ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Irasa Park Phase 1

Registered No litigation declared Others project

Irasa Park Phase 1

By SUBURBAN SPACES LLP

RG-MH-26878 · RERA P51700010540 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 90%
42 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

Irasa Park Phase 1 is a Others project by SUBURBAN SPACES LLP in Palghar, Maharashtra, registered with MahaRERA as P51700010540 on 31 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 18 of the 60 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameIrasa Park Phase 1
  • TypeOthers
  • Location
    • Haranwadi road
    • Village Mahim
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010540
  • ReraGenie IDRG-MH-26878

Builder

  • NameSUBURBAN SPACES LLP
  • Entity typePartnership
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed126 files

Current status

30%18 of 60 units booked
93.8%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
3NA5560060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

3: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Open Space8

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,987 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritycollector officer palghar
Permissible FSI2337.8
Proposed, not sanctioned2,338 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP GHANTALI MANDIR NAUPADA THANE WEST 400602
Estimated costRs 10.96 cr
Cost incurredRs 10.28 cr
Work done93.8%
BuildingWingEstimatedIncurred
-NARs 6.43 crRs 6.43 cr
3NARs 4.53 crRs 3.85 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOdyssey architects and associates
EngineerHIGH VISION & ASSOCIATES
Chartered AccountantAshok Chandanshive & Co. Chartered Accountants
PartnerRole in project
SUBURBAN SPACES LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000013718Dec 2022 → Dec 2025

Reason as filed by the promoterDue to unavoidable circumstances, we could not complete the project on time and hence seek for extension of the same.

EA03022619685Dec 2022 → Dec 2027

Reason as filed by the promoter•The completion of the project has been delayed due to circumstances beyond the control of the promoter. The construction activities were affected by delays in approvals from concerned authorities, shortage of skilled manpower, and intermittent disruption in the supply of construction materials. Despite best efforts made by the promoter to adhere to the original timeline, these unforeseen factors have impacted the progress of the project. •The promoter is committed to completing the project at the earliest with maintained quality standards and therefore seeks an extension of the project comple

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: IRASA PARK FORM 1 MARCH 2026.pdf12 May 2026
Withdrawal Update Form 2File: IRASA PARK FORM 2 MARCH 2026.pdf12 May 2026
Withdrawal Update Form 3File: Irasa form 3 - Q4 IRASA PARK.pdf12 May 2026
Withdrawal Update Form 1File: form 1 irasa park.pdf3 Feb 2026
Withdrawal Update Form 1File: IRASA PARK PHASE I FORM 1 ARCHITECT CERTIFICATE.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 dec 2025 park.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 June 25.pdf3 Feb 2026
Withdrawal Update Form 2File: IRASA PARK PHASE I FORM 2 ENGENEER CERTIFICATE SEPTEMBER 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 dec 2025_11zon.pdf3 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE IRASA PARK JUNE 2025_11zon.pdf3 Feb 2026
Withdrawal Update Form 3File: FORM 3 IRASA PARK CA CERTIFICATE SEPTEMBER 2025_11zon.pdf3 Feb 2026
Withdrawal Update Form 3File: fORM 3 IRASA PARK DEC 2025 final.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Form 2 A park_11zon.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 Irasa Park.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 IRASA Park_11zon.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 IRASA Park_11zon.pdf2 Feb 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 24.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Sep 24_compressed.pdf7 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Dec 24.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Sep 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Irasa Park P-1 March 24.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Irasa Park P-1 June 24.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Irasa Park P-1 September 24.pdf20 Dec 2024
Certificates of CA (Form 3)File: Irasa Park P-1 Form 3 June 24.pdf20 Dec 2024
Certificates of CA (Form 3)File: Irasa Park P-1 Form 3 Sept 24.pdf20 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Irasa Park P-1 March 24.pdf20 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Irasa Park P-1 June 24.pdf20 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Irasa Park P-1 Septmeber 24.pdf20 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Irasa Park P-1 2024.pdf20 Dec 2024
Certificates of CA (Form 3)File: Form 3_1_compressed.pdf23 Feb 2024
Certificates of CA (Form 3)File: Form 3_2_compressed.pdf23 Feb 2024
Certificates of CA (Form 3)File: Form 3_3_compressed.pdf23 Feb 2024
Declaration about Commencement CertificateFile: Declaration about CC Suburban spaces.pdf19 Feb 2024
Declaration in FORM BFile: Form B-AFFIDAVIT CUM DECLARATION ABRAR Suburban Spaces.pdf19 Feb 2024
Disclosure of sold/ booked inventoryFile: Suburban Spaces LLP Disclosure of sold.pdf19 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 2023.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2023.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 jan 2024.pdf13 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A jan 2024.pdf13 Feb 2024
CERSAI detailsFile: CERSAI.pdf13 Feb 2024
Certificates of CA (Form 3)File: Form 3 jun 2023.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Arbar Ahmed.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest murlidharan.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Parvez Alam.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Shafique Ahmed.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Acc Details.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ajay wade - Phase-I Certificate.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ajay wade - Phase-I Certificate.pdf17 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate irasa park phase 1.pdf17 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate irasa park phase 1.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: irasa park phase 1 quality engineer.pdf17 Apr 2023
Certificates of CA (Form 3)File: Form-3 Phase-1_0001.pdf17 Apr 2023
Certificates of CA (Form 3)File: Form-3 Phase-1_0001.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ENGINEER CERTIFICATE FORM 2A.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IRASA PARK 1_11zon.pdf5 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRASA PARK PHASE I ENGINEER CERTIFICATE (1)_compressed (1).pdf31 Dec 2022
Certificates of CA (Form 3)File: Chartered Accountants_ Suburban Spaces LLP phase 1.pdf31 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Adobe Scan 18 Apr 2022_compressed.pdf22 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: irasa park phase 1 engineer certificate 28 March 2022_compressed.pdf22 May 2022
Certificates of CA (Form 3)File: phase1.pdf22 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate for irasa park phase I.pdf31 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate irasa park phase 1.pdf31 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate phase 1.pdf30 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: irasa park phase 1 engineer certificate.pdf30 Sep 2021
Certificates of CA (Form 3)File: c a certificate irasa park phase 1.pdf30 Sep 2021
Certificates of CA (Form 3)File: C A CERTIFICATE FOR IRASA PARK PHASE 1.pdf5 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FOR IRASA PARK PHASE 1.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FOR IRASA PARK PHASE 1.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-min.pdf31 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-min (2).pdf31 Mar 2021
Certificates of CA (Form 5)File: phase 1 (1).pdf31 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf31 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf31 Dec 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rose GardensSurvey 220 Off Mumbai Nashik Highway Adjacent to Parivar Garden Hotel Asangaon West Taluka Shahapur District Thane 421301.181CompletedSep 2014Late, Mar 2015

How this compares with Palghar

30%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 60 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Irasa Park Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Mahim3,200+ in Palghar

2 kmIrasa Park Phase 1Completed 20Lapsed / revoked 29Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: SUBURBAN SPACES LLP

SUBURBAN SPACES LLP has 3 registrations on MahaRERA, including Irasa Greens and Irasa Park Phase 1. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Irasa Park Phase 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Irasa Park Phase 1?

The registered promoter entity is SUBURBAN SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Irasa Park Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Irasa Park Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Irasa Park Phase 1?

The professionals named in the filing: Architect: Odyssey architects and associates; Engineer: HIGH VISION & ASSOCIATES; Chartered Accountant: Ashok Chandanshive & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Irasa Park Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Irasa Park Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Irasa Park Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.