ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / HDIL PARADISE CITY SECTOR 6

Registration lapsed No litigation declared Others project

HDIL PARADISE CITY SECTOR 6

By HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD

RG-MH-11311 · RERA P99000012642 · Last updated on MahaRERA portal: 14 Aug 2020

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 88 months past the filed date
  • 17 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2019Possession promised88 months past this date
40 of 176Construction stages doneacross 16 buildings; furthest along: Excavation, 90%
17Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

HDIL PARADISE CITY SECTOR 6 is a Others project by HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD in Palghar, Maharashtra, registered with MahaRERA as P99000012642 on 6 Sep 2017. Possession was promised by 30 Jun 2019 and is now 88 months past that date. 17 complaints are on record with the regulator.

At a glance

Project

  • NameHDIL PARADISE CITY SECTOR 6
  • TypeOthers
  • Location
    • Mahim
    • Palghar (West)
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000012642
  • ReraGenie IDRG-MH-11311

Builder

  • NameHOUSING DEVELOPMENT AND INFRASTRUCTURE LTD
  • Entity typeCompany
  • Managing DirectorSARANG WADHAWAN
  • Other registrations13 more →
  • No longer live14 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

88 months past promisethis monthRegisteredSep 2017PromisedJun 2019

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Sep 2017
  • Promised completion30 Jun 2019
  • Revised completionNone
  • Buildings16 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA60000
BUILDING NO 2NA60000
BUILDING NO 5NA60000
BUILDING NO 6NA60000
BUILDING NO 7NA60000
BUILDING NO 8NA60000
BUILDING NO 9NA60000
BUILDING NO 10NA60000
BUILDING NO 11NA60000
BUILDING NO 12NA60000
BUILDING NO 13NA60000
BUILDING NO 14NA60000
BUILDING NO 15NA60000
BUILDING NO 16NA60000
BUILDING NO 3NA60000
BUILDING NO 4NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building16

As on 14 Aug 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 176 construction stages are filed complete across 16 buildings. The stage furthest along is Excavation, at 90%.

BUILDING NO 142%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 212%
ActivityProgress
Excavation100%
Basement (if any)15%
Podiums (if any)0%
Plinth15%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 542%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 624%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 745%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure74%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 818%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 98%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1027%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1212%
ActivityProgress
Excavation100%
Basement (if any)15%
Podiums (if any)0%
Plinth15%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1324%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1424%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1551%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1645%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 324%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 439%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes35%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered140
BuildingClosed/CoveredTotal
BUILDING NO 11616
BUILDING NO 266
BUILDING NO 566
BUILDING NO 61515
BUILDING NO 899
BUILDING NO 91515
BUILDING NO 1066
BUILDING NO 121515
BUILDING NO 131515
BUILDING NO 141515
BUILDING NO 366
BUILDING NO 41616

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area34,576 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAPPHIRE LAND DEVELOPMENT PRIVATE LTDKurlaMumbai Suburban

Approvals and building plan

Permissible FSI47917.47
Proposed, not sanctioned47,917 sq m
Buildings approved16
Buildings sanctioned16

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandup West, Mumbai - 400 078

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE & ASSOCITES
EngineerSHAH GATTANI CONSULTANTS
PartnerRole in project
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD-

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000012696Zoher Fakhruddin NafarM/s. Housing Development and Infrastructure Ltd.16/07/2018
CC006000000055494JAYESH SOMPURAM/S HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD.25/07/2018
CC006000000044347Dinesh MirchandaniHDIL11/05/2018
CC006000000055303SUNIL D. PARNERKARHOUSING DEVELOPMENT & INFRASTRUCTURE LTD.08/07/2018
CC006000000055554Madhuri Mangesh BudhkarHDIL29/07/2018
CC006000000055734Keshav Sajba DeshprabhuHDIL10/08/2018
CC006000000057454BADHABHAI GUNTHOUSING DEVELOPMENT AND INFRASTRUCTURE LTD04/01/2019
CC006000000057942Asha Dinesh MenonHousing Development and Infrastructure Ltd22/02/2019
CC006000000078304Dr Rajesh BanthiaM/s Housing Development And Infrastructure Ltd01/03/2019
CC006000000100246DharmendraKumar SantoshKumar SinghM/s. Housing Development and Infra structure LTD22/07/2019
CC006000000078504Sanjay Ratilal PatelHOUSING DEVELOPMENT & INFRASTRUCTURE LTD16/03/2019
CC006000000078602Hiren P ShethHousing Development & Infrastructure Ltd22/03/2019
CC006000000078777Hiren P ShethHousing Development and Infrastructre Limited04/04/2019
CC006000000078882Himanshu P ShethHousing development and Infrastructure Ltd13/04/2019
CC006000000100421Gaurav SethHDIL Paradise City04/08/2019
CC006000000161311ramesh rajagopalan thustuHousing development & Infrastructure Ltd21/10/2019
CC006000000161367NEERAJ SURESH SHARMAHDIL28/10/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Jayesh Sompura - IBC Application.pdf14 Aug 2020
OtherFile: Order NCLT 20082019.pdf14 Aug 2020
OtherFile: Order 17022020 NCLT Exclusion of 106 days.pdf14 Aug 2020
OtherFile: HDIL Provisional List of Resolution Applicants.pdf14 Aug 2020
Certificates of CA (Form 5)File: Paradise City,Sector 6 - Form 5.pdf9 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArcHCertSector 6.pdf18 Jan 2018
Details of encumbrancesFile: No Encumbrance Cerificate Paradise City Sec 2,4,5AND6.pdf31 Jul 2017
Declaration in FORM BFile: Form B - Sector 6 28072017.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sector 6.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA_Cer_Paradise City - Sector 6_1.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA_Cer_Paradise City - Sector 6_2.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA_Cer_Paradise City - Sector 6_3.pdf31 Jul 2017
PAN CardFile: PANCARD.pdf30 Jul 2017
Copy of the legal title reportFile: TC-Paradise_City_Part-1.pdf30 Jul 2017
Copy of the legal title reportFile: TC-Paradise_City_Part-2.pdf30 Jul 2017
Copy of the legal title reportFile: 3TC-Paradise_City_Part-3.pdf30 Jul 2017
Copy of the legal title reportFile: TC-Paradise_City_Part-4.pdf30 Jul 2017
Copy of the legal title reportFile: TC-Paradise_City_Part-5.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6SECTOR-6.pdf30 Jul 2017
Proforma of Allotment letterFile: AL_AFS_Paradise City - Sector-6.pdf30 Jul 2017
Layout approvalFile: 03 LAYOUT 2011.pdf29 Jul 2017
Layout approvalFile: 04 LAYOUT 2017.pdf29 Jul 2017
Layout approvalFile: 05 TYPE 14 N.pdf29 Jul 2017
Layout approvalFile: 06 TYPE 14A N.pdf29 Jul 2017
Layout approvalFile: 07 TYPE 14A1 N.pdf29 Jul 2017
Layout approvalFile: 08 TYPE 14B N.pdf29 Jul 2017
Layout approvalFile: 09 TYPE 14B1 N.pdf29 Jul 2017
Layout approvalFile: 10 TYPE 14C N.pdf29 Jul 2017
Layout approvalFile: 11 TYPE 14C1 N.pdf29 Jul 2017
Building plan approvalFile: 02 NA ORDER PALGHAR 20 1 2017.pdf29 Jul 2017
Layout approvalFile: 26 TYPE 20A 1.pdf29 Jul 2017
Layout approvalFile: 27 TYPE 20A 2.pdf29 Jul 2017
Layout approvalFile: 28 TYPE 20A N.pdf29 Jul 2017
Building plan approvalFile: 01 NA ORDER PALGHAR 6 6 2011.pdf29 Jul 2017
Layout approvalFile: 22 TYPE 17C N.pdf29 Jul 2017
Layout approvalFile: 23 TYPE 19.pdf29 Jul 2017
Layout approvalFile: 24 TYPE 19 N.pdf29 Jul 2017
Layout approvalFile: 25 TYPE 20 N.pdf29 Jul 2017
Layout approvalFile: 12 TYPE 14D N.pdf29 Jul 2017
Layout approvalFile: 13 TYPE 14D1 N.pdf29 Jul 2017
Layout approvalFile: 14 TYPE 14E N.pdf29 Jul 2017
Layout approvalFile: 15 TYPE 14E1 N.pdf29 Jul 2017
Layout approvalFile: 16 TYPE 17.pdf29 Jul 2017
Layout approvalFile: 17 TYPE 17 N.pdf29 Jul 2017
Layout approvalFile: 18 TYPE 17A.pdf29 Jul 2017
Layout approvalFile: 19 TYPE 17A.pdf29 Jul 2017
Layout approvalFile: 19 TYPE 17A.pdf29 Jul 2017
Layout approvalFile: 20 TYPE 17B.pdf29 Jul 2017
Layout approvalFile: 21 TYPE 17C.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 03 LAYOUT 2011.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 04 LAYOUT 2017.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 05 TYPE 14 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 06 TYPE 14A N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 07 TYPE 14A1 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 08 TYPE 14B N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 09 TYPE 14B1 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 10 TYPE 14C N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 11 TYPE 14C1 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 12 TYPE 14D N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 13 TYPE 14D1 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 14 TYPE 14E N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 15 TYPE 14E1 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 16 TYPE 17.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 17 TYPE 17 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 18 TYPE 17A.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 19 TYPE 17A.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 19 TYPE 17A.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 20 TYPE 17B.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 21 TYPE 17C.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 22 TYPE 17C N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 23 TYPE 19.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 24 TYPE 19 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 25 TYPE 20 N.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 26 TYPE 20A 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 27 TYPE 20A 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 28 TYPE 20A N.pdf29 Jul 2017
Building Plan Approval (IOD)File: 01 NA ORDER PALGHAR 6 6 2011.pdf29 Jul 2017
Building Plan Approval (IOD)File: 02 NA ORDER PALGHAR 20 1 2017.pdf29 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
HDIL INDUSTRIAL PARKBESIDES LAXMI MARBLES CHANDANSAR ROAD VILLAGE CHANDANSAR VIRAR EAST627CompletedApr 2017Late, Jul 2017
PREMIER EXOTICA IIPREMIER AUTO KIROL ROAD KURLA WEST MUMBAI 40007083CompletedJun 2013Late, Jun 2017
HARMONYNEW LINK ROAD GOREGAON WEST MUMBAI 400104221CompletedJun 2013Late, Jul 2017
PREMIER RESIDENCESPREMIER AUTO KURLA WEST MUMBAI - 4000701,087CompletedDec 2012Late, Mar 2017
GALAXY APARTMENTS WING ABEBHANDARY ESTATE KURLA EAST MUMBAI 400024314CompletedDec 2011Late, Jun 2017
HDIL RESIDENCY PARKOPP YAZOO PARK NARANGI BYPASS ROAD VILLAGE DONGRE VIRAR WEST1,199CompletedAug 2011Late, Oct 2015

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HDIL PARADISE CITY SECTOR 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar (West)3,200+ in Palghar

2 kmHDIL PARADISE CITY SECTOCompleted 61Lapsed / revoked 24Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 120 registered projects within 2 km.

Builder: HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD

HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD has 14 registrations on MahaRERA, including THE NEST and PREMIER EXOTICA I. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that HDIL PARADISE CITY SECTOR 6 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HDIL PARADISE CITY SECTOR 6 is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HDIL PARADISE CITY SECTOR 6?

The registered promoter entity is HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HDIL PARADISE CITY SECTOR 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HDIL PARADISE CITY SECTOR 6?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HDIL PARADISE CITY SECTOR 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HDIL PARADISE CITY SECTOR 6?

The professionals named in the filing: Architect: AJAY WADE & ASSOCITES; Engineer: SHAH GATTANI CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HDIL PARADISE CITY SECTOR 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HDIL PARADISE CITY SECTOR 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HDIL PARADISE CITY SECTOR 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.