Home / Browse projects / Thane, Maharashtra / HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5
HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5
RG-MH-20819 · RERA P51700005341 · Last updated on MahaRERA portal: 3 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 1 complaint at MahaRERA
- Completion date moved by 60 months
- 1 extension taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 is a Residential / Group Housing project by SIDDHI KRISH DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700005341 on 11 Aug 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 60 months from the original filing. 90 of the 413 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameHIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5
- TypeResidential / Group Housing
- Location
- Saket Road
- Balkum
- Thane (M Corp.)
- Thane
- 400608
- Pincode400608
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700005341
- ReraGenie IDRG-MH-20819
Builder
- NameSIDDHI KRISH DEVELOPERS
- Entity typeOthers
- PartnersSIDDHI DEVELOPERS HEMAL JAYENDRA GALA, SHREE SADGURU ENTERPRISES Kunal P Gala
- Other registrations5 more →
- Completed5 of 6
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2017
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 3 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 6F- MIST B | NA | 45 | 45 | 403 | 10 | 413 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.
BUILDING 6F- MIST B: 44% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed131
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING 6F- MIST B | NA | Rs 166.50 cr | Rs 48.70 cr |
| - | NA | Rs 18.50 cr | Rs 6.50 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JITESH P PAWAR AND ASSOCIATES |
| Engineer | SIDDHI KRISH DEVELOPERS |
| Chartered Accountant | RSRS And Company |
| Chartered Accountant | Bhavin Mistry |
| Partner | Role in project |
|---|---|
| SIDDHI KRISH DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. As we have NO sold units in the project we do not require any consents.
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 607/2011 | SEVENTH JOINT CJSD | FOR EVIDENCE |
| 435/2018 | CJSD THANE | DISPOSED OFF AGAINST PROMOTER |
| 607/2011 | Civil Judge Senior Division Thane | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000058117 | Ambika Yuvraj Kololagi | SIDDHI KRISH DEVELOPERS | 19/02/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Sep 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: FORM 2A - MIST B HIGHLAND HAVEN - 2024-25.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Form 1-Highland Haven 6F Mist B Phase 5 as on 31st March 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Highland Haven Building 6F Mist B as on Dec 2025.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: Form 3-Highland Haven 6F Mist B Phase 5 as on 31st March 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Highland Haven Mist B as on Sep 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Highland Haven Building 6F Mist B as on Dec 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Highland Haven Mist B as on Sep 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Highland Haven Building 6F Mist B as on Dec 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Highland Haven Mist B as on Sep 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Highland Haven Building 6F Mist B as on Dec 2025.pdf | 31 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5-6F MIST B-2024-25.pdf | 13 Dec 2025 |
| Building plan approvalFile: 1.pdf | 29 Sep 2025 |
| Building plan approvalFile: 2.pdf | 29 Sep 2025 |
| Building plan approvalFile: 3.pdf | 29 Sep 2025 |
| Building plan approvalFile: 4.pdf | 29 Sep 2025 |
| Building plan approvalFile: 5.pdf | 29 Sep 2025 |
| Building plan approvalFile: 6.pdf | 29 Sep 2025 |
| Building plan approvalFile: 7.pdf | 29 Sep 2025 |
| Building plan approvalFile: 8.pdf | 29 Sep 2025 |
| Building plan approvalFile: 9.pdf | 29 Sep 2025 |
| Building plan approvalFile: 10.pdf | 29 Sep 2025 |
| Building plan approvalFile: 11.pdf | 29 Sep 2025 |
| Building plan approvalFile: 12.pdf | 29 Sep 2025 |
| Building plan approvalFile: 13.pdf | 29 Sep 2025 |
| Building plan approvalFile: 14.pdf | 29 Sep 2025 |
| Building plan approvalFile: 15.pdf | 29 Sep 2025 |
| Building plan approvalFile: 16.pdf | 29 Sep 2025 |
| Building plan approvalFile: 17.pdf | 29 Sep 2025 |
| Building plan approvalFile: 18.pdf | 29 Sep 2025 |
| Form 1File: FORM 1 MIST B Q1 202526.pdf | 30 Jul 2025 |
| Form 2File: FORM 2 MIST B Q1 202526.pdf | 30 Jul 2025 |
| Form 3File: FORM 3 MIST B Q1 202526.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MIST B Q1 202526.pdf | 30 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIST B 6F FORM 1 Q4.pdf | 24 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 2 6F MIST B Q3.pdf | 28 Mar 2025 |
| Certificates of CA (Form 3)File: FORM 3 6F Mist B Q3.pdf | 28 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6F MIST B Q3.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3-6F-Q1-2024-25_compressed.pdf | 15 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3-6F-Q2-2024-25_compressed.pdf | 15 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-6F-Q1-2024-25.pdf | 15 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-6F-Q2-2024-25.pdf | 15 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-6F-Q1-2024-25.pdf | 13 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-6F Q2-2024-25.pdf | 13 Nov 2024 |
| Certificates of CA (Form 5)File: FORM 5-6F-2023-24.pdf | 13 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 6F MIST B 07042024.pdf | 13 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SKD 6F 2023-24.pdf | 12 Nov 2024 |
| Proforma of Agreement for saleFile: Highland Haven 6F Agreement for Sale.pdf | 18 Jul 2024 |
| OtherFile: PROPOSED PLAN OPTION A and B.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023_24 HAVENN 6F.pdf | 5 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6F Q4.pdf | 22 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-30-09-2023.pdf | 7 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-31-12-2023.pdf | 7 Mar 2024 |
| Building plan approvalFile: Highland Haven-6F-Layout.pdf | 29 Nov 2023 |
| Building Plan Approval (IOD)File: Highland Haven-6F-Layout.pdf | 29 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Highland Haven-6F-CC.pdf | 29 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-6F MIST-2022-23-30-09-2023.pdf | 30 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-March 2023.pdf | 17 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-June 2023.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-6F-2022-23.pdf | 16 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 26062023.pdf | 19 Jul 2023 |
| Certificates of CA (Form 3)File: CA certificate 2662023_compressed.pdf | 19 Jul 2023 |
| Certificates of CA (Form 3)File: form 3 BLDG 6 31 12 2022.pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Information of sold Higland.pdf | 19 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect-SKD-6F-Dec 2023.pdf | 18 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer-SKD-6F-Jan 2023.pdf | 18 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: SKD-6F-Disclosure.pdf | 18 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3-SKD 6F-Jan 2023-1.pdf | 18 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1-Form 2-SKD-6F-07-07-2022.pdf | 10 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2-Form 2-SKD-6F-07-10-2022.pdf | 10 Jan 2023 |
| Certificates of CA (Form 3)File: Q1-Form 3-SKD-7G-06-07-2022.pdf | 10 Jan 2023 |
| Certificates of CA (Form 3)File: Q2-Form-3-SKD-7G-07-10-2022.pdf | 10 Jan 2023 |
| Certificates of CA (Form 3)File: Q1-Form-3-SKD-6F-17-09-2022.pdf | 10 Jan 2023 |
| Certificates of CA (Form 3)File: Q2-Form-3-SKD-6F-07-10-2022.pdf | 10 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22-Form 5-SKD-6F-30-09-2022.pdf | 10 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6F MIST B SEPT 2022.pdf | 24 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 6F MIST B YEAR 2021-22.pdf | 24 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SKD 6F 30062022.pdf | 8 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SKD- Engineers Certificate -6F-Mist B 31032022 BLDG 6.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: CA Certificate SKDBLDG631032022.pdf | 7 Jul 2022 |
| Declaration about Commencement CertificateFile: CC Declaration-SKD-Mist A-6F.pdf | 4 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Balkum7,600+ in Thane
Filed coordinates, straight-line distance. 319 registered projects within 2 km.
RUNWAL EIRENE - PART I
Runwal Developers Private Limited
Dosti West County - Dosti Nest - Phase 1
DOSTI ENTERPRISES
Dosti West County - Dosti Nest - Phase 3
DOSTI ENTERPRISES
DOSTI WEST COUNTY - DOSTI TULIP
DOSTI ENTERPRISES
Dosti West County - Dosti Nest - Phase 4
DOSTI ENTERPRISES
Vaikunth Cluster 3 Tower 2
PEPL Developers Pvt Ltd
See every Thane project, with the district possession charts
Builder: SIDDHI KRISH DEVELOPERS
SIDDHI KRISH DEVELOPERS has 6 registrations on MahaRERA, including HIGHLAND HAVEN BUILDING 1A DEW-B PHASE 1 and HIGHLAND HAVEN BUILDING 2B DEW-A PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?
The registered promoter entity is SIDDHI KRISH DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?
The professionals named in the filing: Architect: JITESH P PAWAR AND ASSOCIATES; Engineer: SIDDHI KRISH DEVELOPERS; Chartered Accountant: RSRS And Company; Chartered Accountant: Bhavin Mistry. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback