ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Hari Aangan- Residential, High Streets Shopping Mall -Commercial

Registered No litigation declared Others project

Hari Aangan- Residential, High Streets Shopping Mall -Commercial

By KBC GLOBAL LIMITED

RG-MH-13282 · RERA P51600024203 · Last updated on MahaRERA portal: 29 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 80%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Hari Aangan- Residential, High Streets Shopping Mall -Commercial is a Others project by KBC GLOBAL LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600024203 on 27 Jan 2020. Possession is promised by 30 Dec 2027.

At a glance

Project

  • NameHari Aangan- Residential, High Streets Shopping Mall -Commercial
  • TypeOthers
  • Location
    • Ashoka marg
    • Nashik
    • 422011
  • Pincode422011
  • RERA no.P51600024203
  • ReraGenie IDRG-MH-13282

Builder

  • NameKBC GLOBAL LIMITED
  • Entity typeCompany
  • CINL45400MH2007PLC174194
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorNaresh Jagumal Karda
  • Other registrations19 more →
  • Completed6 of 20
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredJan 2020PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jan 2020
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hari Angan- Residential, High Streets Shopping Mall- CommercialNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

Hari Angan- Residential, High Streets Shopping Mall- Commercial: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed205

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots205
Closed/Covered96
Open Space109

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,510 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
D S P realtorsNashikNashik

Approvals and building plan

Permissible FSI13531.44
Proposed, not sanctioned6,678 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Krupa complex, near Bytco college , Nashik road, Nashik-422101

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Kumath
EngineerRajesh Zagade
Chartered AccountantSushil Bramhecha
PartnerRole in project
DHARAN INFRA-EPC LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: HARI AANGAN.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Aangan.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Aangan.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hari Angan.pdf23 Mar 2024
Details of encumbrancesFile: Encumbrance certificate (1) (3)_page-0001_page-0001.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance (4)_page-0001_page-0001.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate finance (4)_page-0001_page-0001.pdf23 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank acc details (3)_page-0001.pdf23 Feb 2024
Deviation Report with respect to Allotment letterFile: Encumbrance certificate-model allotment letter (3)_page-0001_page-0001.pdf23 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Encumbrance certificate-model agreement (3)_page-0001_page-0001.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Aangan.pdf24 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari aangan.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Hari Aangan.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Angan.pdf15 Jul 2023
Disclosure of sold/ booked inventoryFile: Hari Aangan.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Angan.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Angan.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Angan.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Aangan.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Hari Aangan.pdf5 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Angan.pdf20 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Angan.pdf20 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Angan.pdf20 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Angan.pdf20 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Angan.pdf16 Mar 2023
Disclosure of sold/ booked inventoryFile: HARI AANGAN.pdf29 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari angan.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: Hari Angan.pdf12 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: HARI AANGAN.pdf22 Jan 2022
Disclosure of sold/ booked inventoryFile: HARI AANGAN.pdf15 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Angan 19-20.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Angan 20-21.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aangan.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Aangan.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aangan.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aangan.pdf13 Oct 2021
Disclosure of sold/ booked inventoryFile: HARI AANGAN.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari Aangan- high street.pdf8 Oct 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-ANGAN.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Hari Angan High Streets_compressed.pdf30 Sep 2020
Layout approvalFile: Layout.pdf23 Jan 2020
Building plan approvalFile: default 0001.pdf23 Jan 2020
Building plan approvalFile: default 0002.pdf23 Jan 2020
Building plan approvalFile: default 0003.pdf23 Jan 2020
Building plan approvalFile: default 0004.pdf23 Jan 2020
Building plan approvalFile: default 0005.pdf23 Jan 2020
Building plan approvalFile: default 0006.pdf23 Jan 2020
Building plan approvalFile: default 0007.pdf23 Jan 2020
PAN CardFile: Pan Card.pdf23 Jan 2020
Copy of the legal title reportFile: Title Report.pdf23 Jan 2020
Details of encumbrancesFile: Encumberance.pdf23 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0001.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0002.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0003.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0004.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0005.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0006.pdf23 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: default 0007.pdf23 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf23 Jan 2020
Declaration in FORM BFile: High Streets-Form B- Promoter.pdf23 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: High Streets -CA Certificate.pdf23 Jan 2020
Proforma of Allotment letterFile: High Streets -Agreement.pdf23 Jan 2020

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise10 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hari ShrushtiOpp IT Park Wadala Road indira Nagar Nashik 42221450CompletedJul 2015Late, Aug 2015
Hari Sneh Phase IIBehind Ashoka Universal School near IT park Nashik 42201150CompletedMay 2015Late, Jun 2015
Hari AmrutLokhande Mala Old Saikheda road Jail road Nashik 42221469CompletedJul 2014Late, Jul 2014
Hari SparshBarnes School Deolali camp Nashik-42250276CompletedMay 2014Apr 2014
Hari OmPhase INear Guru Givind Singh polytechnic college Indira Nagar Nashik 422009216CompletedOct 2013Late, Nov 2013
Hari Aangan Phase IJachak Mala Jai Bhavani Road Deolali24CompletedApr 2013Late, May 2013
Hari Sneh IBehind Ashoka universal School near IT park Nashik42201150CompletedDec 2012Sep 2012
Hari SankalpNear Serene Meadows Gangapur Road 42201337CompletedOct 2012Late, Nov 2012
Hari KunjJai Bhavani Road Nashik Road36CompletedSep 2012Late, Oct 2012
Hari Vandan Phase IINear Aarambh Maha Vidyalaya Sane Guruji nagar Jail Road Nashik 42210128CompletedAug 2012Late, Oct 2012
Hari Sankul Phase INear Ashoka Universal School behind Fame Multiplex Ashoka Marg Nashik 42200693CompletedDec 2011Late, May 2012
Hari NiwasBehind Muktidham near hotel Orange Tree Datta Mandir Nashik Road Nashik 42210193CompletedJul 2011Late, Sep 2011

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hari Aangan- Residential, High Streets Shopp on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ashoka Marg4,100+ in Nashik

Builder: KBC GLOBAL LIMITED

KBC GLOBAL LIMITED has 20 registrations on MahaRERA, including HARI SPARSH II and HARI VATIKA. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 12 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Hari Aangan- Residential, High Streets Shopping Mall -Commercial is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hari Aangan- Residential, High Streets Shopping Mall -Commercial?

The registered promoter entity is KBC GLOBAL LIMITED, a company as per the filing. Its CIN L45400MH2007PLC174194 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hari Aangan- Residential, High Streets Shopping Mall -Commercial?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hari Aangan- Residential, High Streets Shopping Mall -Commercial?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hari Aangan- Residential, High Streets Shopping Mall -Commercial?

The professionals named in the filing: Architect: Sumit Kumath; Engineer: Rajesh Zagade; Chartered Accountant: Sushil Bramhecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hari Aangan- Residential, High Streets Shopping Mall -Commercial?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hari Aangan- Residential, High Streets Shopping Mall -Commercial. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hari Aangan- Residential, High Streets Shopp to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.