Home / Browse projects / Palghar, Maharashtra / HIGHSTREET VASAI
HIGHSTREET VASAI
By GANADHAR INFRA DEVELOPERS PVT. LTD
RG-MH-28582 · RERA P99000026489 · Last updated on MahaRERA portal: 12 Sep 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIGHSTREET VASAI is a Commercial project by GANADHAR INFRA DEVELOPERS PVT. LTD in Palghar, Maharashtra, registered with MahaRERA as P99000026489 on 26 Sep 2020. Possession was promised by 29 Jun 2024 and is now 28 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameHIGHSTREET VASAI
- TypeCommercial
- Location
- RAILWAY STATION VASAI ROAD EAST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000026489
- ReraGenie IDRG-MH-28582
Builder
- NameGANADHAR INFRA DEVELOPERS PVT. LTD
- Entity typeCompany
- DirectorsRUSHALI CHANDAN SHAH, TINA PRASANNA KOTHARI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Sep 2020
- Promised completion29 Jun 2024
- Revised completionRevised to 29 Jun 2024 (originally 30 Jun 2023)
- Buildings2 building records
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HIGHSTREET VASAI PHASE 1 | NA | 6 | 0 | 0 | 0 | 0 |
| HIGHSTREET VASAI PHASE 2 | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.
HIGHSTREET VASAI PHASE 170%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
HIGHSTREET VASAI PHASE 270%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 12 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 45% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 15% |
| Water conservation /Rain water harvesting | Yes | 45% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 15% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| HIGHSTREET VASAI PHASE 1 | 27 | 27 |
| HIGHSTREET VASAI PHASE 2 | 27 | 27 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AN ARCHMENT |
| Engineer | AISHWARYA KODAM |
| Chartered Accountant | BHAHUBALI SHAH AND COMPANY |
| Partner | Role in project |
|---|---|
| GANADHAR INFRA DEVELOPERS PVT. LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSir, We, Gangadhar Infra Developers Pvt. Ltd are promoters of the project ‘Highstreet Vasai’ registered vide MahaRERA registration number ‘P99000026489’. The project initially was planned to be completed by 30/06/2023. But due to certain site conditions and covid 19, there was a huge shortage in labor and material provisions. Although we have tried to complete the project within the provided time, we need extension of one year to complete the project with required quality and amenities and receive occupancy certificate. We hereby request you to please grant us one year extension for MahaRERA.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Sep 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Sep 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate Highstreet Vasai.pdf | 12 Sep 2023 |
| Declaration in FORM BFile: Affidavit- RCS_11zon.pdf | 12 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration Legal (2).pdf | 11 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration Finance (2).pdf | 11 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration Legal (2).pdf | 11 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration Finance (2).pdf | 11 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 final new.pdf | 11 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 final new.pdf | 11 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 new latest_11zon.pdf | 11 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MARCH 2021 (1).pdf | 11 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MARCH 2022 (1).pdf | 11 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MARCH 2023 (1).pdf | 11 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Flat (2).pdf | 11 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation ATS (1).pdf | 11 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT (1).pdf | 1 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032023.pdf | 1 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2223.pdf | 1 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold booked inventory.pdf | 1 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032023_compressed.pdf | 1 Jul 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf | 1 Jul 2023 |
| OtherFile: Rera CA Certificate - MARCH 2022.pdf | 6 Jun 2022 |
| OtherFile: RERA - Architect Certificate - MARCH 2022.pdf | 6 Jun 2022 |
| OtherFile: RERA - Engineer Certificate MARCH 2022.pdf | 6 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory RERA Update 16-08-2021.pdf | 27 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: C A Certificate Form-5 Auditor for RERA update 31-03-2021.pdf | 27 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf | 16 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 16 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Charatered Account Certificate CA Nogja.pdf | 16 Aug 2021 |
| OtherFile: RLDA - Ganadhar Agreement Pages-1.pdf | 16 Aug 2021 |
| Declaration in FORM BFile: Form B - RERA Notary.pdf | 18 Sep 2020 |
| Details of encumbrancesFile: Encumbrances Certificate.pdf | 16 Sep 2020 |
| Layout approvalFile: Ground floor plan.pdf | 12 Sep 2020 |
| Building plan approvalFile: Section and elevation.pdf | 12 Sep 2020 |
| Building plan approvalFile: 2nd basement plna.pdf | 12 Sep 2020 |
| Building plan approvalFile: Ground floor plan.pdf | 12 Sep 2020 |
| Building plan approvalFile: 1st floor plan.pdf | 12 Sep 2020 |
| Building plan approvalFile: 2nd floor plan.pdf | 12 Sep 2020 |
| Building plan approvalFile: 3rd floor plan.pdf | 12 Sep 2020 |
| Building plan approvalFile: 5th floor and Terrace plan.pdf | 12 Sep 2020 |
| PAN CardFile: 3 pan card.pdf | 12 Sep 2020 |
| Copy of the legal title reportFile: LAND HANDOVER.pdf | 12 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: Ground floor plan.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Section and elevation.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd basement plna.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Ground floor plan.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 1st floor plan.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd floor plan.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 3rd floor plan.pdf | 12 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 5th floor and Terrace plan.pdf | 12 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: plan sanction letter.pdf | 12 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 12 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate RERA Vasai.pdf | 12 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chetan Nogaji CA Certificate.pdf | 12 Sep 2020 |
| Proforma of Allotment letterFile: Agreement_to_Lease__Blank_final sent by CNS.pdf | 12 Sep 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HIGHSTREET VASAI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAILWAY STATION VASAI ROAD EAST3,200+ in Palghar
Filed coordinates, straight-line distance. 120 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: GANADHAR INFRA DEVELOPERS PVT. LTD
GANADHAR INFRA DEVELOPERS PVT. LTD has 1 registration on MahaRERA, including HIGHSTREET VASAI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that HIGHSTREET VASAI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HIGHSTREET VASAI is delayed beyond 29 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIGHSTREET VASAI?
The registered promoter entity is GANADHAR INFRA DEVELOPERS PVT. LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIGHSTREET VASAI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HIGHSTREET VASAI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIGHSTREET VASAI?
The professionals named in the filing: Architect: AN ARCHMENT; Engineer: AISHWARYA KODAM; Chartered Accountant: BHAHUBALI SHAH AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIGHSTREET VASAI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback