Home / Browse projects / Pune, Maharashtra / HILL CREST PHASE II

Completed No litigation declared Others project

HILL CREST PHASE II

By ROYAL DEVELOPERS

RG-MH-16695 · RERA P52100026859 · Last updated on MahaRERA portal: 31 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

HILL CREST PHASE II is a Others project by ROYAL DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100026859 on 31 Oct 2020. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameHILL CREST PHASE II
  • TypeOthers
  • Location
    • RAVET
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100026859
  • ReraGenie IDRG-MH-16695

Builder

  • NameROYAL DEVELOPERS
  • Entity typePartnership
  • PartnersSAJID GULABHUSHAN BAGWAN, TUKARAM CHANDAR TUPE, GANESH BABANRAO PINJAN, HIMATLAL RATANSHI POKAR, ASHOK RATANSHI POKAR, RAHUL SATYANARAYAN OZA, DEVCHAND DHANJI CHAUDHARI, KIRTIKUMAR DEVCHAND CHAUDHARI, PRAVIN JAYANTIBHAI POKAR, BHIMRAO RAMCHANDRA KALE, HARESH DEVCHAND CHAUDHARI
  • Other registrations16 more →
  • Completed5 of 17
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2020PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Oct 2020
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HILL CREST PHASE IINA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

HILL CREST PHASE II: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,210 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ADITYA ENTERPRISESPune (M Corp.)Pune

Approvals and building plan

Permissible FSI7028.78
Proposed, not sanctioned2,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI, PUNE, 411017

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCON ASSOCIATES
EngineerJAYESH DEODHAR
Chartered AccountantCA PANKAJ PATNI
PartnerRole in project
ROYAL DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jul 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Final.pdf31 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Final.pdf31 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Final.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 final.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final-1-8_compressed.pdf12 Aug 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation REGISTRATION CERTIFICATE_0001.pdf12 Aug 2024
Architect’s Certificate on Completion of Project (Form 4)File: Final Form 4.pdf24 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Royal developers completion CC-1.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf6 May 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q4 23-24).pdf6 May 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICARE JUNE 2023.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept form 1.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 final.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 final.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: JUNE 23 DISCLOSURE.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: SEPT 2023 DISCLOSURE.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: FINAL MARCH 23 DISCLOSURE.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_compressed.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: DEC 2022 DISCLOSURE.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1 dec 2022.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march Final form 1.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dece 22 Final Form 2.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: mar 23 Final Form 2.pdf27 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Final Form 2A.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech certificate march 2023.pdf12 Oct 2023
Layout approvalFile: LAYOUT.pdf31 Dec 2022
Building plan approvalFile: HPSC0338.pdf31 Dec 2022
Building plan approvalFile: HPSC0339.pdf31 Dec 2022
Building plan approvalFile: HPSC0340.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf31 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0338.pdf31 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0339.pdf31 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0340.pdf31 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: S041000071_2212271459000.pdf31 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Feb 2022
Layout approvalFile: layout.pdf10 Jan 2022
Building plan approvalFile: default 0021-min.pdf10 Jan 2022
Building plan approvalFile: default 0022-min.pdf10 Jan 2022
Building plan approvalFile: default 0023-min.pdf10 Jan 2022
Copy of Layout Approval (in case of layout)File: layout.pdf10 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: default 0021-min.pdf10 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: default 0022-min.pdf10 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: default 0023-min.pdf10 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A.pdf27 Dec 2021
Disclosure of sold/ booked inventoryFile: sold circular.pdf27 Dec 2021
CERSAI detailsFile: CERSAI.pdf27 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf27 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_organized.pdf22 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A.pdf22 Dec 2021
Declaration about Commencement CertificateFile: CIRCULAR 32.pdf20 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Final.pdf12 Oct 2020
Layout approvalFile: Layout Approval 1_compressed.pdf3 Oct 2020
Building plan approvalFile: Building Plan Approval.pdf3 Oct 2020
PAN CardFile: Firm PAN.pdf3 Oct 2020
Copy of the legal title reportFile: Search Title-1-7.pdf3 Oct 2020
Copy of the legal title reportFile: Search Title-8-14.pdf3 Oct 2020
Details of encumbrancesFile: Encumbrance.pdf3 Oct 2020
Copy of Layout Approval (in case of layout)File: Layout Approval 1_compressed.pdf3 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf3 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Oct 2020
Declaration in FORM BFile: FORM B Promoter.pdf3 Oct 2020
Proforma of Allotment letterFile: Allotment letter.pdf3 Oct 2020
Proforma of Allotment letterFile: Agreement To Sale.pdf3 Oct 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HILL CREST PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

Builder: ROYAL DEVELOPERS

ROYAL DEVELOPERS has 17 registrations on MahaRERA, including UTSAV RESIDENCY and Gurukripa Appartment. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if HILL CREST PHASE II is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HILL CREST PHASE II?

The registered promoter entity is ROYAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HILL CREST PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HILL CREST PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HILL CREST PHASE II?

The professionals named in the filing: Architect: ARCON ASSOCIATES; Engineer: JAYESH DEODHAR; Chartered Accountant: CA PANKAJ PATNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HILL CREST PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HILL CREST PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HILL CREST PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.