ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Harsh Aurum

Registered No litigation declared Residential / Group Housing project

Harsh Aurum

By HARSH DEVELOPERS & INFRASTRUCTURE LLP

RG-MH-69574 · RERA PR1170002502696 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedno revision filed
0 of 9Construction stages donefurthest along: Excavation, 40%
37 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 11 documents Report an error

Harsh Aurum is a Residential / Group Housing project by HARSH DEVELOPERS & INFRASTRUCTURE LLP in Mumbai City, Maharashtra, registered with MahaRERA as PR1170002502696 on 10 Mar 2026. Possession is promised by 30 Apr 2029. 0 of the 37 units on this registration are recorded sold or booked, and 0 of 9 construction stages are filed complete.

At a glance

Project

  • NameHarsh Aurum
  • TypeResidential / Group Housing
  • Location
    • SWATANTRYAVEER SAVARKAR ROAD (CADEL ROAD)
    • DADAR WEST
    • Mahim
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1170002502696
  • ReraGenie IDRG-MH-69574

Builder

  • NameHARSH DEVELOPERS & INFRASTRUCTURE LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAK-7698
  • GSTIN27AAKFH8287L1ZJ
  • Designated PartnersHARSH SURESH GUPTA, RAMESH SHYAMLAL GUPTA, RAKHEE RAMESH GUPTA, ANKITA HARSH GUPTA
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2026PromisedApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Mar 2026
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed11 files

Current status

0%0 of 37 units booked
14.1%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Harsh AurumNA222137037

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 9 construction stages are filed complete. The stage furthest along is Excavation, at 40%.

Harsh Aurum: 4% average across the applicable activities

ActivityProgress
Excavation40%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Stilt / Ground1
Mechanical41
Stack Parking4

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area501 sq m
Land owned byNot the promoter
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jan 2026
LandownerVillageDistrict
Meghana Ashok Marathe-Mumbai City
Mayuresh Ashok Marathe-Mumbai City
Pushkaraj Ashok Marathe-Mumbai City
Shirish Anant Marathe-Mumbai City
Shriniwas Anant Marathe-Mumbai City
Atul Madhusudan Marathe-Nagpur
Harshvardhan Madhusudan Marathe-Nagpur
Sharad Vishnu Marathe-Mumbai City
Hemant Vishnu Marathe-Pune
Varsha Anand Khare-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2583.66
Proposed, not sanctioned2,583 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND AND FIRST FLOOR KONKAN CHS MAHIM WEST MUMBAI MAHARASHTRA 400016
Estimated costRs 20.19 cr
Cost incurredRs 2.85 cr
Work done14.12%
BuildingWingEstimatedIncurred
Harsh AurumNARs 20.19 crRs 2.85 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESHCHANDRA POWAR
EngineerSATISH MARUTI HANDE
Chartered AccountantSHIVANAND AMARKHED
Chartered AccountantMALAY NITIN FURIA
PartnerRole in project
HARSH DEVELOPERS & INFRASTRUCTURE LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed11

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: HA_FORM 1_ARCHITECT CERTIFICATE.pdf20 Apr 2026
Withdrawal Update Form 2File: HA_FORM 2_ENGINEERS CERTIFICATE.PDF20 Apr 2026
Withdrawal Update Form 3File: HA_FORM 3_CHARTERED ACCOUNTANT CERTIFICATE_310326.pdf20 Apr 2026
Building plan approvalFile: 28MAY2025_HARSH AURUM_IOD CERTIFICATE.pdf22 Jan 2026
Layout approvalFile: HARSH AURUM_LAYOUT APPROVAL PLAN.pdf12 Jan 2026
Declaration and undertaking (Annexure A)File: HA_DECLARATION CUM UNDERTAKING.PDF12 Jan 2026
Building plan approvalFile: 28MAY2025_HARSH AURUM_IOD DRAWING-1.pdf10 Jan 2026
Building plan approvalFile: 28MAY2025_HARSH AURUM_IOD DRAWING-2.pdf10 Jan 2026
Building plan approvalFile: 28MAY2025_HARSH AURUM_IOD DRAWING-3.pdf10 Jan 2026
Building plan approvalFile: 28MAY2025_HARSH AURUM_IOD DRAWING-4.pdf10 Jan 2026
Building plan approvalFile: 28MAY2025_HARSH AURUM_IOD DRAWING-5.pdf10 Jan 2026

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HARSH TULIPP51900051870SION WEST49Jul 2023CompletedOct 2026Nov 2025
HARSH VISTAP51900024022MAHIM-Jan 2020CompletedJun 2024Jul 2022

How this compares with Mumbai City

0%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Harsh Aurum on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR WEST780+ in Mumbai City

2 kmHarsh AurumCompleted 78Lapsed / revoked 66Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 229 registered projects within 2 km.

Builder: HARSH DEVELOPERS & INFRASTRUCTURE LLP

HARSH DEVELOPERS & INFRASTRUCTURE LLP has 5 registrations on MahaRERA, including HARSH VISTA and HARSH TULIP. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Harsh Aurum is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Harsh Aurum?

The registered promoter entity is HARSH DEVELOPERS & INFRASTRUCTURE LLP, a limited liability partnership as per the filing. Its LLPIN AAK-7698 and GSTIN 27AAKFH8287L1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Harsh Aurum?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Harsh Aurum?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Harsh Aurum?

The professionals named in the filing: Architect: UMESHCHANDRA POWAR; Engineer: SATISH MARUTI HANDE; Chartered Accountant: SHIVANAND AMARKHED; Chartered Accountant: MALAY NITIN FURIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Harsh Aurum?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Harsh Aurum. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Harsh Aurum to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.