IHITA C AND D BUILDING

By Nayana Anand Kaswa

RG-MH-24208 · RERA P52100009220 · Last updated on MahaRERA portal: 11 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

IHITA C AND D BUILDING is a Residential / Group Housing project by Nayana Anand Kaswa in Pune, Maharashtra, registered with MahaRERA as P52100009220 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 72 months from the original filing.

At a glance

Project

  • NameIHITA C AND D BUILDING
  • TypeResidential / Group Housing
  • Location
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100009220
  • ReraGenie IDRG-MH-24208

Builder

  • NameNayana Anand Kaswa
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IHITA C BuildingNA90000
IHITA D buildingNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

IHITA C Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
IHITA D building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,150 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Krishna Daulatrao MokashiBavadhan BKPune

Approvals and building plan

Permissible FSI1553.92
Proposed, not sanctioned1,304 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchbibwewadi kondhwa road bibwewadi pune 37

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak Honkan
EngineerSK Consultants & Engineers
Chartered AccountantGaurav S Rajpal & Co
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Nayana Anand Kaswa-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016854Dec 2019 → Mar 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 90% allottees for purpose of extension of RERA registration period of the said project.

EXT52100005354Dec 2019 → Dec 2020

Reason as filed by the promoterdue to heavy rain for more than four Months flood situation on aproch road to the project and due to that most of the labours, contractors and other agencies were absent.

EXT52100027362Dec 2019 → Apr 2025

Reason as filed by the promoterI, Nayana Anand Kaswa, the promoter of the project Ihita C And D Building (Registration No. P52100009220) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension unt

EXT52100028362Dec 2019 → Dec 2025

Reason as filed by the promoter.I, Nayana Anand Kaswa, the promoter of the project Ihita C And D Building (Registration No. P52100009220) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension un

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jun 2025

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC and OC verification Mail.pdf11 Sep 2025
Occupational CertificateFile: OC- PUNEMETROPOLIS.pdf7 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- PUNEMETROPOLIS.pdf26 Jun 2025
Declaration in FORM BFile: Form B.pdf20 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2025.pdf20 Jun 2025
Certificates of CA (Form 3)File: Form 3 of Ihita C and D building as on 31-03-2025 (1) (1).pdf20 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Ihita C and D Building as on March 2025 (1).pdf20 Jun 2025
Disclosure of sold/ booked inventoryFile: Cricular 29 - Ihita (1).pdf20 Jun 2025
Other - TechnicalFile: PERT Ihita (1).pdf20 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Ihita C and D Building for FY 2022-23 (1).pdf20 Jun 2025
Declaration in FORM BFile: Form B.pdf28 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2024.pdf28 Jan 2025
Certificates of CA (Form 3)File: Form 3 Sept 2024.pdf28 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2024.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf28 Jan 2025
CERSAI detailsFile: Declaration CERSAI.pdf28 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf28 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023-24.pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Ihita C and D Building for FY 2022-23.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 For Ihita C and D wing (Revised).pdf21 Jun 2023
Declaration about Commencement CertificateFile: FORMAT D For Ihita.pdf20 Jun 2023
Declaration in FORM BFile: FORM -B Promoter Ihita CD.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 18.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 19.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 20.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 21.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - December 21.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 22.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - June 22.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - September 22.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - December 22.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 23.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March' 2018.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March' 2019.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March' 2020.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March' 2021.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December' 2021.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March' 2022.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June' 2022.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 September 2022.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December' 2022.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March' 2023.pdf20 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20- Ihita CD.pdf20 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21- Ihita CD.pdf20 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22- Ihita CD.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 For Ihita C and D wing.pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-03-2018 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-03-2019 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-03-2020 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-03-2021 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-12-2021 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-03-2022 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 30-06-2022 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 30-09-2022 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-12-2022 organized (4).pdf20 Jun 2023
Certificates of CA (Form 3)File: 31-03-2023 organized (4).pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FY 17-18-1_merged.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FY 18-19-1_merged.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 19-20-1_merged.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 20-21-1_merged.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 21-22-1_merged.pdf20 Jun 2023
Layout approvalFile: d wing sanction plan.pdf31 Jul 2017
Building plan approvalFile: kaswa C wing sanction plan.pdf31 Jul 2017
PAN CardFile: pan card nayana.pdf31 Jul 2017
Copy of the legal title reportFile: title report.pdf31 Jul 2017
Details of encumbrancesFile: scanner_20170731_193410.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: d wing sanction plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: kaswa C wing sanction plan.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER NEW.pdf31 Jul 2017
Declaration in FORM BFile: New Doc 2017-07-31 (1).pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate 1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate 2.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate 3.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate 4.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate 5.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: konda kaswa.pdf31 Jul 2017
Certificates of CA (Form 3)File: New Doc 2017-07-31 (2).pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IHITA C AND D BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavadhan BK13,700+ in Pune

2 kmIHITA C AND D BUILDINGCompleted 9Lapsed / revoked 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Nayana Anand Kaswa

Nayana Anand Kaswa has 1 registration on MahaRERA, including IHITA C AND D BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if IHITA C AND D BUILDING is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IHITA C AND D BUILDING?

The registered promoter entity is Nayana Anand Kaswa, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IHITA C AND D BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IHITA C AND D BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IHITA C AND D BUILDING?

The professionals named in the filing: Architect: Deepak Honkan; Engineer: SK Consultants & Engineers; Chartered Accountant: Gaurav S Rajpal & Co; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IHITA C AND D BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IHITA C AND D BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IHITA C AND D BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.