ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Gurukripa

Registered No litigation declared Residential / Group Housing project

Gurukripa

By Inspira Realty and Infra Private Limited

RG-MH-61434 · RERA P51800047648 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
67 of 163Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Gurukripa is a Residential / Group Housing project by Inspira Realty and Infra Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047648 on 14 Nov 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 96 of the 163 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameGurukripa
  • TypeResidential / Group Housing
  • Location
    • Sindhi Society
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047648
  • ReraGenie IDRG-MH-61434

Builder

  • NameInspira Realty and Infra Private Limited
  • Entity typeCompany
  • CINU70109MH2023PTC396917
  • GSTIN27AAGCI9950G1Z7
  • DirectorsMadhusudan Bhagwandas Agrawal, Aayush Madhusudan Agrawal

Key dates

1 months past promisethis monthRegisteredNov 2022PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2022
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed123 files

Current status

59%96 of 163 units booked
97.3%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gurukripa Wing ANA181680080
Gurukripa Wing BNA10083083

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Gurukripa Wing A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Gurukripa Wing B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered35
BuildingClosed/CoveredTotal
Gurukripa Wing A2828
Gurukripa Wing B77

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,446 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Feb 2026
LandownerVillageDistrict
National PropertiesKurlaMumbai Suburban
The Sindhi Immigrants Co-operative Housing SocietyKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10216.75
Proposed, not sanctioned4,046 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMalad West ORLEM
Estimated costRs 71.81 cr
Cost incurredRs 69.88 cr
Work done97.31%
BuildingWingEstimatedIncurred
Gurukripa Wing ANARs 33.38 crRs 33.18 cr
Gurukripa Wing BNARs 33.38 crRs 33.28 cr
-NARs 5.05 crRs 3.42 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB H Wadhwa
EngineerMayur Badgujar
EngineerThornton Tomasetti
EngineerK H Motwani
Chartered AccountantR M A and Co LLP
Chartered AccountantRupal Motani
Chartered AccountantShashank Jain
PartnerRole in project
Inspira Realty and Infra Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: GK Form 1 march 2026 with OC recevied.pdf29 Apr 2026
Withdrawal Update Form 1File: GK Form 1 march 2026 with OC recevied.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 31032026 GK.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 31032026 GK.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 31032026 GK.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 31032026 GK.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 Declaration GK 31032026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 31032026 GK.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 31032026 GK.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A 31032026 InspiraOne.pdf17 Apr 2026
Form 1File: Form 1 Dec 2025 Archt Certificate Gurukripa.pdf20 Jan 2026
Form 2File: Form 2 Dec 2025 Eng Certificate Gurukripa.pdf20 Jan 2026
Form 3File: Form 3 Dec 2025 CA Certificate GK.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory Dec 2025 Gurukripa.pdf20 Jan 2026
Form 5 (FY 2023-2024)File: Gurukripa RERA Form 5 FY 2023 24.pdf14 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Gurukripa Standalon_sept 2025.pdf14 Nov 2025
Form 1File: Form 1_GK_sept2025.pdf17 Oct 2025
Form 2File: Form 2_GK_sept2025.pdf17 Oct 2025
Form 3File: GK Form 3 Sept 2025.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: GK sold unsold sept 2025.pdf17 Oct 2025
Form 1File: GK Form 1_June 2025.pdf18 Jul 2025
Form 2File: GK Form 2_June 2025.pdf18 Jul 2025
Form 3File: GK Form 3_June 2025 compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: GK Sold-Unsold Data-30-06-2025.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gurukripa Form3 Standalone_March 2025 Standalone.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK Form 3 March 2025 Consolidated.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GK Form 1 31032025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GK Form 2 31032025.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: GK SoldUnsold Data310325.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GK Form 2A 31032025.pdf14 Apr 2025
Building plan approvalFile: GK PLAN 20092024.pdf27 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: GK PLAN 20092024.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: GKoldUnsold Data 311224.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK Form 3 Dec 2024.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GK Dec 2024 Form 1.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gurukripa_Dec24 FORM 2.pdf16 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: GK Full CC A and B wings.pdf16 Dec 2024
Proforma of Agreement for saleFile: Draft Gurukripa AFS - revised - 08110204 - for RERA upload.pdf12 Nov 2024
Layout approvalFile: GK IOD 19th Floor Approved 05112024.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: GK IOD 19th Floor Approved 05112024.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Guru kripa form 3 sept 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE GK Sept 2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_GK_Sept 2024 form2.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: GK Sold Unsold Data Sept 2024.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: GK cc Dated 01102024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Gurukripa RERA Form 5 FY 2023 24.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: GK Sold Unsold Data.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK form 3 Consolidated June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK form 3 Standalone June 2024.pdf18 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Upto 16th Floor CC.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GK Form 1 - June 2024.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GK-Form 2 june 2024 eng cert.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GK Quality certificate.pdf28 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24_compressed.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate GK.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate GK.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: GK sold unsold - April 2024.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: GK - Sold Unsold 31122023.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: gkform3dec2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf17 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-2024.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31march 2023.pdf21 Dec 2023
Proforma of Allotment letterFile: GK Letter of Allotment- revised.pdf27 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Revalidation approval (1).pdf20 Nov 2023
Proforma of Agreement for saleFile: revised AFS GK-08112023.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GK 30092023_compressed.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Data GK_compressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GK Form 1.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GK Form 2 .pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SIGNED CERTIFICATE-INSPIRA (GURU KRIPA).pdf4 Oct 2023
Proforma of Agreement for saleFile: Gurukripa - revised Agreement For Sale- Updated - 21082023 (2).pdf24 Aug 2023
Proforma of Agreement for saleFile: Gurukripa - revised Agreement For Sale- Updated - 10082023.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gurukripa Form 3_compressed.pdf24 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GK RERA FORM 2_compressed.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: GK RERA Sold Unsold Inv_30323_compressed.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: GK RERA Sold Unsold Inv_30623_compressed.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK Form 3 - 24042023.pdf24 Apr 2023

How this compares with Mumbai Suburban

59%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gurukripa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

2 kmGurukripaCompleted 139Lapsed / revoked 95Other 131Dot size: filed unitsN

Filed coordinates, straight-line distance. 365 registered projects within 2 km.

Builder: Inspira Realty and Infra Private Limited

Inspira Realty and Infra Private Limited has 1 registration on MahaRERA, including Gurukripa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Gurukripa is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gurukripa?

The registered promoter entity is Inspira Realty and Infra Private Limited, a company as per the filing. Its CIN U70109MH2023PTC396917 and GSTIN 27AAGCI9950G1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gurukripa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gurukripa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gurukripa?

The professionals named in the filing: Architect: B H Wadhwa; Engineer: Mayur Badgujar; Engineer: Thornton Tomasetti; Engineer: K H Motwani; Chartered Accountant: R M A and Co LLP; Chartered Accountant: Rupal Motani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gurukripa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gurukripa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gurukripa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.