Home / Browse projects / Ruparel NOVA
Ruparel NOVA
By SHREE SUKHAKARTA DEVELOPERS PVT.LTD.
RG-MH-99811 · RERA P51900019946 · Last updated on MahaRERA portal: 29 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 18 complaints at MahaRERA
- Rs 350.00 crore secured on the land, in favour of LIC HOUSING FINANCE LIMITED
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ruparel NOVA is a Residential / Group Housing project by SHREE SUKHAKARTA DEVELOPERS PVT.LTD. in Mumbai City, 400012, registered with MahaRERA as P51900019946 on 15 Mar 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 160 of the 165 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 18 complaints are on record with the regulator.
At a glance
Project
- NameRuparel NOVA
- TypeResidential / Group Housing
- Location
- Jerabai Wadia Road
- Mumbai City
- 400012
- Pincode400012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900019946
- ReraGenie IDRG-MH-99811
Builder
- NameSHREE SUKHAKARTA DEVELOPERS PVT.LTD.
- Entity typeCompany
- CINU45200MH2013PTC245154
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsAmit Ruparel, Parikshit Sharma, Pradeep Ahire
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Mar 2019
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed34 files
Current status
Figures as on 29 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ruparel Nova | NA | 42 | 42 | 165 | 0 | 165 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
Ruparel Nova: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 29 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed78
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Ruparel Nova | NA | Rs 123.17 cr | Rs 112.95 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Rahul Kamathi Kamathi |
| Architect | AR Rahul Kamathi |
| Engineer | Ajay Pandurang Gade |
| Engineer | Sanjeev Sinha |
| Chartered Accountant | Shereena Jacob |
| Chartered Accountant | Sarveshwar Sharma |
| Partner | Role in project |
|---|---|
| Shree Siddhivinayak Classic Construction pvt Ltd | - |
Complaints filed with MahaRERA18
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397620 | Kanagasabapathy Sundaram Pillai | RUPAREL NOVA Through Shree Sukhakarta Developers Pvt. Ltd. | 03/10/2023 |
| CC12500314 | Munira Hakim Arsiwala | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 29/01/2025 |
| CC12500774 | Gopal Nagarsekar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 07/03/2025 |
| CC12500775 | Gopal Nagarsekar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 07/03/2025 |
| CC12500807 | PRAVIN BALKRISHNA KANSE | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 09/03/2025 |
| CC12501083 | Rohit Vijay Kapdi | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 01/04/2025 |
| CC12501305 | Deepak Bhagat | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 20/04/2025 |
| CC12602772 | Rohit Vijay Kapdi | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 12/05/2026 |
| CC12503006 | Keki Jalejer Unwalla | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 26/08/2025 |
| CC12503024 | Keki Jalejer Unwalla | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 27/08/2025 |
| CC12503044 | Durgesh Durgaram Rajadhyaksha | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 29/08/2025 |
| CC12503403 | Jayesh Mallhari Mahindrakar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 23/09/2025 |
| CC12503604 | Rohit Vijay Kapdi | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 10/10/2025 |
| CC12600655 | Deepak Bhagat | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 04/02/2026 |
| CC12600880 | MEERA FATEHCHAND KHEMANI | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 17/02/2026 |
| CC12601007 | MEERA FATEHCHAND KHEMANI | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 24/02/2026 |
| CC12601574 | PRAVIN BALKRISHNA KANSE | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 21/03/2026 |
| CC12604085 | Jagamalaram T Patel | Shree Siddhivinayak Classic Construction pvt Ltd | 30/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Feb 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed34
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Ruparel NOVA 31122025.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Ruparel Nova 31122025.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Ruparel Nova 31122025.pdf | 29 Jan 2026 |
| Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf | 29 Jan 2026 |
| Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 29 Jan 2026 |
| Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 29 Jan 2026 |
| Form 5 (FY 2022-2023)File: FORM 5 Ruparel Nova FY 22-23.pdf | 29 Jan 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 Ruparel Nova FY 23-24.pdf | 29 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 Ruparel Nova FY 24-25.pdf | 29 Jan 2026 |
| Form 5 (FY 2018-2019)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf | 16 Jan 2026 |
| CERSAI detailsFile: CERSAI REPORT RUPAREL NOVA.pdf | 4 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nova March-2021.pdf | 1 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Nova March-2022.pdf | 1 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Nova 2019-20.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nova 2020-21.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nova 2021-22.pdf | 24 Jan 2023 |
| Proforma of Allotment letterFile: Nova.pdf | 2 Aug 2021 |
| Building plan approvalFile: Nova-IOA.pdf | 16 Jul 2021 |
| Building Plan Approval (IOD)File: Nova-IOA.pdf | 16 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Nova CC.pdf | 29 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: rera certificate - ruparel nova.pdf | 24 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Nova.pdf | 2 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: NOVA CC 7th Floor.pdf | 2 Dec 2019 |
| Certificates of CA (Form 3)File: Form-3 Ca Certificate Nova.pdf | 11 Mar 2019 |
| Declaration in FORM BFile: Form-B Nova New.pdf | 9 Mar 2019 |
| Copy of the legal title reportFile: Title Certificate-NOVA.pdf | 19 Feb 2019 |
| Proforma of Allotment letterFile: RERA Agreement - Ruparel NOVA -Final.pdf | 19 Feb 2019 |
| Building plan approvalFile: IOD Plan.pdf | 16 Feb 2019 |
| Layout approvalFile: Layout Plan.pdf | 16 Feb 2019 |
| PAN CardFile: Pan Card.pdf | 16 Feb 2019 |
| Details of encumbrancesFile: No Encumberance Certificate.pdf | 16 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 16 Feb 2019 |
| Building Plan Approval (IOD)File: IOD Plan.pdf | 16 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 16 Feb 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 34 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ruparel NOVA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mumbai City
SATTVA SUMERA
ALPERTON DEVELOPERS AND CONTRACTORS PRIVAT
THE EDGE
TEJUKAYA CORP PRIVATE LIMITED
THE PINNACLE
RATNARAJ BLESSING MILESTONE LLP
Ruparel Millennia
Renuka Realtors
Ruparel Jewel
Renuka Realtors
AAYESHA PALACE
ZOEB ENTERPRISES
Builder: SHREE SUKHAKARTA DEVELOPERS PVT.LTD.
SHREE SUKHAKARTA DEVELOPERS PVT.LTD. has 3 registrations on MahaRERA, including Ruparel Ariana and Ruparel Elavia. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What does it mean that Ruparel NOVA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Ruparel NOVA is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ruparel NOVA?
The registered promoter entity is SHREE SUKHAKARTA DEVELOPERS PVT.LTD., a company as per the filing. Its CIN U45200MH2013PTC245154 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ruparel NOVA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ruparel NOVA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ruparel NOVA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ruparel NOVA?
The professionals named in the filing: Architect: Mr Rahul Kamathi Kamathi; Architect: AR Rahul Kamathi; Engineer: Ajay Pandurang Gade; Engineer: Sanjeev Sinha; Chartered Accountant: Shereena Jacob; Chartered Accountant: Sarveshwar Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ruparel NOVA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback