ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / GREEN SPRINGS

Completed No litigation declared Residential / Group Housing project

GREEN SPRINGS

By VISION ASSOCIATES

RG-MH-10334 · RERA P52700001770 · Last updated on MahaRERA portal: 15 Aug 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

GREEN SPRINGS is a Residential / Group Housing project by VISION ASSOCIATES in Satara, Maharashtra, registered with MahaRERA as P52700001770 on 29 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameGREEN SPRINGS
  • TypeResidential / Group Housing
  • Location
    • Wai (Rural)
    • Wai
    • Satara
    • 412803
  • Pincode412803
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700001770
  • ReraGenie IDRG-MH-10334

Builder

  • NameVISION ASSOCIATES
  • Entity typePartnership
  • PartnersSUMAIYYA SHERALI SHAIKH, RESHMA PRADEEP JAIGUDE, SHAMALA RAHUL GONJARI
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJul 2017First promiseJun 2019Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GREEN SPRINGSNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GREEN SPRINGS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,815 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3378.14
Proposed, not sanctioned3,378 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPACHGANI ROAD, WAI

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADHURI ZITE
PartnerRole in project
VISION ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700005861Jun 2019 → Dec 2020

Reason as filed by the promoterApplication for completion certificate is made to the concern authority but the authority is requiring more time for the same.

EXT52700010800Jun 2019 → Dec 2023

Reason as filed by the promoterNON AVAILABILITY OF LABOUR AND CONSTRUCTION MATERIAL BECAUSE OF COVID 19 PANDEMIC

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Declaration Cert for Green Springs.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Green Spring.pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate of Green Springs.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer Certificate of Green Springs.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: sold Unsold - Green Springs.pdf15 Aug 2021
Certificates of CA (Form 3)File: Form 3 for Green Springs_compressed.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 for 2018-19.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 for 2019-2020.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 for 2020-21.pdf15 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Green Spring Form 4.pdf27 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Green Spring Form 4.pdf27 Nov 2020
Architect’s Certificate on Completion of Project (Form 4)File: Green Spring Form 4.pdf27 Nov 2020
OtherFile: Green Spring Form 4.pdf27 Nov 2020
Certificates of CA (Form 5)File: RERA Certificate 5(UT).pdf12 Oct 2018
Copy of the legal title reportFile: TITLE PDF.pdf23 Jul 2017
Copy of the legal title reportFile: TITLE 2.pdf23 Jul 2017
Declaration in FORM BFile: vision declaration.pdf23 Jul 2017
Declaration in FORM BFile: vision declaration 2.pdf23 Jul 2017
Certificates of CA (Form 3)File: CA NEW VISION.pdf23 Jul 2017
Certificates of CA (Form 3)File: NEW CA 1.pdf23 Jul 2017
Proforma of Allotment letterFile: Final for Scanning ALLOTMENT LETTER and agreement.pdf23 Jul 2017
Details of encumbrancesFile: Tarangahakhat.PDF22 Jul 2017
Details of encumbrancesFile: Tarangahakhat (2).PDF22 Jul 2017
Details of encumbrancesFile: Tarangahakhat (3).PDF22 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certi.pdf22 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE VISION.pdf22 Jul 2017
Layout approvalFile: Map.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: Map.pdf21 Jul 2017
Building plan approvalFile: Map.pdf20 Jul 2017
PAN CardFile: PANVision Asso.PDF20 Jul 2017
Building Plan Approval (IOD)File: Map.pdf20 Jul 2017

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 54 months
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep GREEN SPRINGS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wai (Rural)1,100+ in Satara

2 kmGREEN SPRINGSCompleted 4Lapsed / revoked 8Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: VISION ASSOCIATES

VISION ASSOCIATES has 2 registrations on MahaRERA, including OM HEIGHTS and GREEN SPRINGS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if GREEN SPRINGS is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GREEN SPRINGS?

The registered promoter entity is VISION ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GREEN SPRINGS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GREEN SPRINGS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GREEN SPRINGS?

The professionals named in the filing: Architect: MADHURI ZITE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN SPRINGS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN SPRINGS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN SPRINGS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.