Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 57 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HARI AAKRUTI PHASE II is a Others project by KBC GLOBAL LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600014676 on 20 Dec 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 57 months from the original filing. 49 of the 49 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameHARI AAKRUTI PHASE II
- TypeOthers
- Location
- Kathe Galli
- NASHIK
- 422011
- Pincode422011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600014676
- ReraGenie IDRG-MH-08602
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Dec 2017
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 24 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HARI AAKRUTI PHASE II | NA | 11 | 6 | 25 | 24 | 49 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.
HARI AAKRUTI PHASE II: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KULDEEP CHAWARE |
| Engineer | SHRIDHAR PUJARI |
| Chartered Accountant | HSB & Go. |
| Chartered Accountant | Sharp Arth & Co LLP |
| Partner | Role in project |
|---|---|
| DHARAN INFRA-EPC LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere has been delay in construction because of unavoidable problems faced due to pandemic of COVID-19. Hence we hereby request you to allow the extension of a period of 12 months
Reason as filed by the promoterdue to unavoidable reasons the construction has been delayed
Reason as filed by the promoterConstruction is being delayed due to unavoidable reason
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC001000000030279 | Haresh Udharam Budhrani | KBC Global Limited | 26/08/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Dec 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: HARI AAKRUTI II DEC.pdf | 24 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 311224.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 310325.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 300924.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 311224.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 310325.pdf | 23 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 311224.pdf | 23 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 310325.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: Akruti.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: AakrutiII.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AakrutiII2A30624.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AakrutiII2A30924.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aakruti IIForm230924.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AakrutiII230624.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AakrutiII300624.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AakrutiII300924.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AakrutiII130624.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AakrutIIForm130924.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AakrutiII130624.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AakrutIIForm130924.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: Akruti.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: AakrutiII.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aakruti IIForm230924.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AakrutiII230624.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AakrutiII300624.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AakrutiII300924.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AakrutiII2A30624.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AakrutiII2A30924.pdf | 8 Oct 2024 |
| Declaration in FORM BFile: 240813064932_0001.pdf | 14 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: HARI AAKRUTI II.pdf | 29 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Aakruti II.pdf | 26 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance (3)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Details of encumbrancesFile: Encumbrance certificate (1) (2)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate finance (3)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank acc details (2)_page-0001.pdf | 23 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Encumbrance certificate-model allotment letter (2)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Encumbrance certificate-model agreement (2)_page-0001_page-0001.pdf | 23 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Aakruti Phase II.pdf | 17 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Hari Aakruti II.pdf | 17 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (2).pdf | 23 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aakruti II.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: FORM 3 HARI AKRUTI - II (1)_compressed.pdf | 23 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: akruti II.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Aakruti II.pdf | 11 Oct 2023 |
| Declaration in FORM BFile: Form B (2).pdf | 9 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 22-23.PDF | 16 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.PDF | 15 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.PDF | 15 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Akruti II.pdf | 15 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Aakruti II.pdf | 15 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Aakruti II.pdf | 17 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: HARI AAKRUTI II.pdf | 6 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Aakruti II.pdf | 6 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Aakruti II.pdf | 5 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Hari Aakruti II.pdf | 5 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Akruti II.pdf | 20 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aakruti II.pdf | 20 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Akruti II.pdf | 16 Mar 2023 |
| Details of encumbrancesFile: Hari Aakruti II (1)_page-0001.pdf | 9 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: HARI AAKRUTI II.pdf | 29 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari Aakruti II.pdf | 5 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Aakruti II.pdf | 12 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AAKRUTI II.pdf | 5 Feb 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-Aakruti II (1)_page-0001.pdf | 1 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: June30.pdf | 1 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Sept30.pdf | 1 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: HARI AAKRUTI II.pdf | 15 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aakruti II.pdf | 14 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aakruti II.pdf | 14 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AAkruti II 20-21.pdf | 13 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aakruti II.pdf | 13 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: HARI AAKRUTI II.pdf | 12 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari aakruti-ii.pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Hari Akruti.pdf | 7 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AAkruti 19-20.pdf | 25 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AAkruti 20-21.pdf | 25 Aug 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-Aakruti II.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Hari Aakruti II-18-19.pdf | 1 Oct 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Hari Aakruti II_compressed.pdf | 30 Sep 2020 |
| Certificates of CA (Form 5)File: Form 5 - Hari Aakruti II_compressed.pdf | 30 Sep 2019 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hari Shrushti | Opp IT Park Wadala Road indira Nagar Nashik 422214 | 50 | Completed | Jul 2015 | Late, Aug 2015 |
| Hari Sneh Phase II | Behind Ashoka Universal School near IT park Nashik 422011 | 50 | Completed | May 2015 | Late, Jun 2015 |
| Hari Amrut | Lokhande Mala Old Saikheda road Jail road Nashik 422214 | 69 | Completed | Jul 2014 | Late, Jul 2014 |
| Hari Sparsh | Barnes School Deolali camp Nashik-422502 | 76 | Completed | May 2014 | Apr 2014 |
| Hari OmPhase I | Near Guru Givind Singh polytechnic college Indira Nagar Nashik 422009 | 216 | Completed | Oct 2013 | Late, Nov 2013 |
| Hari Aangan Phase I | Jachak Mala Jai Bhavani Road Deolali | 24 | Completed | Apr 2013 | Late, May 2013 |
| Hari Sneh I | Behind Ashoka universal School near IT park Nashik422011 | 50 | Completed | Dec 2012 | Sep 2012 |
| Hari Sankalp | Near Serene Meadows Gangapur Road 422013 | 37 | Completed | Oct 2012 | Late, Nov 2012 |
| Hari Kunj | Jai Bhavani Road Nashik Road | 36 | Completed | Sep 2012 | Late, Oct 2012 |
| Hari Vandan Phase II | Near Aarambh Maha Vidyalaya Sane Guruji nagar Jail Road Nashik 422101 | 28 | Completed | Aug 2012 | Late, Oct 2012 |
| Hari Sankul Phase I | Near Ashoka Universal School behind Fame Multiplex Ashoka Marg Nashik 422006 | 93 | Completed | Dec 2011 | Late, May 2012 |
| Hari Niwas | Behind Muktidham near hotel Orange Tree Datta Mandir Nashik Road Nashik 422101 | 93 | Completed | Jul 2011 | Late, Sep 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HARI AAKRUTI PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 331 registered projects within 2 km.
Anandvan Housing Complex
Ravi Mahajan Buildcon LLP
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: KBC GLOBAL LIMITED
KBC GLOBAL LIMITED has 20 registrations on MahaRERA, including HARI SPARSH II and HARI VATIKA. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 12 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that HARI AAKRUTI PHASE II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HARI AAKRUTI PHASE II is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HARI AAKRUTI PHASE II?
The registered promoter entity is KBC GLOBAL LIMITED, a company as per the filing. Its CIN L45400MH2007PLC174194 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HARI AAKRUTI PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HARI AAKRUTI PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HARI AAKRUTI PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HARI AAKRUTI PHASE II?
The professionals named in the filing: Architect: KULDEEP CHAWARE; Engineer: SHRIDHAR PUJARI; Chartered Accountant: HSB & Go.; Chartered Accountant: Sharp Arth & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HARI AAKRUTI PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback