Red flags

  • Completion date moved by 52 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 52 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 85%
22 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B is a Residential / Group Housing project by SHREE SAI SAMARTH BUILDERS AND DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000009483 on 22 Aug 2017. Possession is promised by 30 Apr 2027. The completion date has moved by 52 months from the original filing. 15 of the 37 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameIDEAL AVENUE BUILDING NO 3 TYPE B1D WING B
  • TypeResidential / Group Housing
  • Location
    • MAIN ROAD
    • UMROLI
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000009483
  • ReraGenie IDRG-MH-52013

Builder

  • NameSHREE SAI SAMARTH BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersRAJENDRA DEV JAGAT BHUSAN TIWARI, UMA DEVI RAJENDRA DEV TIWARI

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed92 files

Current status

41%15 of 37 units booked
82.7%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3 WING BNA55241337

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

BUILDING NO 3 WING B: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,195 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
IDEAL PROPERTIESVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI1195.0
Proposed, not sanctioned948 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchACHOLE ROAD NALA SOPARA EAST
Estimated costRs 2.16 cr
Cost incurredRs 1.79 cr
Work done82.67%
BuildingWingEstimatedIncurred
BUILDING NO 3 WING BNARs 1.92 crRs 1.79 cr
-NARs 24.00 lakh-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH SATGHARE
ArchitectRENDER POINT
EngineerParesh Unnarkar
EngineerMESHRAM & THUKRAL
EngineerCENTRELINE ENGINEERS & CONSULTANTS
Chartered AccountantVIKAS SHUKLA & COMPANY
Chartered AccountantRinky Gupta & Company
Chartered AccountantAJAYSHUKLA & ASSOCIATES
PartnerRole in project
SHREE SAI SAMARTH BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000015103Dec 2022 → Dec 2025

Reason as filed by the promoterAs project is not completed we need extension for completion of our project it will be appreciated if you give us a extension period so i can complete my work and i can give possession before expiry date. The Reason for delay was COVID-19 the workers were not available and few workers were available after covid 19 but the work was very slow, so we need extension certificate to complete our project work

EA19112518367Dec 2022 → Apr 2027

Reason as filed by the promoter1. While registering the project with MahaRERA,we had underestimated the project completion time which proved to be less for such a project. 2. Also due to Covid project got delayed which lead to lack of sales and Financial Difficulties 3. Still the project progress was on track but in between due to some issues with our labour contractor led to few months delay of works. 4. But rest assured,now the works are in full swing & will be completed with in the stipulated time lines of this extended date and OC will be obtained. 5. Also,we are uploading the PERTChart/work completion schedule of the p

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Nov 2023

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 June 2026.pdf30 Jul 2026
Withdrawal Update Form 2File: Form-2 June 2026.pdf30 Jul 2026
Withdrawal Update Form 3File: Form-3 June 2026.pdf30 Jul 2026
Withdrawal Update Form 1File: Form-1 March 2026 (4).pdf12 May 2026
Withdrawal Update Form 2File: Form-2 March 2026 (3).pdf12 May 2026
Withdrawal Update Form 3File: Form 3 March 2026 (1).pdf12 May 2026
Withdrawal Update Form 1File: Form-1 Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 2File: Form-2 Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 3File: Form-3 Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf19 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf24 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf22 Oct 2025
Withdrawal Update Form 1File: form 1.pdf22 Oct 2025
Withdrawal Update Form 1File: form 1.pdf22 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf22 Oct 2025
Withdrawal Update Form 2File: form 2.pdf22 Oct 2025
Withdrawal Update Form 2File: form 2.pdf22 Oct 2025
Withdrawal Update Form 3File: form 320251017_13261584.pdf22 Oct 2025
Withdrawal Update Form 3File: form 3.pdf22 Oct 2025
Withdrawal Update Form 3File: form 3.pdf22 Oct 2025
Form 5 (FY 2024-2025)File: form 5.pdf22 Oct 2025
Form 1File: form1.pdf16 Oct 2025
Form 2File: form2.pdf16 Oct 2025
Form 3File: FORM 3 PDF20241108_15160271.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold and booked20251015_11234058.pdf16 Oct 2025
Form 1File: form 1.pdf16 Oct 2025
Form 2File: form -2.pdf16 Oct 2025
Form 3File: form 320251016_11354381.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold and booked20251015_11234058.pdf16 Oct 2025
Form 1File: form 1.pdf16 Oct 2025
Form 2File: form-2.pdf16 Oct 2025
Form 3File: form 320251016_11405709.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold and booked20251015_11234058.pdf16 Oct 2025
Form 1File: form1.pdf15 Oct 2025
Form 2File: form2.pdf15 Oct 2025
Form 3File: FORM 3 PDF20241108_15092054.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold and booked20251015_11234058.pdf15 Oct 2025
Certificates of CA (Form 3)File: FORM 3 PDF20241108_15092054.pdf8 Nov 2024
Certificates of CA (Form 3)File: FORM 3 PDF20241108_15160271.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf31 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE.pdf31 May 2024
Certificates of CA (Form 3)File: FORM 3 PDF.pdf31 May 2024
Certificates of CA (Form 3)File: FORM 03_compressed.pdf23 Mar 2024
Layout approvalFile: BLUE PRINT.pdf16 Nov 2023
Layout approvalFile: Development Agreement 4th Floor.pdf16 Nov 2023
Copy of Layout Approval (in case of layout)File: BLUE PRINT.pdf16 Nov 2023
Copy of Layout Approval (in case of layout)File: Development Agreement 4th Floor.pdf16 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect CERTIFICATE.pdf16 Nov 2023
Other - LegalFile: Power of Attorney 4th Floor.pdf16 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect CERTIFICATE.pdf4 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER S CERTIFICATE.pdf4 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A Quality Assurance Certificate.pdf4 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5.pdf4 Nov 2023
Declaration about Commencement CertificateFile: Scan20230329202942.pdf29 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_11zon.pdf29 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate (1)_11zon.pdf29 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 201920_11zon.pdf29 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 202021 (1)_11zon.pdf29 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 201920_11zon.pdf29 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 202021_11zon.pdf29 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate_11zon.pdf29 Mar 2023
Disclosure of sold/ booked inventoryFile: Scan20230329204651.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 517-18_11zon.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 518-19_11zon.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 518-19_11zon.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 519-20_11zon.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 520-21_11zon.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 521-22_11zon.pdf29 Mar 2023
Copy of the legal title reportFile: Title report 2.pdf14 Aug 2017
Copy of the legal title reportFile: Title report 3.pdf14 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate.pdf14 Aug 2017
Certificates of CA (Form 3)File: CA certificate.pdf14 Aug 2017

How this compares with Palghar

41%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 52 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UMROLI3,200+ in Palghar

2 kmIDEAL AVENUE BUILDING NOCompleted 13Lapsed / revoked 27Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: SHREE SAI SAMARTH BUILDERS AND DEVELOPERS

SHREE SAI SAMARTH BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B?

The registered promoter entity is SHREE SAI SAMARTH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B?

The professionals named in the filing: Architect: RAJESH SATGHARE; Architect: RENDER POINT; Engineer: Paresh Unnarkar; Engineer: MESHRAM & THUKRAL; Engineer: CENTRELINE ENGINEERS & CONSULTANTS; Chartered Accountant: VIKAS SHUKLA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.