RG-MH-23826 · RERA P52100009382 · Last updated on MahaRERA portal: 24 Dec 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 72 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Guruprasad is a Residential / Group Housing project by Ashok Ramesh Pashankar in Pune, Maharashtra, registered with MahaRERA as P52100009382 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 72 months from the original filing. 43 of the 70 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameGuruprasad
- TypeResidential / Group Housing
- Location
- HINJEWADI
- Hinjavadi (CT)
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100009382
- ReraGenie IDRG-MH-23826
Builder
- NameAshok Ramesh Pashankar
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2019)
- Buildings1 building record
- Documents filed74 files
Current status
Figures as on 24 Dec 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Guruprasad | NA | 8 | 7 | 70 | 0 | 70 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Guruprasad: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mahesh Laxman Kumbhar | Hinjavadi (CT) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aniruddhe T Shinde |
| Engineer | PRATIKK GUJAR |
| Chartered Accountant | MAHAVIR KOTHARI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Ashok Ramesh Pashankar | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterFinishing work pending and got delayed due to labour shortage on site.
Reason as filed by the promoterWe have obtained Part Completion Certificate for the project. we will get additional FSI as per Table No.6A of UDCPR 2020 which is made applicable by the Government of Maharashtra and we will be allowed to construct additional two floors in the building.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Dec 2024
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate Guruprasad.pdf | 24 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC GURUPRASAD MARCH 24 2_compressed.pdf | 4 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENG Certificate Guruprasad 31 3 24.pdf | 29 May 2024 |
| Certificates of CA (Form 3)File: GURUPRASAD Form 3 Scan March 24_compressed.pdf | 29 May 2024 |
| Layout approvalFile: S Plan Guruprasad (1).pdf | 28 May 2024 |
| Building plan approvalFile: S Plan 1-5 Guruprasad (1).pdf | 28 May 2024 |
| Building plan approvalFile: S Plan 6,7 Guruprasad (1).pdf | 28 May 2024 |
| Building plan approvalFile: S Plan Elevation Guruprasad (1).pdf | 28 May 2024 |
| Copy of Layout Approval (in case of layout)File: S Plan Guruprasad (1).pdf | 28 May 2024 |
| Building Plan Approval (IOD)File: S Plan 1-5 Guruprasad (1).pdf | 28 May 2024 |
| Building Plan Approval (IOD)File: S Plan 6,7 Guruprasad (1).pdf | 28 May 2024 |
| Building Plan Approval (IOD)File: S Plan Elevation Guruprasad (1).pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: GURUPRASAD SOLD UNSOLD MARCH 2024.pdf | 27 May 2024 |
| Declaration in FORM BFile: FORM B DECLARATION (1).pdf | 27 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked flats.pdf | 7 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Guruprasad20240306_16153731.pdf | 6 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Guruprasad120240306_16194525.pdf | 6 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Guruprasad220240306_16231594.pdf | 6 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE JUNE 2023.pdf | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE SEP 2023.pdf | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERTIFICATE DEC 2023.pdf | 27 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC GURUPRASAD JUNE 2023.pdf | 27 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC GURUPRASAD SEP 2023.pdf | 27 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC GURUPRASAD DEC 2023.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: GURUPRASAD FORM 3 JUNE 2023.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: GURUPRASAD FORM 3 SEP 2023.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: GURUPRASAD FORM 3 DEC 2023.pdf | 27 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2023.pdf | 25 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020.pdf | 25 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021.pdf | 25 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022.pdf | 25 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf | 25 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_2019_0001.pdf | 16 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_2020_0001.pdf | 16 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_2021_0001.pdf | 16 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_2022_0001.pdf | 16 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC_2023_0001.pdf | 16 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERC_2019_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERC_2020_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERC_2021_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERC_2022_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERC_2023_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: FORM3_2019_0001_compressed (1).pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: FORM3_2020_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: FORM3_2021_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: FORM3_2022_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: FORM3_2023_0001_compressed.pdf | 16 Dec 2023 |
| Certificates of CA (Form 5)File: FORM5_2019_0001.pdf | 16 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM5_2019_0001.pdf | 16 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5_2020_0001.pdf | 16 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM5_2021_0001.pdf | 16 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5_2022_0001.pdf | 16 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_2023_0001.pdf | 16 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED SANCTION GURUPRASAD.pdf | 15 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complitions P.pdf | 22 Sep 2022 |
| Certificates of CA (Form 5)File: Form 5.pdf | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate hinjawadi.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Chartered Accountant Certificate FORM 3.PDF | 31 Jul 2017 |
| Layout approvalFile: Drawing 1 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Building plan approvalFile: Drawing 1 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Building plan approvalFile: Drawing 2 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Building plan approvalFile: Drawing 3 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| PAN CardFile: Pashankar_sir_Pan.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: title search report .pdf | 30 Jul 2017 |
| Details of encumbrancesFile: encu Certificate.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Drawing 1 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: Drawing 1 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: Drawing 2 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: Drawing 3 PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER PRA NASR 70 2013 19 12 2014.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Declaration - RERA-Guruprsad .pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: Agreement-RERA-Guruprasad.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: Allotment letter - RERA.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep Guruprasad on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hinjavadi (CT)13,700+ in Pune
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Ashok Ramesh Pashankar
Ashok Ramesh Pashankar has 1 registration on MahaRERA, including Guruprasad. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Guruprasad is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Guruprasad?
The registered promoter entity is Ashok Ramesh Pashankar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Guruprasad?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Guruprasad?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Guruprasad?
The professionals named in the filing: Architect: Aniruddhe T Shinde; Engineer: PRATIKK GUJAR; Chartered Accountant: MAHAVIR KOTHARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Guruprasad?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback