Home / Browse projects / Pune, Maharashtra / HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI

Registered No litigation declared Others project

HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI

By RM GROUP

RG-MH-75384 · RERA P52100056118 · Last updated on MahaRERA portal: 31 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Staircases, 95%
31 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI is a Others project by RM GROUP in Pune, Maharashtra, registered with MahaRERA as P52100056118 on 11 May 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 3 of the 34 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameHIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI
  • TypeOthers
  • Location
    • GANESH NAGAR ROAD
    • Stella Maris School
    • Vadgaon Sheri
    • Haveli
    • Pune
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056118
  • ReraGenie IDRG-MH-75384

Builder

  • NameRM GROUP
  • Entity typePartnership
  • PartnersRahul Sureshrao Jagtap, Mukesh Harishankar Parasher

Key dates

this monthRegisteredMay 2024First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 May 2024
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed81 files

Current status

9%3 of 34 units booked
81.2%Work done, per cost certificate

Figures as on 31 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PROPOSED RESIDENTIAL AND COMMERCIAL BUILDING ON SURVEY NO 56/3/37/1P,56/3/26/3NA98241034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

PROPOSED RESIDENTIAL AND COMMERCIAL BUILDING ON SURVEY NO 56/3/37/1P,56/3/26/3: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area750 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2026

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2305.76
Proposed, not sanctioned2,306 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 44 Hissa No 2/2 plot no 2 Somnath nagar near Inorbit mall nagar road Wadgaon Sheri Pune 411014
Estimated costRs 4.55 cr
Cost incurredRs 3.69 cr
Work done81.15%
BuildingWingEstimatedIncurred
PROPOSED RESIDENTIAL AND COMMERCIAL BUILDING ON SURVEY NO 56/3/37/1P,56/3/26/3NARs 4.05 crRs 3.44 cr
-NARs 50.00 lakhRs 25.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjit Sambhushete
EngineerSubhash Walte
EngineerNiranjan Choughule
Engineerrajendra ghatage
Chartered AccountantA P SINGHI & CO
Chartered AccountantA N SHETTY
PartnerRole in project
RM GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24022619982Dec 2025 → Dec 2026

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/12/2026 to complete the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf31 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf31 Aug 2026
Withdrawal Update Form 3File: form 3 rm group.pdf31 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf18 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf18 Aug 2026
Withdrawal Update Form 3File: form 3 rm group.pdf18 Aug 2026
Withdrawal Update Form 1File: form 1 architect certificate highlife 31_03_2026.pdf13 May 2026
Withdrawal Update Form 2File: form 2 highlife 31_03_2026.pdf13 May 2026
Withdrawal Update Form 3File: CA (1)_compressed.pdf13 May 2026
Layout approvalFile: PLAN (2)_compressed.pdf27 Apr 2026
Building plan approvalFile: revised sanction plan highlife project 2.pdf14 Mar 2026
Building plan approvalFile: revised sanction plan highlife project 3.pdf14 Mar 2026
Form 1File: 31122025.pdf24 Feb 2026
Form 2File: 31122025.pdf24 Feb 2026
Form 3File: highlife form 3 30_12_2025 scan copy.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory highlife 31_12_2025 scan copy.pdf24 Feb 2026
Form 1File: architect certificate 09_2025 highlife scan copy.pdf24 Feb 2026
Form 2File: engineer certificate 09_2025 highlife scan copy.pdf24 Feb 2026
Form 3File: highlife 30_09_2025 form 3 scan copy.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory highlife 30_09_2025 - Copy.pdf24 Feb 2026
Form 1File: architect certificate highlife project 06_2025 scan copy.pdf24 Feb 2026
Form 2File: engineer certificate 06_2025 highlife scan copy.pdf24 Feb 2026
Form 3File: form 3 highlife 30_6_2025 scan copy.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventories highlife project 30_06_2025.pdf24 Feb 2026
Withdrawal Update Form 1File: architect certificate highlife quartly report_compressed.pdf24 Feb 2026
Withdrawal Update Form 2File: quartly report form 2 highlife_compressed.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 CA cetificate highlife project quartly updation.pdf24 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A-8_page-0001.pdf24 Feb 2026
Form 2A (FY 2025-2026)File: Form 2A-8_page-0001 (1).pdf24 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 HIGHLIFE PROJECT SCAN COPY.pdf24 Feb 2026
Disclosure of sold/ booked inventoryFile: RM.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate highlife 03_2025.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: quarterly updation highlife engineer certificate 03_2025.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: highlife quarterly report form 3 31_12_2024.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS (1).pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 30092024.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG 30092024.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate highlife quartly report_compressed.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: quartly report form 2 highlife_compressed.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventries highlife quartely report.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cetificate highlife project quartly updation.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ScanAllCachesScanAll_Docs_2_compressed_compressed__1__compressed__1_-compress5.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ScanAllCachesScanAll-Docs-1_11zon.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 (2).pdf8 May 2024
Other - TechnicalFile: FORMAT ANNEXURE A.pdf8 May 2024
Layout approvalFile: 1.pdf7 May 2024
Building plan approvalFile: 2.pdf7 May 2024
Copy of Layout Approval (in case of layout)File: 1.pdf7 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf7 May 2024
Other - TechnicalFile: Wadgaonsheri Saction Plan 1-2 (1)_11zon.pdf6 May 2024
Other - TechnicalFile: Wadgaonsheri Saction Plan 2-2 (1)_11zon.pdf6 May 2024
Details of encumbrances concerned to FinanceFile: Finance Declaration NO CERSAI.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: Bank letter No CERSAI.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: Finance Declaration NO CERSAI.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: Bank letter No CERSAI.pdf19 Mar 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf19 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Seperate Bank Account Declaration.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: declaration od no legal encumbrance RERA.pdf12 Feb 2024
Details of encumbrances concerned to LegalFile: declaration od no legal encumbrance RERA.pdf12 Feb 2024
CERSAI detailsFile: declaration of financial encumbrance RERA.pdf12 Feb 2024
Proforma of Allotment letterFile: model form of allotment RERA_compressed.pdf12 Feb 2024
Proforma of Agreement for saleFile: AGREEMENT TO SALE RERA.pdf12 Feb 2024
Deviation Report with respect to Allotment letterFile: no deviation letter in allotment RERA.pdf12 Feb 2024
Deviation Report with respect to model copy of AgreementFile: no deviation letter in agreement RERA.pdf12 Feb 2024
Declaration in FORM BFile: mukesh sir affidavit cum declaration.pdf9 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: mukesh sir disclosure of interest in other real estate organisation.pdf9 Feb 2024
Other - LegalFile: vadgaonsheri 6 R sale deed (1)_compressed.pdf8 Feb 2024
Other - LegalFile: 1 5 r sale seed compressed.pdf8 Feb 2024
Other - FinanceFile: reconstruction deed.pdf8 Feb 2024
Other - FinanceFile: mortgage deed.pdf8 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate RM G.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organization RM Ga.pdf5 Feb 2024
Copy of the legal title reportFile: Format A Search Report RM G.pdf3 Feb 2024
Declaration in FORM BFile: Declaration of form B rm.pdf2 Feb 2024

How this compares with Pune

9%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Stella Maris School13,700+ in Pune

2 kmHIGHLIFE SURVEY NO 56/3/Completed 53Lapsed / revoked 29Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 160 registered projects within 2 km.

Builder: RM GROUP

RM GROUP has 1 registration on MahaRERA, including HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI?

The registered promoter entity is RM GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI?

The professionals named in the filing: Architect: Ajit Sambhushete; Engineer: Subhash Walte; Engineer: Niranjan Choughule; Engineer: rajendra ghatage; Chartered Accountant: A P SINGHI & CO; Chartered Accountant: A N SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.