Home / Browse projects / Pune, Maharashtra / GREEN VILLA

Registered No litigation declared Residential / Group Housing project

GREEN VILLA

By SHUBHASHREE ASSOCIATES

RG-MH-51177 · RERA P52100047120 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 20.00 crore secured on the land, in favour of Aditya Birla Capital Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
44 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 90%
48 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

GREEN VILLA is a Residential / Group Housing project by SHUBHASHREE ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100047120 on 10 Oct 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 31 of the 79 units on this registration are recorded sold or booked, and 44 of 77 construction stages are filed complete.

At a glance

Project

  • NameGREEN VILLA
  • TypeResidential / Group Housing
  • Location
    • 306
    • NEAR TERRA GREEN SOCIETY
    • SANGAVADE
    • Mawal
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100047120
  • ReraGenie IDRG-MH-51177

Builder

  • NameSHUBHASHREE ASSOCIATES
  • Entity typePartnership
  • PartnersRUPESH DADABHAU GUND, BABASAHEB LAXMAN AUTI

Key dates

this monthRegisteredOct 2022First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings7 building records
  • Documents filed151 files

Current status

39%31 of 79 units booked
38.9%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA7740040
ANA22606
BNA20808
CNA20808
DNA20505
ENA20606
FNA20606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 90%.

A123%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed165

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots165
Closed/Covered165
BuildingClosed/CoveredTotal
A17171
A1414
B1919
C1919
D1313
E1717
F1212

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Ltd
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on2 May 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI16444.65
Proposed, not sanctioned8,006 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, MEZZANINE FLOOR, SHOP NO. 9, 25, & 101, VADHAMAAN MOONSTONE, S NO. 99
Estimated costRs 40.00 cr
Cost incurredRs 15.58 cr
Work done38.94%
BuildingWingEstimatedIncurred
A1NARs 21.95 crRs 4.20 cr
ENARs 2.85 crRs 1.59 cr
FNARs 2.85 crRs 1.52 cr
BNARs 2.76 crRs 1.99 cr
CNARs 2.76 crRs 1.84 cr
ANARs 2.59 crRs 2.31 cr
DNARs 2.55 crRs 1.62 cr
-NARs 1.69 crRs 50.40 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUSHANT KUMBHAR AND ASSO
EngineerPravin Tarate
Chartered AccountantGANESH DNYANESHWAR DEVKAR
Chartered AccountantHARSHAL LAHOTI
Chartered AccountantSNEHAL PRAKASH GAIKWAD
PartnerRole in project
SHUBHASHREE ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025001Dec 2024 → Dec 2026

Reason as filed by the promoter1. Revised Sanction by PMRDA: In April, 2023, PMRDA issued a revised sanction for our project, necessitating modifications to the previously approved plans. The revision resulted in significant delays as the project required compliance with new requirements, preparation of revised drawings, and submission for approval. 2. Impact of Revised UDCPR Guidelines: With the implementation of the Unified Development Control and Promotion Regulations (UDCPR), we foresee adjustments in the project’s future plans to align with the new regulations These regulatory changes require a comprehensive review and

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Arch certificate 2.pdf5 May 2026
Form 2File: Dec 24 FORM 2.pdf5 May 2026
Form 3File: form 3.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf5 May 2026
Form 1File: Form 1 Arch certificate 2.pdf5 May 2026
Form 2File: Dec 24 FORM 2.pdf5 May 2026
Form 3File: form 3.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf5 May 2026
Withdrawal Update Form 1File: 30_06_2025.pdf2 May 2026
Withdrawal Update Form 1File: FORM 1.pdf2 May 2026
Withdrawal Update Form 1File: FORM 1.pdf2 May 2026
Withdrawal Update Form 1File: FORM 1.pdf2 May 2026
Withdrawal Update Form 2File: Form 2.pdf2 May 2026
Withdrawal Update Form 2File: sep25.pdf2 May 2026
Withdrawal Update Form 2File: dec25.pdf2 May 2026
Withdrawal Update Form 2File: dec25.pdf2 May 2026
Withdrawal Update Form 3File: Form 3.pdf2 May 2026
Withdrawal Update Form 3File: FORM 3.pdf2 May 2026
Withdrawal Update Form 3File: FORM 3.pdf2 May 2026
Withdrawal Update Form 3File: FORM 3.pdf2 May 2026
Form 1File: FORM -01 SEPT -23.pdf4 Feb 2026
Form 2File: FROM -02_compressed.pdf4 Feb 2026
Form 3File: FORM NO-3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf4 Feb 2026
Form 1File: FORM -01 DEC-23.pdf4 Feb 2026
Form 2File: FORM -02 DEC -23.pdf4 Feb 2026
Form 3File: FORM 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY..pdf4 Feb 2026
Form 1File: FROM -01 MAR -24 C.pdf4 Feb 2026
Form 2File: FORM -02 MAR -24.pdf4 Feb 2026
Form 3File: ilovepdf_merged (2).pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf4 Feb 2026
Form 1File: FORM-01 JUNE -24_compressed.pdf4 Feb 2026
Form 2File: FROM -02 JUNE -24_compressed.pdf4 Feb 2026
Form 3File: FORM 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf4 Feb 2026
Form 1File: FORM -01 SEPT -24.pdf4 Feb 2026
Form 2File: form2.pdf4 Feb 2026
Form 3File: FORM 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf4 Feb 2026
Form 1File: FORM-1.pdf3 Feb 2026
Form 2File: FORM -2.pdf3 Feb 2026
Form 3File: FORM 3.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY 30062023.pdf3 Feb 2026
Form 1File: FORM 1.pdf3 Feb 2026
Form 2File: FORM -2.pdf3 Feb 2026
Form 3File: Form 3.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf3 Feb 2026
Form 1File: FORM 1.pdf21 Jul 2025
Form 2File: FORM 2_compressed.pdf21 Jul 2025
Form 3File: FORM 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf21 Jul 2025
Declaration in FORM BFile: Form-B.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM -01 MAR -24_compressed (1).pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 JUNE -24_compressed.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -01 SEPT -24.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -03 30092023.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -03.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 31032023.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 30 sept 2024 NEW.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 30062024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 31032024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -02 31122023.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 30092023.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31122022_compressed.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A 23-24.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ANNUAL REPORT FORM -5.pdf9 Nov 2024
Declaration in FORM BFile: FORM B.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -01 30092023_compressed.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -01.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORIES 31082023.pdf14 Sep 2023

How this compares with Pune

39%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GREEN VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANGAVADE13,700+ in Pune

Builder: SHUBHASHREE ASSOCIATES

SHUBHASHREE ASSOCIATES has 1 registration on MahaRERA, including GREEN VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GREEN VILLA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GREEN VILLA?

The registered promoter entity is SHUBHASHREE ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GREEN VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GREEN VILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GREEN VILLA?

The professionals named in the filing: Architect: SUSHANT KUMBHAR AND ASSO; Engineer: Pravin Tarate; Chartered Accountant: GANESH DNYANESHWAR DEVKAR; Chartered Accountant: HARSHAL LAHOTI; Chartered Accountant: SNEHAL PRAKASH GAIKWAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN VILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.