • Entity typePartnership
  • PartnersSUDHAKAR PANDURANG BAGWE, VIBHA VIKRANT BAGWE
  • Other registrations4 more →

Key dates

this monthRegisteredFeb 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

59%96 of 164 units booked
72.6%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING Q BUILDING NO 8 SECTOR 1NA25241568164

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 96%.

WING Q BUILDING NO 8 SECTOR 1: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%
Sanitary Fittings within the flats / premises32%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Open Space32

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area402 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
HARI ARJUN PATILVasai-Virar City (M Corp)Palghar
BABAN ARJUN PATILVasai-Virar City (M Corp)Palghar
GANESH NAMDEV PATILVasai-Virar City (M Corp)Palghar
NIRMALA MADHAV PATILVasai-Virar City (M Corp)Palghar
SUNIL MADHAV PATILVasai-Virar City (M Corp)Palghar
DIPAK MADHAV PATILVasai-Virar City (M Corp)Palghar
MAHENDRA MADHAV PATILVasai-Virar City (M Corp)Palghar
SHAILA VITTHAL PATILVasai-Virar City (M Corp)Palghar
GEETA SHARAD KOLIVasai-Virar City (M Corp)Palghar
KAISHREE NILKANTH PATILVasai-Virar City (M Corp)Palghar
PRADEEP NILKANTH PATILVasai-Virar City (M Corp)Palghar
BHARATI MAHESH KINIVasai-Virar City (M Corp)Palghar
KOMAL NILKANTH PATILVasai-Virar City (M Corp)Palghar
CHANDRA SADANAND PATILVasai-Virar City (M Corp)Palghar
SAVITA HARISHCHANDRA PATILVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI5717.07
Proposed, not sanctioned5,717 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 1 TO 4 OFFICE NO 1 TO 2 VARALAXMI CHS LTD 22 HANUMAN ROAD VILLEPARLE EAST MUMBA
Estimated costRs 35.12 cr
Cost incurredRs 25.50 cr
Work done72.62%
BuildingWingEstimatedIncurred
WING Q BUILDING NO 8 SECTOR 1NARs 31.30 crRs 25.50 cr
-NARs 3.81 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanat Mehta
EngineerS P Bagwe Consultants Private Limited
Chartered AccountantSwapnesh and Vinit
Chartered AccountantChintan D Saiya & Company
PartnerRole in project
TECHTON LIFESPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 3_Form 1_Q ISA Wing - Q4 FY 2025-26.pdf20 May 2026
Withdrawal Update Form 1File: 3_Form 1_Q ISA Wing - Q4 FY 2025-26.pdf20 May 2026
Withdrawal Update Form 2File: 3_Form 2_ISA Q Wing_Q4 FY 2025-26.pdf20 May 2026
Withdrawal Update Form 2File: 3_Form 2_ISA Q Wing_Q4 FY 2025-26.pdf20 May 2026
Withdrawal Update Form 3File: 3_Form 2_ISA Q Wing_Q4 FY 2025-26.pdf20 May 2026
Withdrawal Update Form 3File: 01 Form 3 - Akhand Phase 1 - Q Wing - Q4 of FY 2025-26.pdf20 May 2026
Form 2A (FY 2025-2026)File: From 2A_ISA.pdf20 May 2026
Withdrawal Update Form 1File: Akhand Phase 1 Wing Q.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 ISA Wing Q.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 ISA Wing Q_compressed.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1_WING Q.pdf13 Feb 2026
Withdrawal Update Form 2File: FORM 2_WING Q.pdf13 Feb 2026
Withdrawal Update Form 3File: FORM 3_ WING Q.pdf13 Feb 2026
Form 5 (FY 2024-2025)File: Form-5-FY-2024-25.pdf1 Oct 2025
Withdrawal Update Form 1File: 01_ Form-1 Artichect Certificate.pdf26 Aug 2025
Withdrawal Update Form 1File: 01_ Form-1 Artichect Certificate.pdf26 Aug 2025
Withdrawal Update Form 1File: 01_ Form-1 Artichect Certificate.pdf26 Aug 2025
Withdrawal Update Form 2File: 02_Form-2 Engineer Certificate.pdf26 Aug 2025
Withdrawal Update Form 2File: 02_Form-2 Engineer Certificate.pdf26 Aug 2025
Withdrawal Update Form 2File: 02_Form-2 Engineer Certificate.pdf26 Aug 2025
Withdrawal Update Form 3File: 3_Form-3 Q1 Q.PDF26 Aug 2025
Withdrawal Update Form 3File: 3_Form-3 Q1 Q.PDF26 Aug 2025
Withdrawal Update Form 3File: 3_Form-3 Q1 Q.PDF26 Aug 2025
Form 1File: 1_Form 1 - Q4 - 31-03-2025.pdf26 Jul 2025
Form 2File: 2_Form 2 - Q4 - 31-03-2025.pdf26 Jul 2025
Form 3File: 4_Form 3 - Q4 - 31-03-2025.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - WING Q_FY 24-25_Q4.pdf26 Jul 2025
Form 1File: 1_Form 1 - Q3 - 31-12-2024.pdf26 Jul 2025
Form 2File: 2_Form 2 - Q3 - 31-12-2024.pdf26 Jul 2025
Form 3File: 3_Form 3 - Q3 - 31-12-2024.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - WING Q_FY 24-25_Q3.pdf26 Jul 2025
Form 1File: 1_Form 1 - Q2 - 30-09-2024.pdf26 Jul 2025
Form 2File: 2_Form 2 - Q2 - 30-09-2024.pdf26 Jul 2025
Form 3File: 3_Form 3 - Q2 - 30-09-2024.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - WING Q_FY 24-25_Q2.pdf26 Jul 2025
Form 1File: 1_Form 1 - Q1 - 30-06-2024.pdf26 Jul 2025
Form 2File: 2_Form 2 - Q1 - 30-06-2024.pdf26 Jul 2025
Form 3File: 3_Form 3 - Q1 - 30-06-2024.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - WING Q_FY 24-25_Q1.pdf26 Jul 2025
Form 1File: 1_Form 1 - Q4 - 31-03-2024.pdf26 Jul 2025
Form 2File: Form 2 - RERA Reg.pdf26 Jul 2025
Form 3File: Form 3 FY 2023-24.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - WING Q - FY 23-24 - Q4.pdf26 Jul 2025
Form 2A (FY 2024-2025)File: 3_FORM 2A_Wing Q_FY 24-25.pdf26 Jul 2025
Form 5 (FY 2023-2024)File: Signed FORM 5_WING Q_2.pdf11 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3 - 31 March 2025 - ISA Q Wing.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Q3 - 31-12-2023.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Q4 - 31-03-2024.pdf18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_FY 23-24.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE F-1 OCT-DEC'24- Q Wing.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - ISA Q Wing - Q3 - 31st Dec 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_WING-Q_Q2_FY 2024-25.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_WING-Q_Q1_FY 2024-25_3.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TECHTON LLP WING Q 31032024.pdf1 May 2024
Building plan approvalFile: declaration for layout and building plan approval.pdf25 Jan 2024
Building plan approvalFile: Building Plan Approval NA Order for plotted development.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: declaration for layout and building plan approval.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval NA Order for plotted development.pdf25 Jan 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT WING Q.pdf12 Jan 2024
Other - LegalFile: Form B - Land owner - Sai Rydam OK.pdf12 Jan 2024
Layout approvalFile: Layout Approval.pdf9 Jan 2024
Layout approvalFile: POA_merged.pdf9 Jan 2024
Building plan approvalFile: Building Plan Approval NA Order for plotted development.pdf9 Jan 2024
Building plan approvalFile: POA_merged.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: POA_merged.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval NA Order for plotted development.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: POA_merged.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: POA_merged.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf16 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginer Certificate.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf16 Dec 2023
Proforma of Allotment letterFile: Allotment Letter - Wing Q.pdf16 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation on Allotment Letter.pdf16 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation on Agreement for Sale Report.pdf16 Dec 2023
Proforma of Agreement for saleFile: RERA Agreement Wing Q.pdf15 Dec 2023
PAN CardFile: PAN Card.pdf14 Dec 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance and Legal.pdf14 Dec 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance and Legal.pdf14 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Letter - CC.pdf14 Dec 2023

How this compares with Palghar

59%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ISA FORMING THE PART OF COMPLEX AKHAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

Builder: TECHTON LIFESPACES LLP

TECHTON LIFESPACES LLP has 5 registrations on MahaRERA, including IRA FORMING PART OF THE COMPLEX AKHAND and ORA FORMING PART OF THE COMPLEX AKHAND. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ISA FORMING THE PART OF COMPLEX AKHAND is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ISA FORMING THE PART OF COMPLEX AKHAND?

The registered promoter entity is TECHTON LIFESPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ISA FORMING THE PART OF COMPLEX AKHAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ISA FORMING THE PART OF COMPLEX AKHAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ISA FORMING THE PART OF COMPLEX AKHAND?

The professionals named in the filing: Architect: Sanat Mehta; Engineer: S P Bagwe Consultants Private Limited; Chartered Accountant: Swapnesh and Vinit; Chartered Accountant: Chintan D Saiya & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ISA FORMING THE PART OF COMPLEX AKHAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ISA FORMING THE PART OF COMPLEX AKHAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ISA FORMING THE PART OF COMPLEX AKHAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.