Home / Browse projects / Palghar, Maharashtra / Imperial Splendora F wing
Imperial Splendora F wing
RG-MH-76249 · RERA P99000032507 · Last updated on MahaRERA portal: 28 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Imperial Splendora F wing is a Residential / Group Housing project by Imperial Realtors in Palghar, Maharashtra, registered with MahaRERA as P99000032507 on 10 Jan 2022. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 125 of the 138 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameImperial Splendora F wing
- TypeResidential / Group Housing
- Location
- Gokhivare
- Vasai East
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000032507
- ReraGenie IDRG-MH-76249
Builder
- NameImperial Realtors
- Entity typePartnership
- PartnersGangaram Mukund, Ramesh Mukund, Naresh Mukund, Yogita Bhoir
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Jan 2022
- Promised completion30 Apr 2028
- Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
- Buildings1 building record
- Documents filed103 files
Current status
Figures as on 28 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F Wing | NA | 23 | 23 | 123 | 15 | 138 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
F Wing: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| F Wing | NA | Rs 22.55 cr | Rs 22.72 cr |
| - | NA | Rs 6.60 cr | Rs 4.66 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanat Mehta & Associates |
| Engineer | Dilip Parekh |
| Engineer | Jitendra Nayak |
| Chartered Accountant | Kothari Jain & Associates |
| Chartered Accountant | Shubham Kothari & Associates |
| Partner | Role in project |
|---|---|
| Imperial Realtors | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2028
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: From 1.pdf | 28 Sep 2026 |
| Withdrawal Update Form 2File: From 2.pdf | 28 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 wing F_compressed.pdf | 28 Sep 2026 |
| Form 1File: From 1.pdf | 11 Aug 2026 |
| Form 2File: From 2.pdf | 11 Aug 2026 |
| Form 3File: From 3.pdf | 11 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and unsold Inventory.pdf | 11 Aug 2026 |
| Form 2A (FY 2025-2026)File: FORM-2A Fwing FY 2025 26.pdf | 11 Aug 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 F WING FY 2024 25.pdf | 11 Aug 2026 |
| Form 1File: FORM-1 F.pdf | 30 Apr 2026 |
| Form 2File: FORM 2.pdf | 30 Apr 2026 |
| Form 3File: FORM 3.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE F.pdf | 30 Apr 2026 |
| Form 1File: Form-1.pdf | 20 Jan 2026 |
| Form 2File: Form-2.pdf | 20 Jan 2026 |
| Form 3File: Form-3.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - F.pdf | 20 Jan 2026 |
| Form 1File: Form-1 F.pdf | 4 Nov 2025 |
| Form 2File: Form-2.pdf | 4 Nov 2025 |
| Form 3File: Form-3.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure F.pdf | 4 Nov 2025 |
| Form 1File: Form-1 F.pdf | 28 Jul 2025 |
| Form 2File: Form-2.pdf | 28 Jul 2025 |
| Form 3File: Form-3_compressed.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 28 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1F.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 4 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Imperial Splendora F.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 F.pdf | 11 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure F.pdf | 11 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 wing F.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 wing F.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 wing F.pdf | 31 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: F wing Disclosure.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 wing F_compressed.pdf | 31 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 22 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Detals Declaration - Format A.pdf | 22 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances (Legal) declaration format.pdf | 16 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances (Legal) declaration format.pdf | 16 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec 23.pdf | 16 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosre March 23.pdf | 16 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure June 23.pdf | 16 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sep 23.pdf | 16 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure December 23.pdf | 16 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 16 Mar 2024 |
| Proforma of Agreement for saleFile: Model Agreement For Sale - RERA.pdf | 16 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION LETTER FOR ALLOTMENT LETTER -Clean.pdf | 16 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION LETTER FOR AGREEMENT FOR SALE-Clean.pdf | 16 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 F Jan - March 2023.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April-June 2023.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July-Sep 2023.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct - Dec 23 Wing F.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 23.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 23.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023_11zon.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2023_11zon.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023_11zon.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023_11zon.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 october to December 2023_11zon.pdf | 15 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Imperial Realtors(2021-22).pdf | 8 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Imperial Realtors(2022-23).pdf | 8 Mar 2024 |
| Building plan approvalFile: Sheet 1_compressed.pdf | 14 Oct 2023 |
| Building plan approvalFile: Sheet 2_compressed.pdf | 14 Oct 2023 |
| Building plan approvalFile: Sheet 3_compressed.pdf | 14 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 1_compressed.pdf | 14 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 2_compressed.pdf | 14 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 3_compressed.pdf | 14 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf | 14 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Imperial Splendora F wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vasai East3,200+ in Palghar
Filed coordinates, straight-line distance. 138 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: Imperial Realtors
Imperial Realtors has 1 registration on MahaRERA, including Imperial Splendora F wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Imperial Splendora F wing is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Imperial Splendora F wing?
The registered promoter entity is Imperial Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Imperial Splendora F wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Imperial Splendora F wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Imperial Splendora F wing?
The professionals named in the filing: Architect: Sanat Mehta & Associates; Engineer: Dilip Parekh; Engineer: Jitendra Nayak; Chartered Accountant: Kothari Jain & Associates; Chartered Accountant: Shubham Kothari & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Imperial Splendora F wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback