Home / Browse projects / Thane, Maharashtra / IRA INSIGNIA

Registered No litigation declared Residential / Group Housing project

IRA INSIGNIA

By IRA HOMES

RG-MH-78355 · RERA P51700031409 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 80%
337 of 338Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

IRA INSIGNIA is a Residential / Group Housing project by IRA HOMES in Thane, Maharashtra, registered with MahaRERA as P51700031409 on 23 Oct 2021. Possession is promised by 31 Dec 2026. 1 of the 338 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameIRA INSIGNIA
  • TypeResidential / Group Housing
  • Location
    • Shankeshwar Nagar
    • Dombivli East
    • Bhopar
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031409
  • ReraGenie IDRG-MH-78355

Builder

  • NameIRA HOMES
  • Entity typePartnership
  • PartnersHiren Kantilal Vador, Ketan Kantilal Vador

Key dates

this monthRegisteredOct 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed111 files

Current status

0%1 of 338 units booked
14.5%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA332818018
Building No 2NA33281600160
Building No 3NA33281600160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 80%.

Building No 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 230%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)20%
Plinth100%
Stilt Floor100%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 339%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)80%
Plinth100%
Stilt Floor100%
Slabs of Super Structure32%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots199
Open Space199
BuildingOpen SpaceTotal
Building No 17070
Building No 26565
Building No 36464

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Balaram Shankar DesaleBhoparThane
Pandurang Shankar DesaleBhoparThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI33210.16
Proposed, not sanctioned2,992 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMulund West
Estimated costRs 212.34 cr
Cost incurredRs 30.86 cr
Work done14.53%
BuildingWingEstimatedIncurred
Building No 3NARs 212.34 crRs 30.86 cr

Certifying professionals and partners12

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Nirgude
ArchitectNitin Gunjal
ArchitectSpeco Architect
EngineerMilind Shinde
EngineerAnup Save
EngineerTarique Anwer
EngineerDivyesh Jaiswar
EngineerSam F Nadar
Chartered AccountantPrashant Rane
Chartered AccountantVIKKI R SAID
Chartered AccountantAA Mahore & Co
Chartered AccountantHitesh K Chandra & Co
PartnerRole in project
IRA HOMES-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12400706Kanti ShahIRA HOMES08/11/2024
CC12500570Amit Vitthal SalaskarIRA HOMES19/02/2025
CC12602499Mohan Rajkumar KumharIRA HOMES29/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM_2Q_0001_Compressed_00001.pdf2 Jun 2026
Withdrawal Update Form 1File: FORM_3Q_0001_Compressed_00001.pdf2 Jun 2026
Withdrawal Update Form 1File: FORM_4Q_0001_Compressed_00001.pdf2 Jun 2026
Withdrawal Update Form 2File: FORM_2Q_0001_Compressed_00002.pdf2 Jun 2026
Withdrawal Update Form 2File: FORM_3Q_0001_Compressed_00002.pdf2 Jun 2026
Withdrawal Update Form 2File: FORM_4Q_0001_Compressed_00002.pdf2 Jun 2026
Withdrawal Update Form 3File: FORM_2Q_0001_Compressed_00003.pdf2 Jun 2026
Withdrawal Update Form 3File: FORM_3Q_0001_Compressed_00003.pdf2 Jun 2026
Withdrawal Update Form 3File: FORM_4Q_0001_Compressed_00003.pdf2 Jun 2026
Withdrawal Update Form 1File: FORM_1Q_0001_Compressed_00001.pdf16 Jul 2025
Withdrawal Update Form 2File: FORM_1Q_0001_Compressed_00002.pdf16 Jul 2025
Withdrawal Update Form 3File: FORM_1Q_0001_Compressed_00003.pdf16 Jul 2025
Form 2A (FY 2025-2026)File: FORM_1Q_0001_Compressed_000000.pdf16 Jul 2025
Withdrawal Update Form 1File: FORM_4Q_0001_Compressed_00001.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM_4Q_0001_Compressed_00002.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM_4Q_0001_Compressed_00003.pdf11 Jul 2025
Withdrawal Update Form 1File: FORM_4Q_0001_Compressed_00001.pdf10 Jul 2025
Withdrawal Update Form 2File: FORM_4Q_0001_Compressed_00002.pdf10 Jul 2025
Withdrawal Update Form 3File: FORM_4Q_0001_Compressed_00003.pdf10 Jul 2025
Form 5 (FY 2022-2023)File: FORM_0001_Compressed_0000000_.pdf10 Jul 2025
Form 5 (FY 2023-2024)File: FORM_0001_Compressed_0000000_.pdf10 Jul 2025
Form 1File: FORM_3Q_0001_Compressed_00001.pdf9 Jul 2025
Form 2File: FORM_3Q_0001_Compressed_00002.pdf9 Jul 2025
Form 3File: FORM_3Q_0001_Compressed_00003.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_3Q_0001_Compressed_00000.pdf9 Jul 2025
Form 1File: FORM_4Q_0001_Compressed_00001.pdf9 Jul 2025
Form 2File: FORM_4Q_0001_Compressed_00002.pdf9 Jul 2025
Form 3File: FORM_4Q_0001_Compressed_00003.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_4Q_0001_Compressed_00000.pdf9 Jul 2025
Form 2A (FY 2021-2022)File: FORM_0001_Compressed_000000.pdf9 Jul 2025
Form 2A (FY 2022-2023)File: FORM_0001_Compressed_000000.pdf9 Jul 2025
Form 2A (FY 2023-2024)File: FORM_0001_Compressed_000000.pdf9 Jul 2025
Form 2A (FY 2024-2025)File: FORM_0001_Compressed_000000.pdf9 Jul 2025
Form 5 (FY 2021-2022)File: FORM_0001_Compressed_0000000.pdf9 Jul 2025
Form 1File: FORM_1Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_1Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_1Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_1Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_2Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_2Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_2Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_2Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_3Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_3Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_3Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_3Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_4Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_4Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_4Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_4Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_1Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_1Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_1Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_1Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_2Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_2Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_2Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_2Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_3Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_3Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_3Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_3Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_4Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_4Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_4Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_4Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_1Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_1Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_1Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_1Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_2Q_0001_Compressed_00001.pdf8 Jul 2025
Form 2File: FORM_2Q_0001_Compressed_00002.pdf8 Jul 2025
Form 3File: FORM_2Q_0001_Compressed_00003.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM_2Q_0001_Compressed_00000.pdf8 Jul 2025
Form 1File: FORM_4Q_0001_Compressed_00001.pdf28 Jun 2025
Form 2File: FORM_4Q_0001_Compressed_00002.pdf28 Jun 2025
Form 3File: FORM_4Q_0001_Compressed_00003.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: FORM_4Q_0001_Compressed_00000.pdf28 Jun 2025
Form 1File: FORM_3Q_0001_Compressed_00001.pdf28 Jun 2025
Form 2File: FORM_3Q_0001_Compressed_00002.pdf28 Jun 2025

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IRA INSIGNIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli East7,600+ in Thane

2 kmIRA INSIGNIACompleted 1Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: IRA HOMES

IRA HOMES has 1 registration on MahaRERA, including IRA INSIGNIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if IRA INSIGNIA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IRA INSIGNIA?

The registered promoter entity is IRA HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IRA INSIGNIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against IRA INSIGNIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for IRA INSIGNIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IRA INSIGNIA?

The professionals named in the filing: Architect: Anil Nirgude; Architect: Nitin Gunjal; Architect: Speco Architect; Engineer: Milind Shinde; Engineer: Anup Save; Engineer: Tarique Anwer. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IRA INSIGNIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IRA INSIGNIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IRA INSIGNIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.