Registration lapsed No litigation declared Residential / Group Housing project

Hubtown Seasons - Ardennes

By Joynest Premises Private Ltd

RG-MH-30615 · RERA P51800032784 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 95%
3 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Hubtown Seasons - Ardennes is a Residential / Group Housing project by Joynest Premises Private Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032784 on 29 Jan 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 56 of the 59 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameHubtown Seasons - Ardennes
  • TypeResidential / Group Housing
  • Location
    • R C Marg
    • Chembur East
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800032784
  • ReraGenie IDRG-MH-30615

Builder

  • NameJoynest Premises Private Ltd
  • Entity typeCompany
  • CINU45202MH2008PTC183715
  • DirectorsKhilen Shah, Jayeshkumar Mukesh Jain

Key dates

4 months past promisethis monthRegisteredJan 2022PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jan 2022
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Current status

95%56 of 59 units booked
70.2%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Seasons A wingNA151459059

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Seasons A wing: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes20%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area915 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jan 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4595.08
Proposed, not sanctioned4,595 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAhura Centre, Mahakali Caves Rd, Andheri East
Estimated costRs 45.17 cr
Cost incurredRs 31.68 cr
Work done70.15%
BuildingWingEstimatedIncurred
Seasons A wingNARs 36.37 crRs 30.13 cr
-NARs 8.80 crRs 1.56 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECT (Mr. Amit Pawar)
ArchitectARCHITECT HAFEEZ CONTRACTOR
ArchitectCitygold Management Services Pvt.Ltd
EngineerRajivan Paramban
Chartered AccountantAnand A Yadav & Associates
Chartered AccountantSanket Shah
Chartered AccountantMaloo Rathod and Companny
Chartered AccountantAmit Sheth
PartnerRole in project
Joynest Premises Private Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form I P51800032784 - SEASONS A WING (Ardennes).pdf30 Apr 2026
Withdrawal Update Form 2File: Form II Engineers Certificate - Seasons A wing - March 26.pdf30 Apr 2026
Withdrawal Update Form 3File: SEASONS A WING- Form III signed.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM_1_P51800032784 - SEASONS A WING (Ardennes).pdf16 Mar 2026
Withdrawal Update Form 2File: FORM_2_P51800032784 - SEASONS A WING (Ardennes).pdf16 Mar 2026
Withdrawal Update Form 3File: FORM III Hubtown Seasons-A 020326 sign (3).pdf16 Mar 2026
Withdrawal Update Form 1File: P51800032784 - SEASONS A WING (Ardennes).pdf25 Nov 2025
Withdrawal Update Form 2File: ENGINEERIN CERTIFICATE JOYNEST - A wing.pdf25 Nov 2025
Withdrawal Update Form 3File: Form-3 Seasons - Ardennes 241125.pdf25 Nov 2025
Form 5 (FY 2024-2025)File: A.pdf1 Oct 2025
Form 1File: Arch Certificate_Seasons A Wing_June 25.pdf16 Aug 2025
Form 2File: Engg Certificate_Seasons A Wing_June 25.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory_ A wing _June 25.pdf16 Aug 2025
Form 3File: CA Form III_A Wing_June 25.pdf16 Aug 2025
Form 1File: P51800032784 - SEASONS A WING (Ardennes).pdf10 Jul 2025
Form 2File: Engineers Certificate Seasons A wing_Mar 25 (1).pdf10 Jul 2025
Form 3File: HUBTOWN SEASONS ARDENNES.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousre of booked inventory_Mar 25.pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HUBTOWN SEASONS - ECUADOR CLOUD (1).pdf20 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate A wing Seasons.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING (Ardennes) (1).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate A wing - Dec 24.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING A.pdf29 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Season B wing full CC upto top of 14th floor.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING (Ardennes).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE A WING.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate_A Wing_Sept 24.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE A WING.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate_A Wing_Sept 24.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing September 2024.pdf8 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - A wing March 2024.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING (Ardennes).pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - Seasons Wing - A ( 2nd To 13th floor).pdf22 Jul 2024
Building plan approvalFile: Sale Wing ABC IOD-28042023.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Sale Wing ABC IOD-28042023.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERIN CERTIFICATE JOYNEST - A wing.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Certificate_Seasons A wing_Mar 24.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing March 2024.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING.pdf30 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: B wing FurtherCC-signed.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGEENIRING CERTIFICATE- A wing - Sep 23.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE -SEASONS - A WING - DEC 23.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing December 2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING (2).pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - A wing March 2023.pdf27 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing June 2023.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing September 2023.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering certificate Seasons A wing March 23.pdf10 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate - Seasons A wing - June 23.pdf10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_QA Certificate_Seasons A Wing_Mar 22.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING.pdf17 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING A.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE A WING - SEASONS SEP 22.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginners certificate Seasons A wing Dec 22.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing December 2022.pdf21 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 2366641-FurtherCC-signed (1).pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - SEASONS A WING.pdf11 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 2366641-FurtherCC-signed.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Seasons A wing.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - A wing March 2022.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 -Seasons Wing A - 2nd to 13th floor.pdf30 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing September 2022.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate - A wing - June 22.pdf26 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing June 2022.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51800032784 - Seasons Wing-A.pdf8 Nov 2022
Copy of the legal title reportFile: Legal Title Report 21102021 in Form A.pdf23 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - A wing March 2022_compressed.pdf30 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Seasons A Resi_Arch Cert_Mar 22_0001.pdf25 Apr 2022
Layout approvalFile: Layout - wing 'A' in Blue-min.pdf19 Jan 2022
Building plan approvalFile: iod hubtown.pdf19 Jan 2022
Layout approvalFile: page 2.pdf19 Jan 2022
Layout approvalFile: page 3.pdf19 Jan 2022
Layout approvalFile: page 4.pdf19 Jan 2022
Layout approvalFile: page 5.pdf19 Jan 2022
Layout approvalFile: page 6 new-min.pdf19 Jan 2022
Layout approvalFile: page 7 new-min.pdf19 Jan 2022
Layout approvalFile: page 8 new.pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout - wing 'A' in Blue-min.pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: page 2.pdf19 Jan 2022

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Seasons - Ardennes on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur East6,700+ in Mumbai Suburban

Builder: Joynest Premises Private Ltd

Joynest Premises Private Ltd has 1 registration on MahaRERA, including Hubtown Seasons - Ardennes. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Hubtown Seasons - Ardennes shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Hubtown Seasons - Ardennes is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Seasons - Ardennes?

The registered promoter entity is Joynest Premises Private Ltd, a company as per the filing. Its CIN U45202MH2008PTC183715 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Seasons - Ardennes?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hubtown Seasons - Ardennes?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Seasons - Ardennes?

The professionals named in the filing: Architect: AAKAR ARCHITECT (Mr. Amit Pawar); Architect: ARCHITECT HAFEEZ CONTRACTOR; Architect: Citygold Management Services Pvt.Ltd; Engineer: Rajivan Paramban; Chartered Accountant: Anand A Yadav & Associates; Chartered Accountant: Sanket Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Seasons - Ardennes?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Seasons - Ardennes. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Seasons - Ardennes to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.