HIGHNESS HOMES
RG-MH-78074 · RERA P99000049190 · Last updated on MahaRERA portal: 21 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIGHNESS HOMES is a Residential / Group Housing project by OM JAI KAVISH REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000049190 on 3 Feb 2023. Possession is promised by 31 Dec 2028. 43 of the 70 units on this registration are recorded sold or booked, and 68 of 121 construction stages are filed complete.
At a glance
Project
- NameHIGHNESS HOMES
- TypeResidential / Group Housing
- Location
- TEMBHODE-SHIRGAON ROAD
- DHANSAR
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000049190
- ReraGenie IDRG-MH-78074
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings11 building records
- Documents filed62 files
Current status
Figures as on 21 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO-2, ROW HOUSE 1 T0 4 | NA | 1 | 1 | 4 | 0 | 4 |
| BUILDING NO -3,ROW HOUSE 5 TO 8 | NA | 1 | 1 | 4 | 0 | 4 |
| BUILDING NO-4,ROW HOUSE 9 TO 15 | NA | 1 | 1 | 7 | 0 | 7 |
| BUILDING NO-5,ROW HOUSE 16 TO 19 | NA | 1 | 1 | 4 | 0 | 4 |
| BUILDING NO-6,ROW HOUSE 20 TO 23 | NA | 1 | 1 | 4 | 0 | 4 |
| BUILDING NO-7,ROW HOUSE 24 TO 29 | NA | 1 | 1 | 6 | 0 | 6 |
| BUILDING NO -8,ROW HOUSE 30 TO 34 | NA | 1 | 1 | 5 | 0 | 5 |
| BUILDING NO-9,ROW HOUSE 35 TO 38 | NA | 1 | 1 | 4 | 0 | 4 |
| BUILDING NO-10,ROW HOUSE 39 TO 42 | NA | 1 | 1 | 4 | 0 | 4 |
| BUILDING NO-11,ROW HOUSE 43 TO 45 | NA | 1 | 1 | 3 | 0 | 3 |
| BUILDING NO-1 | NA | 4 | 4 | 25 | 0 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building11
As on 21 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
68 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Internal walls, at 50%.
BUILDING NO-2, ROW HOUSE 1 T0 464%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO -3,ROW HOUSE 5 TO 882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO-4,ROW HOUSE 9 TO 1582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO-5,ROW HOUSE 16 TO 1941%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO-6,ROW HOUSE 20 TO 2382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO-7,ROW HOUSE 24 TO 2982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO -8,ROW HOUSE 30 TO 3436%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO-9,ROW HOUSE 35 TO 3864%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO-10,ROW HOUSE 39 TO 4255%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO-11,ROW HOUSE 43 TO 4527%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO-19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership5
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRAVIN GANESH BHOIR | Dhansar | Palghar |
| GITA GANESH BHOIR | Dhansar | Palghar |
| GULAB RAMESH PATIL | Dhansar | Palghar |
| RESHMA RAMESH KINI | Dhansar | Palghar |
| PRADIP GANESH BHOIR | Dhansar | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO-2, ROW HOUSE 1 T0 4 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO -3,ROW HOUSE 5 TO 8 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-4,ROW HOUSE 9 TO 15 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-5,ROW HOUSE 16 TO 19 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-6,ROW HOUSE 20 TO 23 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-7,ROW HOUSE 24 TO 29 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO -8,ROW HOUSE 30 TO 34 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-9,ROW HOUSE 35 TO 38 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-10,ROW HOUSE 39 TO 42 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-11,ROW HOUSE 43 TO 45 | NA | Rs 18.10 cr | Rs 15.40 cr |
| BUILDING NO-1 | NA | Rs 18.10 cr | Rs 15.40 cr |
| - | NA | Rs 2.00 cr | Rs 1.40 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SIDDHIVINAYAK ASSOCIATES |
| Engineer | GR CONSULTANTS |
| Chartered Accountant | RAMANAND GULABCHAMD GUPTA |
| Chartered Accountant | ABHISHEK A. SINGH & CO. |
| Partner | Role in project |
|---|---|
| OM JAI KAVISH REALTORS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1 marchch 2026 highness homes.pdf | 21 Jun 2026 |
| Withdrawal Update Form 2File: Highness homes form 2 march 2026.pdf | 21 Jun 2026 |
| Withdrawal Update Form 3File: Highness homes form 3 march 2026.pdf | 21 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Highness Homes 30th June 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 OM HIGHNESS HOMES 30th Sept 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 OM HIGHNESS HOMES 31st Dec 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Highness Homes 30th June 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Highness Homes 30th Sept 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Om Highness Homes 31st Dec 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 OM Highness Homes 30th June 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 OM Highness Homes 30th Sept 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 OM Highness Homes 31st Dec 2025.pdf | 22 Jan 2026 |
| Form 1File: Form-1 31032025.pdf | 12 Jun 2025 |
| Form 2File: Form-2 31032025.pdf | 12 Jun 2025 |
| Form 3File: Form-3 31032025.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 31032025.pdf | 12 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OM Highness Homes 30 Sept 2024_compressed.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Om Highness Homes 30 sept 2024.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Om Highness Homes 30 sept 2024.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked and Sold Inventory Highness Homes 30sept 2024.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 20 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 20 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf | 20 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Highness Homes 30th Sept 2023_compressed.pdf | 22 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Highness Homes 30 sept 2023_compressed.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From -2 HIGHNESS HOMES Date 30-09-2023.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked and sold inventory HIGHNESS HOMES on 30th June 2023_compressed.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A HIGHNESS HOMES.pdf | 3 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 HIGHNESS HOMES_compressed.pdf | 2 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Highness Homes 30june 2023.pdf | 30 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Highness Homes 30 June 2023 FINAL.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rera 30th june 2023_compressed.pdf | 11 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Booked and Sold Inventory.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 30-Jan-2023 4-59 pm_compressed.pdf | 30 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSRE DHIRAJ YADAV.pdf | 18 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank Ac declaration (4).pdf | 10 Jan 2023 |
| Declaration in FORM BFile: 202212140252-1_merged.pdf | 7 Jan 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (7) (1).pdf | 7 Jan 2023 |
| Layout approvalFile: LAYOUT DHANSAR_compressed.pdf | 15 Dec 2022 |
| Building plan approvalFile: BLDG PLAN DHANDAR 4_compressed.pdf | 15 Dec 2022 |
| Building plan approvalFile: BLDG PLAN DHANSAR 1_compressed.pdf | 15 Dec 2022 |
| Building plan approvalFile: BLDG PLAN DHANSAR 3_compressed.pdf | 15 Dec 2022 |
| Building plan approvalFile: BLDG PLAN DHANSAR 2_compressed.pdf | 15 Dec 2022 |
| PAN CardFile: DHIRAJ YADAV PANCARD.pdf | 15 Dec 2022 |
| Copy of the legal title reportFile: LEGAL TITLE HIGHNESS HOMES_compressed.pdf | 15 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE FINANCE.pdf | 15 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LEGAL.pdf | 15 Dec 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE FINANCE.pdf | 15 Dec 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE LEGAL.pdf | 15 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT DHANSAR_compressed.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN DHANDAR 4_compressed.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN DHANSAR 1_compressed.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN DHANSAR 3_compressed.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN DHANSAR 2_compressed.pdf | 15 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC DHANSAR.pdf | 15 Dec 2022 |
| Declaration about Commencement CertificateFile: HIGHNESS HOMES CC.pdf | 15 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DHANSAR.pdf | 15 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 HIGHNESS HOMES_compressed.pdf | 15 Dec 2022 |
| CERSAI detailsFile: HIGHNESS HOMES CERSAI.pdf | 15 Dec 2022 |
| Proforma of Allotment letterFile: HIGHNESS HOMES DAL_compressed.pdf | 15 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: HIGHNESS HOMES DEVIATION DAL.pdf | 15 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: HIGHNESS HOMES DEVIATION DSA.pdf | 15 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HIGHNESS HOMES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANSAR3,200+ in Palghar
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: OM JAI KAVISH REALTORS
OM JAI KAVISH REALTORS has 5 registrations on MahaRERA, including OM KAVISH EXCELLENCY and HIGHNESS HOMES. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if HIGHNESS HOMES is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIGHNESS HOMES?
The registered promoter entity is OM JAI KAVISH REALTORS, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIGHNESS HOMES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HIGHNESS HOMES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIGHNESS HOMES?
The professionals named in the filing: Architect: SIDDHIVINAYAK ASSOCIATES; Engineer: GR CONSULTANTS; Chartered Accountant: RAMANAND GULABCHAMD GUPTA; Chartered Accountant: ABHISHEK A. SINGH & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIGHNESS HOMES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback