Home / Browse projects / THE EDGE

Registered Litigation declared Others project

THE EDGE

By TEJUKAYA CORP PRIVATE LIMITED

RG-MH-94666 · RERA P51900032613 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2030Possession promisedmoved 24 months from the original
1 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 65%
210 of 379Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 200 documents Report an error

THE EDGE is a Others project by TEJUKAYA CORP PRIVATE LIMITED in LALBAUG - MUMBAI, 400012, registered with MahaRERA as P51900032613 on 14 Jan 2022. Possession is promised by 31 Dec 2030. The completion date has moved by 24 months from the original filing. 169 of the 379 units on this registration are recorded sold or booked, and 1 of 33 construction stages are filed complete.

At a glance

Project

  • NameTHE EDGE
  • TypeOthers
  • Location
    • TEJUKAYA MANSION
    • DR.B.A.ROAD
    • OPPOSITE GANESH GULLY
    • LALBAUG
    • MUMBAI-400012
    • LALBAUG - MUMBAI
    • 400012
  • Pincode400012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900032613
  • ReraGenie IDRG-MH-94666

Builder

  • NameTEJUKAYA CORP PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsPRANAV PRAMOD TEJOOKAYA, MANENDRA JANAK KUMAR

Key dates

this monthRegisteredJan 2022First promiseDec 2028Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jan 2022
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Dec 2028)
  • Buildings3 building records
  • Documents filed200 files

Current status

45%169 of 379 units booked
15.9%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA55402280228
TOWER 2NA55421350135
REHAB SALE WINGNA2201616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 65%.

TOWER 14%
ActivityProgress
Excavation40%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
REHAB SALE WING21%
ActivityProgress
Excavation100%
Basement (if any)65%
Podiums (if any)0%
Plinth65%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed985

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots985
Closed/Covered985
BuildingClosed/CoveredTotal
TOWER 1492492
TOWER 2493493

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,055 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Aug 2025
LandownerVillageDistrict
SHRI KANTILAL KHIMJI TEJOOKAYAMumbai CityMumbai City
PRAMODKUMAR KHIMJI HUFMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI97577.52
Proposed, not sanctioned48,892 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Industry House, HT Parekh Marg Churchgate Mumbai - 400020
Estimated costRs 1,113.00 cr
Cost incurredRs 177.50 cr
Work done15.95%
BuildingWingEstimatedIncurred
TOWER 1NARs 428.00 crRs 50.81 cr
TOWER 2NARs 428.00 crRs 50.81 cr
REHAB SALE WINGNARs 257.00 crRs 75.88 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectREDKAR & REDKAR ARCHITECTS & PLANNERS
EngineerPRASAD MULAYAMPILLY
Chartered AccountantMLR AND ASSOCIATES LLP
Chartered AccountantG.M. KAPADIA & CO.
Chartered AccountantHARSHAL CHHADVA
PartnerRole in project
TEJUKAYA CORP PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900024247Dec 2028 → Dec 2030

Reason as filed by the promoterThe project has been transferred under section 15. Therefore, the intending promoter will complete the project latest by 31.12.2030

Litigation declared6

CaseCourtStatus
SC Suit no 1781/2018/2018CITY CIVIL COURTIt is an internal family dispute and we are just the developer in the property and also the matter w
Notice of motion 103600/2018/2018CITY CIVIL COURTIt is an internal family dispute and we have been served just a notice
SUIT NO 144/2011/2011SMALL CAUSES COURTit is an internal family dispute between the parties and we are just the developers of the property
RAD SUIT NO 505 OF 2020/2020SMALL CAUSES COURTit is an internal family dispute between the parties and we are just the developers of the property
SUIT NO 10060 OF 2021/2021CITY CIVIL COURTwe have submitted that we Tejukaya Corp is the developer
SC SUIT NO 1781/2018/2018CITY CIVIL COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed200

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 200 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Building Layout Plan - Part 1.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 2.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 3.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 4.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 5.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 6.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 7.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 8.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 10.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 11.pdf13 Jun 2026
Building plan approvalFile: Building Layout Plan - Part 9.pdf13 Jun 2026
Building plan approvalFile: Highlited Plan with parking and units and FSI.pdf13 Jun 2026
Building plan approvalFile: THE EDGE PLAN.pdf8 Jun 2026
Building plan approvalFile: Building Plan Pg 12 and 14.pdf18 May 2026
Building plan approvalFile: Building Plan.pdf15 May 2026
Withdrawal Update Form 1File: Form 1.pdf15 May 2026
Withdrawal Update Form 2File: Form 2.pdf15 May 2026
Withdrawal Update Form 3File: Form 3.pdf15 May 2026
Withdrawal Update Form 1File: Form 1.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf29 Apr 2026
Building plan approvalFile: Building Plan 1.pdf16 Mar 2026
Building plan approvalFile: Building Plan 2.pdf16 Mar 2026
Building plan approvalFile: Building Plan 3.pdf16 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf28 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf21 Nov 2025
Form 1File: FORM 1.pdf21 Jul 2025
Form 2File: FORM 2.pdf21 Jul 2025
Form 3File: FORM 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf21 Jul 2025
Layout approvalFile: Amended IOD Drawigs 1.pdf22 May 2025
Building plan approvalFile: Amended IOD - Sale.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 3.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 4.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 5.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 6.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 7.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 8.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 9.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale -1.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 2.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 3.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 4.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 5.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 6.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 7.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 8.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 9.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 10.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 11.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 12.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 13.pdf22 May 2025
Building plan approvalFile: Amended IOD Drawigs 2- Sale - 14.pdf22 May 2025
Copy of Layout Approval (in case of layout)File: Amended IOD Drawigs 1.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 3.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 14.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 13.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 12.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 11.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 10.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 9.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 8.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 7.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 6.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 5.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 4.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale - 2.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 2- Sale -1.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 9.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 8.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 7.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 6.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 5.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 4.pdf22 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD Drawigs 3.pdf22 May 2025

Keep THE EDGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LALBAUG - MUMBAI

2 kmTHE EDGECompleted 28Lapsed / revoked 12Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: TEJUKAYA CORP PRIVATE LIMITED

TEJUKAYA CORP PRIVATE LIMITED has 1 registration on MahaRERA, including THE EDGE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if THE EDGE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE EDGE?

The registered promoter entity is TEJUKAYA CORP PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE EDGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE EDGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE EDGE?

The professionals named in the filing: Architect: REDKAR & REDKAR ARCHITECTS & PLANNERS; Engineer: PRASAD MULAYAMPILLY; Chartered Accountant: MLR AND ASSOCIATES LLP; Chartered Accountant: G.M. KAPADIA & CO.; Chartered Accountant: HARSHAL CHHADVA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE EDGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE EDGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE EDGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.