Registered No litigation declared Residential / Group Housing project

Haware Nakshatra Phase 3

By Haware Infotech Ltd

RG-MH-12703 · RERA P99000022307 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
30 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
108 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Haware Nakshatra Phase 3 is a Residential / Group Housing project by Haware Infotech Ltd in Palghar, Maharashtra, registered with MahaRERA as P99000022307 on 9 Sep 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 8 of the 116 units on this registration are recorded sold or booked, and 30 of 33 construction stages are filed complete.

At a glance

Project

  • NameHaware Nakshatra Phase 3
  • TypeResidential / Group Housing
  • Location
    • S No 66-1
    • Tembhode Village
    • Opp Dandekar College
    • Tembhode
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000022307
  • ReraGenie IDRG-MH-12703

Builder

  • NameHaware Infotech Ltd
  • Entity typeCompany
  • DirectorSuresh Haware
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredSep 2019First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Sep 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • Buildings3 building records
  • Documents filed46 files

Current status

7%8 of 116 units booked
88.6%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Neptune Residency Bldg 4ANA5536339
Neptune Residency Bldg 5ANA5539039
Neptune Residency Bldg 9ANA8838038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Neptune Residency Bldg 4A91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Neptune Residency Bldg 5A91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Neptune Residency Bldg 9A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed666

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots666
Closed/Covered666
BuildingClosed/CoveredTotal
Neptune Residency Bldg 4A222222
Neptune Residency Bldg 5A222222
Neptune Residency Bldg 9A222222

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,747 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI4568.62
Proposed, not sanctioned4,569 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No 14,15 16, Shri Ganesh Chs, Sector 1, Opp.Apna Bazar, Vashi, Navi Mumbai Dist.400703
Estimated costRs 11.25 cr
Cost incurredRs 9.96 cr
Work done88.56%
BuildingWingEstimatedIncurred
Neptune Residency Bldg 4ANARs 3.56 crRs 3.16 cr
Neptune Residency Bldg 5ANARs 3.56 crRs 3.16 cr
Neptune Residency Bldg 9ANARs 3.56 crRs 3.16 cr
-NARs 56.25 lakhRs 49.81 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddhivinayak Associates
ArchitectPB Associates
EngineerSaeed Shaikh
EngineerSK Consultants & Engineers
Chartered AccountantS C Jain
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Haware Infotech Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28102518184Dec 2024 → Dec 2026

Reason as filed by the promoterDue to unexpected market conditions and a drop in sales rates, the financial feasibility of the project has been temporarily affected. As a result, we have paused construction work for the time being to reassess our approach. The current slowdown has impacted cash flow, which is critical to continue construction. We believe this is a temporary phase and expect the market to recover soon. Once the situation improves, we plan to resume work and complete the project without compromising on quality or commitments. We remain fully committed to our obligations towards allottees, stakeholders, and th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Haware Nakshatra Phase 3 as on June 2026.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2 - Haware Nakshatra Phase 3 as on June 2026.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3 - Haware Nakshatra Phase 3 as on June 2026.pdf10 Aug 2026
Withdrawal Update Form 1File: Form 1 - Haware Nakshatra Phase 3 as on June 2026.pdf19 Jul 2026
Withdrawal Update Form 2File: Form 2 - Haware Nakshatra Phase 3 as on June 2026.pdf19 Jul 2026
Withdrawal Update Form 3File: Form 3 - Haware Nakshatra Phase 3 as on June 2026.pdf19 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 -Haware Nakshatra Phase 3 - 2024-25.pdf5 Jun 2026
Layout approvalFile: Plan 1.pdf14 May 2026
Building plan approvalFile: Plan 2 - Built up area calculation Highlighted.pdf14 May 2026
Building plan approvalFile: Building 4AType B Typical Plan.pdf14 May 2026
Building plan approvalFile: Building 5A Type B Typical Plan.pdf14 May 2026
Building plan approvalFile: Building 9A Type M Typical Plan.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 - Nakshatra Phase 3 as on Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Haware Nakshatra Phase 3.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Nakshatra Phase 3 as on Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 of Nakshatra Phase 3_as on 31-03-2026 (2).pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - Nakshatra Phase 3 as on Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 of Nakshatra Phase 3_as on 31-03-2026 (2).pdf20 Apr 2026
Form 5 (FY 2019-2020)File: Form 5 2019-20.pdf12 Mar 2026
Form 5 (FY 2020-2021)File: Form 5 2020-21.pdf12 Mar 2026
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf12 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf12 Mar 2026
Layout approvalFile: Building 4AType B Typical Plan_1.pdf14 Jan 2026
Layout approvalFile: Building 5A Type B Typical Plan_2.pdf14 Jan 2026
Building plan approvalFile: Building 9A Type M Typical Plan_3.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 - Haware Nakshatra Phase 3 as on June 2025 (SIGNED).pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1 - Haware Nakshatra Phase 3 as on Sep 2025.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 - Haware Nakshatra Phase 3 as on June 2025 (SIGNED).pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 - Nakshatra Phase 3 as on Sept 2025.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 - Haware Nakshatra Phase 3 as on June 2025.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 of Nakshatra Phase 3 as on 30th Sept 2025.pdf12 Jan 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Haware Nakshatra Phase 3 FORM 2A (2019-2020) Signed.pdf20 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Haware Nakshatra Phase 3 FORM 2A (2020-21) Signed.pdf20 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Haware Nakshatra Phase 3 FORM 2A (2021-22) Signed.pdf20 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Haware Nakshatra Phase 3 FORM 2A (2022-23) Signed.pdf20 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Haware Nakshatra Phase 3 FORM 2A (2023-24) Signed.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Haware Nakshatra Phase 3.pdf3 Sep 2019
Details of encumbrancesFile: Details of Encumbrances nakshtra phase 3.pdf31 Aug 2019
Declaration in FORM BFile: Affidavit Cum Declartaion Phase 3.pdf31 Aug 2019
Layout approvalFile: Layout_compressed.pdf29 Aug 2019
Building plan approvalFile: Layout_compressed.pdf29 Aug 2019
Copy of the legal title reportFile: Nakshatra Title Certificate Scan 28-08-19.pdf29 Aug 2019
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf29 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: Layout_compressed.pdf29 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Aug 2019
Proforma of Allotment letterFile: Nakshatra Agreement Draft 26-8-2019.pdf29 Aug 2019

How this compares with Palghar

7%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 24 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Haware Nakshatra Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp Dandekar College3,200+ in Palghar

2 kmHaware Nakshatra Phase 3Completed 21Lapsed / revoked 16Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: Haware Infotech Ltd

Haware Infotech Ltd has 3 registrations on MahaRERA, including Haware Nakshatra Phase 2 and Haware Nakshatra Phase 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Haware Nakshatra Phase 3 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Haware Nakshatra Phase 3?

The registered promoter entity is Haware Infotech Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Haware Nakshatra Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Haware Nakshatra Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Haware Nakshatra Phase 3?

The professionals named in the filing: Architect: Siddhivinayak Associates; Architect: PB Associates; Engineer: Saeed Shaikh; Engineer: SK Consultants & Engineers; Chartered Accountant: S C Jain; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Haware Nakshatra Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Haware Nakshatra Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Haware Nakshatra Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.