Registered No litigation declared Residential / Group Housing project

GUNDECHA-KBK-MAGNUM PHASE I

By GundechaConstructionPvtLtd

RG-MH-76785 · RERA P51900034493 · Last updated on MahaRERA portal: 21 Jul 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
2Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

GUNDECHA-KBK-MAGNUM PHASE I is a Residential / Group Housing project by GundechaConstructionPvtLtd in Mumbai City, Maharashtra, registered with MahaRERA as P51900034493 on 11 Apr 2022. Possession is promised by 31 Mar 2027. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGUNDECHA-KBK-MAGNUM PHASE I
  • TypeResidential / Group Housing
  • Location
    • Dr S S Rao Road
    • Lalbaug
    • Mumbai City
    • 400012
  • Pincode400012
  • RERA no.P51900034493
  • ReraGenie IDRG-MH-76785

Builder

  • NameGundechaConstructionPvtLtd
  • Entity typeCompany
  • ChairpersonPARAS DEVRAJ GUNDECHA
  • Managing DirectorsDEEPAK PARAS GUNDECHA, POONAM PARAS GUNDECHA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Apr 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GUNDECHA KBK MAGNUM A WINGNA520000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

GUNDECHA KBK MAGNUM A WING: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,737 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAK Magnum Realty LLPMumbai CityMumbai City

Approvals and building plan

Permissible FSI22799.43
Proposed, not sanctioned22,799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSagar Avenue Ground Floor Andheri West Mumbai 400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACE Consultants
EngineerNitin M Patil
Chartered AccountantR G S & CO
PartnerRole in project
GundechaConstructionPvtLtd-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000344202Kanchan Vinod MurarkaRAK MAGNUM REALTY LLP03/02/2023
CC12501350Pratibha Mahendra ShahGundechaConstructionPvtLtd23/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate From 2.pdf21 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD FLATS.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAK Form 3.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GCPL FORM 3.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: A Wing Gundecha KBK Magnum Phase I.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 RAK comp.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GCPL comp.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Dec 2024
Other - LegalFile: Sold Booked Inventory.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Information of Sold Booked Inventory.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GCPL FORM 3.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAK Form 3.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf24 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate in Form1.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QUALITY ASSURANCE.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GCPL CA Certificate Form 3.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAK CA Certificate Form 3.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gundecha KBK Magnum Form 1.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gundecha KBK Magnum Form 2.pdf2 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Report.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RAK.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GCPL.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold and unsold inventory as on 30 sep 2023.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form1.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GCPL CA CERTIFICATE FORM 3.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAK CA CERTIFICATE FORM 3.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf1 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf1 Sep 2023
Disclosure of sold/ booked inventoryFile: GUNDECHA MAGNUM KBK HEIGHTS A wing.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 GCPL.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 RAK Part1.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 RAK Part2.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAK CA Certificate Form 3.pdf2 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf7 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert form1.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Form2.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert GCPL.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert RAK.pdf17 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Form1.pdf20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert Form2.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert GCPL.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert RAK MAGNUM.pdf20 Feb 2023
Details of encumbrancesFile: Declaration of Encumbrance.pdf6 Jan 2023
CERSAI detailsFile: CERSAI Hypothecation.pdf19 Dec 2022
CERSAI detailsFile: CERSAI Mortagage.pdf19 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert form1.pdf23 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Form2.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GCPL.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RAK Magnum.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Form1.pdf2 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Form2.pdf2 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert GCPL.pdf2 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert RAK.pdf2 Aug 2022
PAN CardFile: GCPL Pancard copy pdf.pdf17 Mar 2022
Layout approvalFile: Gundecha KBK Magnum LAYOUT PLAN.pdf4 Mar 2022
Building plan approvalFile: Gundecha KBK Magnum Building Plan 5.pdf4 Mar 2022
Copy of the legal title reportFile: Legal Title Report Format A.pdf4 Mar 2022
Copy of Layout Approval (in case of layout)File: Gundecha KBK Magnum LAYOUT PLAN.pdf4 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Gundecha KBK Magnum Building Plan 5.pdf4 Mar 2022
Details of encumbrancesFile: No Encumbrance Declaration Gundecha.pdf3 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Mar 2022
Declaration about Commencement CertificateFile: Commence certificate declaration.pdf3 Mar 2022
Declaration in FORM BFile: FORM B Declaration Gundecha.pdf3 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Cert.pdf3 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Cert.pdf3 Mar 2022
CERSAI detailsFile: Undertaking Cum Decleration for CERSAL.pdf3 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA Cert Gundecha.pdf3 Mar 2022
Proforma of Allotment letterFile: Magnum Sale Agreement Draft Part1.pdf3 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ZenithPK Road Near Kalidas Auditorium Mulund West Mumbai 400080244CompletedJun 2016Late, Nov 2016

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GUNDECHA-KBK-MAGNUM PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lalbaug780+ in Mumbai City

Builder: GundechaConstructionPvtLtd

GundechaConstructionPvtLtd has 2 registrations on MahaRERA, including Gundecha Woods Phase 1 and GUNDECHA-KBK-MAGNUM PHASE I. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if GUNDECHA-KBK-MAGNUM PHASE I is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GUNDECHA-KBK-MAGNUM PHASE I?

The registered promoter entity is GundechaConstructionPvtLtd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GUNDECHA-KBK-MAGNUM PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GUNDECHA-KBK-MAGNUM PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GUNDECHA-KBK-MAGNUM PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GUNDECHA-KBK-MAGNUM PHASE I?

The professionals named in the filing: Architect: ACE Consultants; Engineer: Nitin M Patil; Chartered Accountant: R G S & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GUNDECHA-KBK-MAGNUM PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GUNDECHA-KBK-MAGNUM PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GUNDECHA-KBK-MAGNUM PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.