Home / Browse projects / Pune, Maharashtra / Infinia Vista
Infinia Vista
RG-MH-31213 · RERA P52100079547 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Infinia Vista is a Residential / Group Housing project by Sunil Wamanrao Shinde in Pune, Maharashtra, registered with MahaRERA as P52100079547 on 11 Mar 2025. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 7 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameInfinia Vista
- TypeResidential / Group Housing
- Location
- Bavdhan
- Mulshi
- Pune
- 411021
- Pincode411021
- RERA no.P52100079547
- ReraGenie IDRG-MH-31213
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Mar 2025
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Infinia Vista | NA | 12 | 10 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.
Infinia Vista: 55% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed55
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shobhana Yeshwant Yadav | Bavdhan Kh. | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Infinia Vista | NA | Rs 11.97 cr | Rs 9.58 cr |
| - | NA | Rs 1.33 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nikhil R Kokate |
| Engineer | Ashish R Kokate |
| Chartered Accountant | JSVL & CO LLP CA Jagdish Salunkhe |
| Chartered Accountant | Jayaraman Associates CA Lalitha Iyer |
| Partner | Role in project |
|---|---|
| Sunil Wamanrao Shinde | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction progress of the project Infinia Vista has been affected due to shortage of skilled labour force and irregular availability of essential raw materials, which resulted in delay in the execution of construction activities. Further, upon receipt of the latest sanctioned plans for the project, certain revisions and alignment in the ongoing construction work were required as per the approved plans, which also contributed to the delay in project completion. As per the revised course of action, the remaining work shall be completed within the extended timeline requested, and the Compl
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Nov 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Q1 Vista.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Q1 Vista.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Q1 Vista .pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate -Form 1.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Certificate Form 2.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: C A Certificate Form 3.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Form 1 Q3 Vista Rera.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 RERA.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 RERA Format Q3 Vista_compressed.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 (1).pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate - Correction Final.pdf | 6 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A (1).pdf | 31 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Annual RERA Audit FY 2024-25.pdf | 31 Jan 2026 |
| Layout approvalFile: Layout Approved.pdf | 28 Nov 2025 |
| Building plan approvalFile: Building Plan.pdf | 28 Nov 2025 |
| Layout approvalFile: Layout Approved.pdf | 28 Nov 2025 |
| Building plan approvalFile: Building Plan.pdf | 28 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 (1).pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form3.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RERA.pdf | 25 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 RERA.pdf | 25 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 RERA.pdf | 25 Aug 2025 |
| Commencement certificateFile: commencement certification.pdf | 17 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 RERA.pdf | 17 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 RERA.pdf | 17 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 RERA.pdf | 17 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 RERA.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 RERA.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 RERA.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 RERA.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 RERA.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 RERA.pdf | 16 Jul 2025 |
| Form 1File: Form 1 (1).pdf | 11 Jul 2025 |
| Form 2File: Form 2.pdf | 11 Jul 2025 |
| Form 3File: Form 3_compressed.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Format Rera Format.pdf | 11 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 RERA.pdf | 11 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 RERA.pdf | 11 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 RERA.pdf | 11 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Format Rera Format.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 21 Apr 2025 |
| Layout approvalFile: sanction plan.pdf | 16 Mar 2025 |
| Building plan approvalFile: sanction plan.pdf | 16 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: sanction plan.pdf | 16 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certification.pdf | 16 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: sanction plan.pdf | 16 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 15 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration for Unit to be allotted to Landowners.pdf | 21 Feb 2025 |
| Other - FinanceFile: Declaration for Unit to be allotted to Landowners.pdf | 17 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Mail.pdf | 7 Feb 2025 |
| Other - TechnicalFile: CC Mail.pdf | 7 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report to Agreement Letter.pdf | 7 Feb 2025 |
| Proforma of Agreement for saleFile: Agreement Letter Final.pdf | 7 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation report with respect to allottment letter.pdf | 6 Feb 2025 |
| Layout approvalFile: Layout and Building Plan.pdf | 4 Feb 2025 |
| Building plan approvalFile: Layout and Building Plan.pdf | 4 Feb 2025 |
| PAN CardFile: PAN Card.pdf | 4 Feb 2025 |
| Copy of the legal title reportFile: Search Title Report.pdf | 4 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf | 4 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Layout and Building Plan.pdf | 4 Feb 2025 |
| Proforma of Allotment letterFile: Allotment Letter Final.pdf | 4 Feb 2025 |
| Declaration in FORM BFile: Form B -Declaration by promoter.pdf | 4 Feb 2025 |
| Declaration in FORM BFile: Form B -Declaration by land owner.pdf | 4 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Compressed.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 4 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 4 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout and Building Plan.pdf | 4 Feb 2025 |
| Other - LegalFile: Partition Deed.pdf | 4 Feb 2025 |
| Other - LegalFile: 7-12 Extract.pdf | 4 Feb 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 4 Feb 2025 |
| CERSAI detailsFile: Asset Based Search.pdf | 4 Feb 2025 |
| CERSAI detailsFile: Cersai Declaration.pdf | 4 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration Format A for Promoter.pdf | 4 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf | 4 Feb 2025 |
| Other - TechnicalFile: Declaration cum Undertaking for Multiple registration for same project.pdf | 4 Feb 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Infinia Spring HillsP52100052122 | Shinde Nagar, Pune | Jul 2023 | Certificate Signed | Jul 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Infinia Vista on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bavdhan13,700+ in Pune
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Sunil Wamanrao Shinde
Sunil Wamanrao Shinde has 3 registrations on MahaRERA, including Infinia Spring Hills and Infinia Vista. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Infinia Vista is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Infinia Vista?
The registered promoter entity is Sunil Wamanrao Shinde, an individual as per the filing. Its GSTIN 27ACNPS6798N2Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Infinia Vista?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Infinia Vista?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Infinia Vista?
The professionals named in the filing: Architect: Nikhil R Kokate; Engineer: Ashish R Kokate; Chartered Accountant: JSVL & CO LLP CA Jagdish Salunkhe; Chartered Accountant: Jayaraman Associates CA Lalitha Iyer. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Infinia Vista?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback