ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Horizon Pearl II

Registered No litigation declared Residential / Group Housing project

Horizon Pearl II

By KM Developers

RG-MH-31447 · RERA P51700079782 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 36.00 crore secured on the land, in favour of DCB Bank

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 70%
118 of 151Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Horizon Pearl II is a Residential / Group Housing project by KM Developers in Thane, Maharashtra, registered with MahaRERA as P51700079782 on 26 Mar 2025. Possession is promised by 31 Dec 2028. 33 of the 151 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameHorizon Pearl II
  • TypeResidential / Group Housing
  • Location
    • Owale
    • Thane
    • Thane (M Corp.)
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079782
  • ReraGenie IDRG-MH-31447

Builder

  • NameKM Developers
  • Entity typePartnership
  • Other registrations3 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

22%33 of 151 units booked
15.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Horizon Pearl II - Wing ANA51606
Horizon Pearl II - Wing BNA29251450145

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.

Horizon Pearl II - Wing A5%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Horizon Pearl II - Wing B32%
ActivityProgress
Excavation70%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor67%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1054

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,054
Closed/Covered1,054
BuildingClosed/CoveredTotal
Horizon Pearl II - Wing A527527
Horizon Pearl II - Wing B527527

Land and ownership77

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,998 sq m
Land owned byThe promoter, with other names on the file
Named landowners77
Encumbrance on the landDeclared present
Charge in favour ofDCB Bank
Secured amountRs 36.00 crore
CERSAI search filedYes
Declared on27 Dec 2025
LandownerVillageDistrict
Anjana AKA Anjali Janardan MukadumThane (M Corp.)Thane
ABHAY JANARDAN MUKADUMThane (M Corp.)Thane
Madhuri Kailas Patil AKA MadhuriJanardan PatilThane (M Corp.)Thane
Rupali Rajendra Patil AKA Rupali Janardan PatilThane (M Corp.)Thane
Chandrakant Bhaskar MukadumThane (M Corp.)Thane
Laxmi Chandrakant MukadumThane (M Corp.)Thane
Sushant Chandrakant MukadumThane (M Corp.)Thane
Swati Rajesh Patil AKA Swati Chandrakant MukadumThane (M Corp.)Thane
Shwetambara Prafulla VaityThane (M Corp.)Thane
Dnyaneshwar Bhaskar MukadumThane (M Corp.)Thane
Asha Dnyaneshwar MukadumThane (M Corp.)Thane
Manish Dnyaneshwar MukadumThane (M Corp.)Thane
Vrushali Rupesh BhoirThane (M Corp.)Thane
Hirabai Vasudev MhatreThane (M Corp.)Thane
Vinod Vasudev MhatreThane (M Corp.)Thane
Mininath Vasudev MhatreThane (M Corp.)Thane
Anjali Chandrakant Bhoir AKA Anjali Vasudev MhatreThane (M Corp.)Thane
Rekha Suresh Bhoir AKA Rekha Bhaskar MukadumThane (M Corp.)Thane
Vikas Suresh BhoirThane (M Corp.)Thane
Mayur Suresh BhoirThane (M Corp.)Thane
Sheetal Sameer Vaity AKA Sheetal Suresh BhoirThane (M Corp.)Thane
Vasanti Bhaskar MukadumThane (M Corp.)Thane
Ashwin Bhaskar MukadumThane (M Corp.)Thane
Sharmila Vinod Vaity AKA Sharmila Vasudev MhatreThane (M Corp.)Thane
Jayvant Nathu MukadamThane (M Corp.)Thane
Ganesh Nathu MukadumThane (M Corp.)Thane
Rajesh Nathu MukadumThane (M Corp.)Thane
Jankubai Vinayak MhatreThane (M Corp.)Thane
NARENDRA VINAYAK MHATREThane (M Corp.)Thane
JITENDRA VINAYAK MHATREThane (M Corp.)Thane
DRAVESH GANESH MUKADUMThane (M Corp.)Thane
AJINKYA GANESH MUKADUMThane (M Corp.)Thane
KAILAS HARISHCHANDRA PATILThane (M Corp.)Thane
JAYESH HARISHCHANDRA PATILThane (M Corp.)Thane
RUPALI KISHOR BHOIR AKA Rupali Harishchandra PatilThane (M Corp.)Thane
Lalita Sachin Patil AKA Lalita Harishchandra PatilThane (M Corp.)Thane
PADMAKAR TUKARAM MUKADUMThane (M Corp.)Thane
SACHIN PADMAKAR MUKADUMThane (M Corp.)Thane
BHAVESH PADMAKAR MUKADUMThane (M Corp.)Thane
DINANATH TUKARAM MUKADUMThane (M Corp.)Thane
MOHINI DINANNATH MUKADUMThane (M Corp.)Thane
Disha Dinananth MukadumThane (M Corp.)Thane
Aakansha Dinanath MukadumThane (M Corp.)Thane
Deep Dinanath Mukadum AKA Dinanath Tukaram MukadumThane (M Corp.)Thane
Ramesh Tukaram MukadumThane (M Corp.)Thane
Reena Ramesh MukadumThane (M Corp.)Thane
Harshita Ramesh MukadumThane (M Corp.)Thane
Vedant Ramesh Mukadum AKA Ramesh Tukaram MukadumThane (M Corp.)Thane
Arvind Tukaram MukadumThane (M Corp.)Thane
Usha Arvind MukadumThane (M Corp.)Thane
Chandan Arvind MukadumThane (M Corp.)Thane
Riyansh Arvind MukadumThane (M Corp.)Thane
SURYAKANT NATHU MUKADUMThane (M Corp.)Thane
MANORAM SURYAKANT MUKADUMThane (M Corp.)Thane
SUNIL SURYAKANT MUKADUMThane (M Corp.)Thane
POOJA SUNIL MUKADUMThane (M Corp.)Thane
Hemangi Sandeep Mhatre AKA HemangiSuryakantMukadumThane (M Corp.)Thane
Parvatibai Tukaram MukadumThane (M Corp.)Thane
Chandrashekhar Anant MhatreThane (M Corp.)Thane
Shashikant Anant MhatreThane (M Corp.)Thane
Prabhavati Tukaram MukadumThane (M Corp.)Thane
Pushpa Tukaram MukadumThane (M Corp.)Thane
Savitri Tukaram MukadumThane (M Corp.)Thane
Laxmi Tukaram MukadumThane (M Corp.)Thane
VIKRANT GANESH MUKADUMThane (M Corp.)Thane
PRAMILA RAJESH MUKADUMThane (M Corp.)Thane
BHAVIKA RAJESH MUKADUMThane (M Corp.)Thane
Sujal Rajesh Mukadum AKA Rajesh Nathu MukadumThane (M Corp.)Thane
LATA HARISHCHANDRA PATILThane (M Corp.)Thane
VAISHALI VINAYAK MHATREThane (M Corp.)Thane
KAMINI JAYWANT MUKADUMThane (M Corp.)Thane
SANKET JAYWANT MUKADUMThane (M Corp.)Thane
DIVYA SANKET MUKADUMAKA DIVYA CHANDRASHEKHAR PATILThane (M Corp.)Thane
AKSHAY JAYWANT MUKADUMThane (M Corp.)Thane
Swapnali Khushal Bhoir AKA SwapnaliJaywant MukadumThane (M Corp.)Thane
TARAMATI GANESH MUKADUMThane (M Corp.)Thane
Katnibai AKA Krushnabai Bhaskar MukadumThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI15443.14
Proposed, not sanctioned9,983 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch3&4 -A/6,RITA BLDG,GROUND FLOOR, SAI BABA VIHAR COMPLEX, VILLAGE KAVESAR, ADJACENT TO MUCHHALA POLYTECHNIC, GHODBUNDER ROAD, THANE - 400601
Estimated costRs 47.97 cr
Cost incurredRs 7.20 cr
Work done15.0%
BuildingWingEstimatedIncurred
Horizon Pearl II - Wing ANARs 21.80 crRs 3.60 cr
Horizon Pearl II - Wing BNARs 21.80 crRs 3.60 cr
-NARs 4.36 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRight Space Consultanats
EngineerAssociated Structural Engineers LLP
Chartered AccountantHariya & Ganatra
PartnerRole in project
KM Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 FY 25-26 .pdf21 May 2026
Withdrawal Update Form 2File: Form 2 FY 25-26.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 FY 25-26 _11zon.pdf21 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf21 May 2026
Form 2A (FY 2024-2025)File: Form-2A-Engineer_s_Certificate_For_Quality_Assurance_-_31-03-2025_Horizon_Pearl-II.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1-System_generated__Pearl_II_Q3.pdf12 Feb 2026
Withdrawal Update Form 2File: Form-2-System_generated__Pearl_II_Q3.pdf12 Feb 2026
Withdrawal Update Form 3File: Form-3-System_generated__Pearl_II_Q3_compressed.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Horizon Pearl II KM Developers FY 2024 25.pdf13 Jan 2026
Withdrawal Update Form 1File: FORM-1-Q2-PEARL-II-30-09-2025.pdf13 Nov 2025
Withdrawal Update Form 2File: FORM-2-Q2-PEARL-II-30-09-2025.pdf13 Nov 2025
Withdrawal Update Form 3File: FORM-3-Q2-PEARL-II-30-09-2025_compressed.pdf13 Nov 2025
Withdrawal Update Form 1File: FORM-1-PEARL-II-30-06-2025.pdf9 Sep 2025
Withdrawal Update Form 2File: FORM-2-PEARL-II-30-06-2025 (1).pdf9 Sep 2025
Withdrawal Update Form 3File: FORM-3-PEARL-II-30-06-2025.pdf9 Sep 2025
Withdrawal Update Form 1File: FORM-1-PEARL-II-30-06-2025.pdf26 Aug 2025
Withdrawal Update Form 2File: FORM-2-PEARL-II-30-06-2025 (1).pdf26 Aug 2025
Withdrawal Update Form 3File: FORM-3-PEARL-II-30-06-2025.pdf26 Aug 2025
Other - FinanceFile: POA 4.pdf16 Mar 2025
Other - FinanceFile: POA 3.pdf16 Mar 2025
Other - FinanceFile: POA 2.pdf16 Mar 2025
Other - FinanceFile: POA Merged_11zon.pdf16 Mar 2025
Other - TechnicalFile: FORM_B_COMPANY_KM_DEVELOPERS-min.pdf28 Feb 2025
Other - FinanceFile: Declaration regarding not selling units Revised as on 25-03-2025.pdf20 Feb 2025
CERSAI detailsFile: Debtor Based Report.pdf29 Jan 2025
CERSAI detailsFile: Asset Based Report.pdf29 Jan 2025
CERSAI detailsFile: Debtor Based Declaration.pdf29 Jan 2025
Layout approvalFile: Layout_1- 2.pdf28 Jan 2025
Layout approvalFile: Layout_3-4-7.pdf28 Jan 2025
Layout approvalFile: Layout_5-6.pdf28 Jan 2025
Building plan approvalFile: Layout_1- 2.pdf28 Jan 2025
Building plan approvalFile: Layout_3-4-7.pdf28 Jan 2025
Building plan approvalFile: Layout_5-6.pdf28 Jan 2025
Building plan approvalFile: CC_compressed.pdf28 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout_1- 2.pdf28 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout_3-4-7.pdf28 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout_5-6.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised_Form 3_05 Mar 25.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout_1- 2.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout_3-4-7.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout_5-6.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: CC_compressed.pdf28 Jan 2025
Proforma of Allotment letterFile: Proforma_Allotment_Letter.pdf27 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf27 Jan 2025
Other - TechnicalFile: K M Developer II Rera Mail (1).pdf27 Jan 2025
Other - TechnicalFile: One Plot One Registration.pdf27 Jan 2025
Proforma of Agreement for saleFile: AFS_28022025.pdf27 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: revised_disclosure_for_secured_-_unsecured_finance_availed_for_the_project.pdf27 Jan 2025
Copy of the legal title reportFile: Revised_Legal_Title_Report_-_12-02-2025.pdf20 Jan 2025
Details of encumbrances concerned to FinanceFile: Financial and Legal encumbrance position.pdf20 Jan 2025
Declaration in FORM BFile: Form B 500 rs.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf20 Jan 2025
CERSAI detailsFile: Asset Based Report.pdf20 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: On Promoter Letterhead_Declaration about seperate bank account for real estate projects.pd20 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to allotment letter.pdf20 Jan 2025
Details of encumbrances concerned to LegalFile: Financial and Legal encumbrance position.pdf20 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to agreement for sale.pdf20 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Kshitij Shinde_Disclosure of interest in other real estate organizations.pdf20 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Mohan Shinde_Disclosure of interest in other real estate organization.pdf20 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: On Bank Letterhead_Format A.pdf20 Jan 2025
PAN CardFile: Pan-K M Developers.pdf18 Jan 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Horizon Plams IVThane2OngoingDec 2027Dec 2027
HORIZON PEARLThane1OngoingApr 2027Apr 2027

How this compares with Thane

22%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Horizon Pearl II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmHorizon Pearl IICompleted 73Lapsed / revoked 25Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: KM Developers

KM DEVELOPERS has 4 registrations on MahaRERA, including HORIZON PALMS - III and HORIZON PEARL. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Horizon Pearl II is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Horizon Pearl II?

The registered promoter entity is KM Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Horizon Pearl II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Horizon Pearl II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Horizon Pearl II?

The professionals named in the filing: Architect: Right Space Consultanats; Engineer: Associated Structural Engineers LLP; Chartered Accountant: Hariya & Ganatra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon Pearl II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon Pearl II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon Pearl II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.