Home / Browse projects / Mumbai City, Maharashtra / Harbour Heights

Registered Litigation declared Others project

Harbour Heights

By SHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED

RG-MH-20434 · RERA P51900004243 · Last updated on MahaRERA portal: 30 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 29 cases
  • 25 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 95%
0 of 6Units unsoldnot recorded sold or booked
25Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Harbour Heights is a Others project by SHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900004243 on 9 Aug 2017. Possession is promised by 30 Dec 2026. 103 of the 6 units on this registration are recorded sold or booked, and 0 of 66 construction stages are filed complete. 25 complaints are on record with the regulator.

At a glance

Project

  • NameHarbour Heights
  • TypeOthers
  • Location
    • Matharpakhadi Road
    • Rey Road
    • Mumbai City
    • 400010
  • Pincode400010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900004243
  • ReraGenie IDRG-MH-20434

Builder

  • NameSHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2008PTC183644
  • GSTIN27AAMCS0876P1ZH
  • Authorized SignatoryGirish M Limbachiya
  • DirectorAlpesh Gandhi

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed79 files

Current status

1717%103 of 6 units booked
3.5%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA9110101
TOWER 2NA9110101
TOWER 3NA9110101
TOWER 4NA9110101
RETAIL 1NA1110011
RETAIL 2NA1110011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 95%.

TOWER 123%
ActivityProgress
Excavation95%
Basement (if any)85%
Podiums (if any)0%
Plinth68%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 25%
ActivityProgress
Excavation57%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 34%
ActivityProgress
Excavation42%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RETAIL 111%
ActivityProgress
Excavation92%
Basement (if any)14%
Podiums (if any)0%
Plinth14%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RETAIL 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed3164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3,164
Closed/Covered3,164
BuildingClosed/CoveredTotal
TOWER 1633633
TOWER 2609609
TOWER 3608608
TOWER 4633633
RETAIL 1501501
RETAIL 2180180

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area38,882 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Jul 2026
LandownerVillageDistrict
Sumer Buildcorp Private LimitedMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI267090.48
Proposed, not sanctioned65,524 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaheja Towers , Unit 3, ground floor, plot no C-90, Gblock ,BKC,Bandra east, Mumbai-400051
Estimated costRs 2,345
Cost incurredRs 81
Work done3.47%
BuildingWingEstimatedIncurred
TOWER 1NARs 2,345Rs 81

Certifying professionals and partners13

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSSA Architects
ArchitectGirish Chaudhari
ArchitectAshwin Parmar
EngineerBuro Happold Engineers India Pvt Ltd
EngineerVinayak Mistry
EngineerDinkar Pimpale
Chartered AccountantMRP & Associates
Chartered AccountantShachi Somani and associate
Chartered AccountantRohira Mehta and associate
Chartered AccountantJatin Motwani & Co
Chartered AccountantSanjeev S Shah & Co
Chartered AccountantSanjeev S Shah Co
PartnerRole in project
SHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED-

Litigation declared29

CaseCourtStatus
RAE Suit No 1738/2554 /2006Small Causes CourtPending
CC No 68/2015Maharashtra State Consumer CommissionPending
CC No 70/2015Maharashtra State Consumer CommissionPending
CC No 74/2015Maharashtra State Consumer CommissionPending
CC No 75/2015Maharashtra State Consumer CommissionClosed
CC No 78/2015Maharashtra State Consumer CommissionPending
CC No 79/2015Maharashtra State Consumer CommissionPending
CC No 80/2015Maharashtra State Consumer CommissionClosed
CC No 81/2015Maharashtra State Consumer CommissionPending
CC No 83/2015Maharashtra State Consumer CommissionPending
CC No 106/2015Maharashtra State Consumer CommissionPending
CC No 107/2015Maharashtra State Consumer CommissionPending
CC No 67/2015Maharashtra State Consumer CommissionPending
CC No 69/2015Maharashtra State Consumer CommissionClosed
CC No 73/2015Maharashtra State Consumer CommissionPending
CC No 76/2015Maharashtra State Consumer CommissionClosed
CC No 71/2015Maharashtra State Consumer CommissionPending
CC No 77/2015Maharashtra State Consumer CommissionPending
CC No 77/2015Maharashtra State Consumer CommissionPending
CC No 79/2015Maharashtra State Consumer CommissionPending
CC No 82/2015Maharashtra State Consumer CommissionPending
CC No 173/2009Maharashtra State Consumer CommissionPending
CC No 72/2015Maharashtra State Consumer CommissionClosed
Lodging No 22481/2015Bombay High CourtPending
2638/2008Bombay High CourtClosed
1034/2007Small Causes CourtClosed
2970/2018BOMBAY HIGH COURTDISPOSED OFF
1341/2018BOMBAY HIGH COURTPENDING
2665/2018BOMBAY HIGH COURTPENDING

Complaints filed with MahaRERA25

Case no.ComplainantRespondentFiled
CC006000000194604Sumit KajareAsif Shaikh20/10/2020
CC006000000197111SUVEF MOHAMMED RAZA SHAIKHRADIUS SUMER DEVELOPERS PVT. LTD03/06/2021
CC006000000292346MAKBUL HUSSAIN DHOLFARRadius Sumer Developers Pvt Ltd24/08/2022
CC006000000292347ZAKIR HUSSAINI GHOTAWALARadius Sumer Developers Pvt Ltd24/08/2022
CC006000000292348JUZAR HUSSAIN DHOLFARRadius Sumer Developers Pvt. Ltd24/08/2022
CC006000000292349AKBAR ALI USTADRadius Sumer Developers Pvt. Ltd24/08/2022
CC006000000292350HUSSAINI GHOTAWALARadius Sumer Developers Pvt. Ltd24/08/2022
CC006000000408211Munira Shabbir PatanwalaRadius Sumer Developers Pvt. Ltd28/11/2023
CC12400265Rajiv Kumar PatelRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400236Mahesh ParteRADIUS SUMER DEVELOPERS PRIVATE LIMITED26/09/2024
CC12400243Kailash SRINIVASAN KudlurRADIUS SUMER DEVELOPERS PRIVATE LIMITED26/09/2024
CC12400251Kiran DeverlaRADIUS SUMER DEVELOPERS PRIVATE LIMITED28/09/2024
CC12400261Commandur Parthasarthy SrinivasaRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400262Naresh PaiRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400263Ramanarasimham GudimetlaRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400264Pushkar Vishwambhar DeshmukhRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400266Venkatesh Srinivasan SrinivasanRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400267Venkata MandapatiRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400268Bhuvaneswaram KesavanRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400269Rohith ShettyRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400272Srikanth Raghavan Srinivasan IyengarRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400273Praveen KumarRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400274Srikanth KongaraRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400275Ranganathan RajagopalanRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024
CC12400276Karan PanwarRADIUS SUMER DEVELOPERS PRIVATE LIMITED29/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Incoming Promoter 01 July 2027.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2 - Incoming Promoter 01 July 2027.pdf30 Jul 2026
Withdrawal Update Form 3File: Final Form 3 - Incoming Promoter Naman dt 28 July 2026.pdf30 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2.pdf6 Jul 2026
Form 2A (FY 2024-2025)File: FORM 2.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 - Incoming Promoter 01 July 2027.pdf4 Jul 2026
Withdrawal Update Form 1File: Form 1 - Incoming Promoter 01 July 2027.pdf4 Jul 2026
Withdrawal Update Form 2File: Form 2 - Incoming Promoter 01 July 2027.pdf4 Jul 2026
Withdrawal Update Form 2File: Form 2 - Incoming Promoter 01 July 2027.pdf4 Jul 2026
Withdrawal Update Form 3File: Form 3 - Incoming Promoter 01 July 2027.pdf4 Jul 2026
Withdrawal Update Form 3File: Form 3 - Incoming Promoter 01 July 2027.pdf4 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 2020 - Old Promoter.pdf4 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 2020 - Old Promoter.pdf4 Jul 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Form 1File: Form 1.pdf9 Jun 2026
Form 2File: Form 2.pdf9 Jun 2026
Form 3File: Form 3.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 5.pdf9 Jun 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RSDPL hh.pdf2 Nov 2020
Certificates of CA (Form 3)File: Form 3- HH Dec 19.pdf3 Mar 2020
Certificates of CA (Form 5)File: Harbour heights - Form 5.pdf20 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_June 2019 - Harbour Heights.pdf20 Aug 2019
OtherFile: Self Declaration for Directors.pdf7 Aug 2019
Certificates of CA (Form 5)File: Form 5 HH v1.pdf13 Dec 2018
Building plan approvalFile: 23.pdf2 Nov 2018
Layout approvalFile: Layout Sheet.pdf2 Nov 2018
Copy of Layout Approval (in case of layout)File: Layout Sheet.pdf2 Nov 2018
Building Plan Approval (IOD)File: 23.pdf2 Nov 2018
Certificates of CA (Form 5)File: Harbour Heights Radius Sumer Form 5.pdf11 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: HH Further CC.pdf14 May 2018
Details of encumbrancesFile: HH Encumbrace Letter November 2017.pdf15 Nov 2017
Layout approvalFile: (2017-07-06) AMENDED LAYOUT.pdf31 Jul 2017
Building plan approvalFile: IOD.pdf31 Jul 2017
Building plan approvalFile: (2017-07-06) AMENDED LAYOUT LETTER.pdf31 Jul 2017
PAN CardFile: RADIUS SUMMER DEVELOPERS PAN.pdf31 Jul 2017
PAN CardFile: 9 SBPL PAN Card.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: (2017-07-06) AMENDED LAYOUT.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Building Plan Approval (IOD)File: (2017-07-06) AMENDED LAYOUT LETTER.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: (2006-10-07) CC.pdf31 Jul 2017
Declaration in FORM BFile: Form B RSDPL 70.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Harbour Heights.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Harbour Height Form 2 38881.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 - HH - Pt 1.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 - HH - Pt 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 - HH - Pt 3.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 - HH - Pt 4.pdf31 Jul 2017
OtherFile: Self Decl Disclosure Partners Merged.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate (2).pdf30 Jul 2017
Details of encumbrancesFile: 5 RSDPL Self Dec Encumbrances.pdf30 Jul 2017
Proforma of Allotment letterFile: 7 Self Dec Not Upload AFS.pdf30 Jul 2017
OtherFile: 4B SBPL Declara on Directors.pdf30 Jul 2017

How this compares with Mumbai City

1717%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Harbour Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rey Road780+ in Mumbai City

2 kmHarbour HeightsCompleted 7Lapsed / revoked 24Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: SHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED

SHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED has 1 registration on MahaRERA, including Harbour Heights. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Harbour Heights is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Harbour Heights?

The registered promoter entity is SHREE NAMAN ESTATE PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2008PTC183644 and GSTIN 27AAMCS0876P1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Harbour Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Harbour Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Harbour Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Harbour Heights?

The professionals named in the filing: Architect: SSA Architects; Architect: Girish Chaudhari; Architect: Ashwin Parmar; Engineer: Buro Happold Engineers India Pvt Ltd; Engineer: Vinayak Mistry; Engineer: Dinkar Pimpale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Harbour Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Harbour Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Harbour Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.