Home / Browse projects / Mumbai Suburban, Maharashtra / Horizon Giridarshan

Completed No litigation declared Residential / Group Housing project

Horizon Giridarshan

By HORIZON PROMOTERS INDIA LTD

RG-MH-41882 · RERA P51800049813 · Last updated on MahaRERA portal: 28 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

Horizon Giridarshan is a Residential / Group Housing project by HORIZON PROMOTERS INDIA LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049813 on 24 Feb 2023. The registration is recorded completed; possession was promised by 7 Jun 2025.

At a glance

Project

  • NameHorizon Giridarshan
  • TypeResidential / Group Housing
  • Location
    • R H B Road
    • Mulund West
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049813
  • ReraGenie IDRG-MH-41882

Builder

  • NameHORIZON PROMOTERS INDIA LTD
  • Entity typeCompany
  • CINU45200MH1987PLC244801
  • GSTIN27AAACH5024N1ZI
  • DirectorsJAY DINESH BHEDA, DINESH SHAMJI BHEDA
  • Other registrations5 more →
  • Completed3 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredFeb 2023PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2023
  • Promised completion7 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Horizon GiridarshanNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Horizon Giridarshan: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 28 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Pit Puzzle parking systemYes100%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered33
Open Space2

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area786 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
HORIZON PROMOTERS INDIA LIMITEDMulundMumbai Suburban
Mangal Prabhat Cooperative Housing Society LtdMulundMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2355.4
Proposed, not sanctioned806 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSharda Pristine, Dr Ambedkar Road, Mulund West, Mumbai 400080

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNiroop Kumar Reddy
EngineerSystem Structural Consultants Pvt Ltd
Chartered AccountantBid & Associates
PartnerRole in project
HORIZON PROMOTERS INDIA LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Oct 2024

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Horizon Giridarshan.pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7 Engineer Certificate - Horizon GIRIDARSHAN- DEC 24_R1.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Horizon Form 3 Horizon Giridarshan.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Horizon Giridarshan_FY23-24.pdf23 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: ANNEXURE E - Form 4-SIGNED.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Horizon GiriDarshan.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30 Jun.pdf8 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6 Engineer Certificate - Horizon GIRIDARSHAN Jun 24.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Horizon Giridarshan - Signed.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31032024.pdf20 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC 05122023.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate December 23.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate - Horizon GIRIDARSHAN- Oct 23.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer Certificate Horizon GIRIDARSHAN DEC 23.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Horizon Giridarshan_31122023.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Horizon Giridarshan_FY22-23-signed.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2023.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate scan_compressed.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2023.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate - Horizon GIRIDARSHAN- MAR 23.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate - Horizon GIRIDARSHAN- JUNE 2023.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 (4).pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA (1)_compressed.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Engineer Certificate - Horizon GIRIDARSHAN- MAR 23.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2023.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of separate Bank account16022023.pdf16 Feb 2023
Layout approvalFile: Layout Plan.pdf4 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf4 Feb 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf24 Jan 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf24 Jan 2023
CERSAI detailsFile: Declaration of CERSAI.pdf24 Jan 2023
Proforma of Agreement for saleFile: Agreement for Sale - Draft.pdf21 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report - Agreement for Sale.pdf21 Jan 2023
Copy of the legal title reportFile: Title Certificate Mangal Prabhat CHSL Revised.pdf20 Jan 2023
Declaration in FORM BFile: Declaration.pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Regn Certificate - Mangal Prabhat CHSL.pdf20 Jan 2023
Proforma of Allotment letterFile: Allotment Letter - Draft.pdf18 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation report - Allotment Letter.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: Details of Encumbrances.pdf6 Jan 2023
Details of encumbrances concerned to LegalFile: Details of Encumbrances.pdf6 Jan 2023
Declaration about Commencement CertificateFile: Form D - Declaration about Commencement Certificate.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organization.pdf5 Jan 2023
Building plan approvalFile: IOD Plan.pdf3 Jan 2023
PAN CardFile: HPIL Pan Card.pdf3 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Plan.pdf3 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Jan 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HORIZON SHLOKAP51800029955MULUND WEST, Mumbai Suburban-Jul 2021CompletedMay 2023Late, Feb 2024
HORIZON SAMYAKP51800005791MULUND WEST, Mumbai Suburban-Aug 2017CompletedMar 2019Late, Jul 2023
HORIZON SPANDANR.H.B.ROAD MULUND WEST MUMBAI 40008028-CompletedDec 2017Apr 2017
HORIZON PEARLPLOT NO 18B OFF G.G.ROAD MULUND WEST MUMBAI 40008019-CompletedMar 2015Late, Sep 2015
HORIZON FLORAKASTURBA ROAD MULUND WEST MUMBAI 40008035-CompletedOct 2014Aug 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Horizon Giridarshan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmHorizon GiridarshanCompleted 118Lapsed / revoked 98Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 365 registered projects within 2 km.

Builder: HORIZON PROMOTERS INDIA LTD

HORIZON PROMOTERS INDIA LTD has 6 registrations on MahaRERA, including HORIZON SAMYAK and HORIZON SHLOKA. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Horizon Giridarshan is delayed beyond 7 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Horizon Giridarshan?

The registered promoter entity is HORIZON PROMOTERS INDIA LTD, a company as per the filing. Its CIN U45200MH1987PLC244801 and GSTIN 27AAACH5024N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Horizon Giridarshan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Horizon Giridarshan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Horizon Giridarshan?

The professionals named in the filing: Architect: Niroop Kumar Reddy; Engineer: System Structural Consultants Pvt Ltd; Chartered Accountant: Bid & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon Giridarshan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon Giridarshan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon Giridarshan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.