ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / GURU ASHISH

Completed No litigation declared Residential / Group Housing project

GURU ASHISH

By SHREE GURUKRUPA VENTURES LLP

RG-MH-19918 · RERA P51700006406 · Last updated on MahaRERA portal: 26 Aug 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

GURU ASHISH is a Residential / Group Housing project by SHREE GURUKRUPA VENTURES LLP in Thane, Maharashtra, registered with MahaRERA as P51700006406 on 14 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.

At a glance

Project

  • NameGURU ASHISH
  • TypeResidential / Group Housing
  • Location
    • Navi Mumbai (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006406
  • ReraGenie IDRG-MH-19918

Builder

  • NameSHREE GURUKRUPA VENTURES LLP
  • Entity typePartnership
  • PartnersSOHAN SINGH DHARAM SINGH PABLA, SATWINDER SINGH PABLA, INDER JEET SINGH PABLA, MAVJI GANESHA SARAIYA PATEL

Key dates

this monthRegisteredAug 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GURU ASHISHNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GURU ASHISH: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area550 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
MAVJI GANESHA SARAIYA PATELNavi Mumbai (M Corp.)Thane
SOHAN SINGH DHARAM SINGH PABLANavi Mumbai (M Corp.)Thane
INDER JEET SINGH PABLANavi Mumbai (M Corp.)Thane
DINESH KUMAR KRISHANGOPAL MEHTANavi Mumbai (M Corp.)Thane
SATWINDER SINGH PABLANavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI849.0
Proposed, not sanctioned849 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE CBD BELAPUR GALA NUMBER 43 AND 44 SECTOR 1 400614

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL MANUBHAI PATEL
PartnerRole in project
SHREE GURUKRUPA VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Aug 2023

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OcGuruAshish.pdf26 Aug 2023
Certificates of CA (Form 5)File: FORM 5 1MB.pdf8 Apr 2019
Certificates of Architect (Form 4)File: Form 4.pdf4 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE Sept18.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architet Certificate Dec 18.pdf2 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Sept18.pdf2 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 18.pdf2 Apr 2019
Certificates of CA (Form 3)File: Form 3 scanned SEP 1 MB SIZE.pdf2 Apr 2019
Certificates of CA (Form 3)File: Form 3 scanned DEC 1MB SIZE.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf3 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf3 Sep 2018
Certificates of CA (Form 3)File: SIGNED CA CERTIFICATE.pdf3 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate September 2017.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate September 2017.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate September 2017.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate December 2017.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificateGuru Ashish March 2018.pdf1 Sep 2018
Certificates of CA (Form 3)File: Rera certificate September 2017.pdf1 Sep 2018
Certificates of CA (Form 3)File: Rera certificate December 2017-1.pdf1 Sep 2018
Certificates of CA (Form 3)File: Rera certificate March 2018 (1).pdf1 Sep 2018
Certificates of CA (Form 5)File: Rera certificate September 2017.pdf1 Sep 2018
Certificates of CA (Form 5)File: abc.pdf1 Sep 2018
Certificates of CA (Form 5)File: abc.pdf1 Sep 2018
Certificates of CA (Form 5)File: ca certificate.pdf1 Sep 2018
Certificates of Architect (Form 4)File: Architect Certificate.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf20 Aug 2018
Layout approvalFile: MYSCAN_20170725_0002.pdf31 Jul 2017
Layout approvalFile: MYSCAN_20170725_0003.pdf31 Jul 2017
Building plan approvalFile: MYSCAN_20170725_0002.pdf31 Jul 2017
Building plan approvalFile: MYSCAN_20170725_0003.pdf31 Jul 2017
PAN CardFile: PAN SHREE GURUKRIPA.pdf31 Jul 2017
Copy of the legal title reportFile: SGV TITLE CRETIFICATE.pdf31 Jul 2017
Details of encumbrancesFile: DETAILS OF ENCUMBRANCE.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20170725_0002.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20170725_0003.pdf31 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170725_0002.pdf31 Jul 2017
Building Plan Approval (IOD)File: MYSCAN_20170725_0003.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: SGV CC COPY.pdf31 Jul 2017
Declaration in FORM BFile: RERA FORM B (1).pdf31 Jul 2017
Declaration in FORM BFile: BOARD RESOLUTION SIGNED.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Gurukrupa Ventures LLP (2).pdf31 Jul 2017
Certificates of CA (Form 3)File: SGV CA Certificate FINAL.pdf31 Jul 2017
Proforma of Allotment letterFile: LETTER OF ALLOTMENT FINAL.pdf31 Jul 2017
Proforma of Allotment letterFile: FINAL SALEC AGREEMENT 1.pdf31 Jul 2017
Certificates of Architect (Form 4)File: Architect certificate.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GURU ASHISH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Navi Mumbai (M Corp.)7,600+ in Thane

2 kmGURU ASHISHCompleted 75Lapsed / revoked 25Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: SHREE GURUKRUPA VENTURES LLP

SHREE GURUKRUPA VENTURES LLP has 1 registration on MahaRERA, including GURU ASHISH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GURU ASHISH is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURU ASHISH?

The registered promoter entity is SHREE GURUKRUPA VENTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURU ASHISH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GURU ASHISH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURU ASHISH?

The professionals named in the filing: Architect: ATUL MANUBHAI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURU ASHISH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURU ASHISH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURU ASHISH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.