Registration lapsed No litigation declared Residential / Group Housing project

IDEAL CITY BUILDING NO 2

By R N ENTERPRISES

RG-MH-98784 · RERA P99000005431 · Last updated on MahaRERA portal: 12 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 70 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
32 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

IDEAL CITY BUILDING NO 2 is a Residential / Group Housing project by R N ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000005431 on 11 Aug 2017. Possession was promised by 30 Oct 2024 and is now 24 months past that date. The completion date has moved by 70 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameIDEAL CITY BUILDING NO 2
  • TypeResidential / Group Housing
  • Location
    • PALGHAR
    • Umroli
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000005431
  • ReraGenie IDRG-MH-98784

Builder

  • NameR N ENTERPRISES
  • Entity typePartnership
  • PartnersRADHA NATWARLAL SHARMA, POOJA DEEPAK SHARMA, DEEPAK NATWARLAL SHARMA, PAWAN RAJDEV PANDEY
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

24 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion30 Oct 2024
  • Revised completionRevised to 30 Oct 2024 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 2 TYPE A1 WING ANA50000
BUILDING NO 2 TYPE B WING BNA50000
BUILDING NO 2 TYPE A WING CNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 2 TYPE A1 WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 TYPE B WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 TYPE A WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
IDEAL PROPERTIESVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI2533.24
Proposed, not sanctioned2,533 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO 1, LOTUS APARTMENT, SRI PRASTHA COMPLEX, NALLASOPARA WEST, 401203

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISHANT P PATIL
PartnerRole in project
R N ENTERPRISES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000009555Dec 2018 → Apr 2022

Reason as filed by the promoter1. The competent authority for the project ‘IDEAL CITY BUILDING NO 2’ is TOWN PLANNING DEPARTMENT - PALGHAR & HONOURABLE COLLECTOR - Palghar. 2. Our construction activities were in process accordingly mentioned at the time of RERA registration of the Project. But, due to pandemic situation of COVID-19, we had suffered various issues such as obstacles in construction activities due to locked down, non-availability of labour as majorities of labours migrated to their Hometown. Also, due to disturbance in transportation we had also faced the issues regarding shortage of material etc. 3. We still

EXT99000012690Dec 2018 → Oct 2024

Reason as filed by the promoterExplanatory note regarding the state of development works in the projects and reason for not completing the development works in the projects within the period declared in the declaration submitted in FORM ‘B’ at the time of making application for the registration of ‘IDEAL CITY BUILDING NO 2’ 1. In 2020 due to the Pandemic situation of COVID-19 and locked down imposed by the government we could not proceed with the construction activities. 2. Also, due to the pandemic, there was a shortage of Materials, Labour and transportation service. 3. Due to the issuance of the UNIFIED DEVELOPMENT CONTR

EXT99000002548Dec 2018 → Oct 2020

Reason as filed by the promoterCC revised and we need extension for completion of project

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000302937R N EnterprisesMRS. SHWETA BHUVAL SINGH11/10/2022
CC006000000397066VIVEK Surendranath MishraM/S R.N. Enterprises12/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Aug 2021

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: 6 FORM B.pdf12 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: rn.pdf21 Jan 2025
Building plan approvalFile: Revised A wing Type C.pdf5 Jul 2024
Building plan approvalFile: Revised B wing Type D.pdf5 Jul 2024
Building plan approvalFile: Compressed Revised C wing Type E.pdf5 Jul 2024
Building Plan Approval (IOD)File: Revised A wing Type C.pdf5 Jul 2024
Building Plan Approval (IOD)File: Revised B wing Type D.pdf5 Jul 2024
Building Plan Approval (IOD)File: Compressed Revised C wing Type E.pdf5 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf26 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23.pdf26 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf11 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 (1).pdf11 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOD.pdf11 Oct 2022
Certificates of CA (Form 3)File: FORM 3 (1).pdf11 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf14 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-compressed.pdf14 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf14 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf14 Mar 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_compressed.pdf14 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200228109872_For_Asset_Based_Search_14_01_2022_19_13_37_332-converted14 Mar 2022
Certificates of CA (Form 3)File: FORM 3-compressed.pdf14 Mar 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf3 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC APPLICATION_compressed.pdf2 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of customer inventory as per Rera format.pdf30 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 17-18.pdf22 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf22 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf22 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf22 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 17-18.pdf5 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf5 Nov 2019
Details of encumbrancesFile: Encumbrances.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement cerificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: COST CERTIFICATE.pdf31 Jul 2017
Proforma of Allotment letterFile: DRAFT AGREEMENT FINAL.pdf31 Jul 2017
Layout approvalFile: LAYOUT.pdf30 Jul 2017
Building plan approvalFile: TYPE A.pdf30 Jul 2017
Building plan approvalFile: TYPE A1.pdf30 Jul 2017
Building plan approvalFile: TYPE B.pdf30 Jul 2017
PAN CardFile: r n ent.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFACTE pdf.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf30 Jul 2017
Building Plan Approval (IOD)File: TYPE A.pdf30 Jul 2017
Building Plan Approval (IOD)File: TYPE A1.pdf30 Jul 2017
Building Plan Approval (IOD)File: TYPE B.pdf30 Jul 2017
Declaration in FORM BFile: FORM B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RN ENGINEER CER.pdf30 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 70 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IDEAL CITY BUILDING NO 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALGHAR3,200+ in Palghar

2 kmIDEAL CITY BUILDING NO 2Completed 13Lapsed / revoked 26Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: R N ENTERPRISES

R N ENTERPRISES has 3 registrations on MahaRERA, including IDEAL CITY BUILDING NO 2 and BHARGAV. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that IDEAL CITY BUILDING NO 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if IDEAL CITY BUILDING NO 2 is delayed beyond 30 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IDEAL CITY BUILDING NO 2?

The registered promoter entity is R N ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IDEAL CITY BUILDING NO 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against IDEAL CITY BUILDING NO 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for IDEAL CITY BUILDING NO 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IDEAL CITY BUILDING NO 2?

The professionals named in the filing: Architect: NISHANT P PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IDEAL CITY BUILDING NO 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IDEAL CITY BUILDING NO 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IDEAL CITY BUILDING NO 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.