Home / Browse projects / Thane, Maharashtra / HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5

Registered Litigation declared Residential / Group Housing project

HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5

By SIDDHI KRISH DEVELOPERS

RG-MH-20819 · RERA P51700005341 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 60 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
323 of 413Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 is a Residential / Group Housing project by SIDDHI KRISH DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700005341 on 11 Aug 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 60 months from the original filing. 90 of the 413 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5
  • TypeResidential / Group Housing
  • Location
    • Saket Road
    • Balkum
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005341
  • ReraGenie IDRG-MH-20819

Builder

  • NameSIDDHI KRISH DEVELOPERS
  • Entity typeOthers
  • PartnersSIDDHI DEVELOPERS HEMAL JAYENDRA GALA, SHREE SADGURU ENTERPRISES Kunal P Gala
  • Other registrations5 more →
  • Completed5 of 6

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed115 files

Current status

22%90 of 413 units booked
29.8%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 6F- MIST BNA454540310413

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

BUILDING 6F- MIST B: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Open Space131

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,123 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Sep 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI34355.86
Proposed, not sanctioned31,492 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO G 115, 116, 117, 118, HIGHSTREET CUM HIGHLAND CORPORATE CENTRE, KAPURBAWADI JUNCTION, THANE
Estimated costRs 185.00 cr
Cost incurredRs 55.20 cr
Work done29.84%
BuildingWingEstimatedIncurred
BUILDING 6F- MIST BNARs 166.50 crRs 48.70 cr
-NARs 18.50 crRs 6.50 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJITESH P PAWAR AND ASSOCIATES
EngineerSIDDHI KRISH DEVELOPERS
Chartered AccountantRSRS And Company
Chartered AccountantBhavin Mistry
PartnerRole in project
SIDDHI KRISH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700017178Dec 2024 → Dec 2029

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. As we have NO sold units in the project we do not require any consents.

Litigation declared3

CaseCourtStatus
607/2011SEVENTH JOINT CJSDFOR EVIDENCE
435/2018CJSD THANEDISPOSED OFF AGAINST PROMOTER
607/2011Civil Judge Senior Division ThaneOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000058117Ambika Yuvraj KololagiSIDDHI KRISH DEVELOPERS19/02/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A - MIST B HIGHLAND HAVEN - 2024-25.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1-Highland Haven 6F Mist B Phase 5 as on 31st March 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 - Highland Haven Building 6F Mist B as on Dec 2025.pdf15 May 2026
Withdrawal Update Form 3File: Form 3-Highland Haven 6F Mist B Phase 5 as on 31st March 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 - Highland Haven Mist B as on Sep 2025.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1 - Highland Haven Building 6F Mist B as on Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 - Highland Haven Mist B as on Sep 2025.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 - Highland Haven Building 6F Mist B as on Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 - Highland Haven Mist B as on Sep 2025.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 - Highland Haven Building 6F Mist B as on Dec 2025.pdf31 Mar 2026
Form 5 (FY 2024-2025)File: Form 5-6F MIST B-2024-25.pdf13 Dec 2025
Building plan approvalFile: 1.pdf29 Sep 2025
Building plan approvalFile: 2.pdf29 Sep 2025
Building plan approvalFile: 3.pdf29 Sep 2025
Building plan approvalFile: 4.pdf29 Sep 2025
Building plan approvalFile: 5.pdf29 Sep 2025
Building plan approvalFile: 6.pdf29 Sep 2025
Building plan approvalFile: 7.pdf29 Sep 2025
Building plan approvalFile: 8.pdf29 Sep 2025
Building plan approvalFile: 9.pdf29 Sep 2025
Building plan approvalFile: 10.pdf29 Sep 2025
Building plan approvalFile: 11.pdf29 Sep 2025
Building plan approvalFile: 12.pdf29 Sep 2025
Building plan approvalFile: 13.pdf29 Sep 2025
Building plan approvalFile: 14.pdf29 Sep 2025
Building plan approvalFile: 15.pdf29 Sep 2025
Building plan approvalFile: 16.pdf29 Sep 2025
Building plan approvalFile: 17.pdf29 Sep 2025
Building plan approvalFile: 18.pdf29 Sep 2025
Form 1File: FORM 1 MIST B Q1 202526.pdf30 Jul 2025
Form 2File: FORM 2 MIST B Q1 202526.pdf30 Jul 2025
Form 3File: FORM 3 MIST B Q1 202526.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MIST B Q1 202526.pdf30 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIST B 6F FORM 1 Q4.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 2 6F MIST B Q3.pdf28 Mar 2025
Certificates of CA (Form 3)File: FORM 3 6F Mist B Q3.pdf28 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6F MIST B Q3.pdf21 Feb 2025
Certificates of CA (Form 3)File: Form 3-6F-Q1-2024-25_compressed.pdf15 Nov 2024
Certificates of CA (Form 3)File: Form 3-6F-Q2-2024-25_compressed.pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-6F-Q1-2024-25.pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-6F-Q2-2024-25.pdf15 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-6F-Q1-2024-25.pdf13 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-6F Q2-2024-25.pdf13 Nov 2024
Certificates of CA (Form 5)File: FORM 5-6F-2023-24.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 6F MIST B 07042024.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SKD 6F 2023-24.pdf12 Nov 2024
Proforma of Agreement for saleFile: Highland Haven 6F Agreement for Sale.pdf18 Jul 2024
OtherFile: PROPOSED PLAN OPTION A and B.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023_24 HAVENN 6F.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6F Q4.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-30-09-2023.pdf7 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-31-12-2023.pdf7 Mar 2024
Building plan approvalFile: Highland Haven-6F-Layout.pdf29 Nov 2023
Building Plan Approval (IOD)File: Highland Haven-6F-Layout.pdf29 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Highland Haven-6F-CC.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-6F MIST-2022-23-30-09-2023.pdf30 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-March 2023.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-6F-June 2023.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-6F-2022-23.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 26062023.pdf19 Jul 2023
Certificates of CA (Form 3)File: CA certificate 2662023_compressed.pdf19 Jul 2023
Certificates of CA (Form 3)File: form 3 BLDG 6 31 12 2022.pdf28 Apr 2023
Disclosure of sold/ booked inventoryFile: Information of sold Higland.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect-SKD-6F-Dec 2023.pdf18 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer-SKD-6F-Jan 2023.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: SKD-6F-Disclosure.pdf18 Feb 2023
Certificates of CA (Form 3)File: Form 3-SKD 6F-Jan 2023-1.pdf18 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1-Form 2-SKD-6F-07-07-2022.pdf10 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2-Form 2-SKD-6F-07-10-2022.pdf10 Jan 2023
Certificates of CA (Form 3)File: Q1-Form 3-SKD-7G-06-07-2022.pdf10 Jan 2023
Certificates of CA (Form 3)File: Q2-Form-3-SKD-7G-07-10-2022.pdf10 Jan 2023
Certificates of CA (Form 3)File: Q1-Form-3-SKD-6F-17-09-2022.pdf10 Jan 2023
Certificates of CA (Form 3)File: Q2-Form-3-SKD-6F-07-10-2022.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22-Form 5-SKD-6F-30-09-2022.pdf10 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6F MIST B SEPT 2022.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 6F MIST B YEAR 2021-22.pdf24 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SKD 6F 30062022.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SKD- Engineers Certificate -6F-Mist B 31032022 BLDG 6.pdf7 Jul 2022
Certificates of CA (Form 3)File: CA Certificate SKDBLDG631032022.pdf7 Jul 2022
Declaration about Commencement CertificateFile: CC Declaration-SKD-Mist A-6F.pdf4 Jul 2022

How this compares with Thane

22%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 60 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balkum7,600+ in Thane

2 kmHIGHLAND HAVEN BUILDING Completed 143Lapsed / revoked 54Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 319 registered projects within 2 km.

Builder: SIDDHI KRISH DEVELOPERS

SIDDHI KRISH DEVELOPERS has 6 registrations on MahaRERA, including HIGHLAND HAVEN BUILDING 1A DEW-B PHASE 1 and HIGHLAND HAVEN BUILDING 2B DEW-A PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?

The registered promoter entity is SIDDHI KRISH DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?

The professionals named in the filing: Architect: JITESH P PAWAR AND ASSOCIATES; Engineer: SIDDHI KRISH DEVELOPERS; Chartered Accountant: RSRS And Company; Chartered Accountant: Bhavin Mistry. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.