ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / GOPALKRISHNA SANKUL

Registered No litigation declared Residential / Group Housing project

GOPALKRISHNA SANKUL

By MAAD CONSTRUCTION

RG-MH-30580 · RERA P99000031410 · Last updated on MahaRERA portal: 7 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 42 months from the original
35 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 80%
24 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

GOPALKRISHNA SANKUL is a Residential / Group Housing project by MAAD CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000031410 on 23 Oct 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 42 months from the original filing. 0 of the 24 units on this registration are recorded sold or booked, and 35 of 55 construction stages are filed complete.

At a glance

Project

  • NameGOPALKRISHNA SANKUL
  • TypeResidential / Group Housing
  • Location
    • Juchandra
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000031410
  • ReraGenie IDRG-MH-30580

Builder

  • NameMAAD CONSTRUCTION
  • Entity typePartnership
  • PartnersYUVRAJ KINI, ASHALATA KINI, JITESH KINI, ABHIJIT KINI, HEMCHANDRA KINI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2021First promiseDec 2023Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2023)
  • Buildings5 building records
  • Documents filed49 files

Current status

0%0 of 24 units booked
64.0%Work done, per cost certificate

Figures as on 7 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA22606
B WINGNA33404
C WINGNA33404
E WINGNA33404
F WINGNA33606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 7 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

35 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 80%.

A WING81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E WING81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F WING81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed260

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots260
Closed/Covered260
BuildingClosed/CoveredTotal
A WING5252
B WING5252
C WING5252
E WING5252
F WING5252

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area683 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jan 2026
LandownerVillageDistrict
MANOHAR BALKRISHNA KINIVasai-Virar City (M Corp)Palghar
S N DEVELOPERSBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI21714.0
Proposed, not sanctioned21,714 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAIGAON EAST
Estimated costRs 4.84 cr
Cost incurredRs 3.10 cr
Work done64.0%
BuildingWingEstimatedIncurred
A WINGNARs 4.12 crRs 2.88 cr
-NARs 72.66 lakhRs 21.80 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON
EngineerEN CON
EngineerSEEMU CONSULTANCY
Chartered AccountantVANDIT SHAH & CO
Chartered AccountantASHWIN NAIR
PartnerRole in project
MAAD CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000024510Dec 2023 → Dec 2025

Reason as filed by the promoterDUE TO COVID AND PANDEMIC THE PROJECT COULD NOT BE COMPLETED ON TIME

EA07022619765Dec 2023 → Jun 2027

Reason as filed by the promoterDUE TO UNAVOIDABLE REASONS THE PROJECT CANNOT BE COMPLETED BEFORE TIME.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 dec 25.pdf7 Feb 2026
Withdrawal Update Form 1File: form 1 dec 25.pdf7 Feb 2026
Withdrawal Update Form 1File: form 1 dec 25.pdf7 Feb 2026
Withdrawal Update Form 2File: form 2 dec 25.pdf7 Feb 2026
Withdrawal Update Form 2File: form 2 dec 25.pdf7 Feb 2026
Withdrawal Update Form 2File: form 2 dec 25.pdf7 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 25.pdf7 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 25.pdf7 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 25.pdf7 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: MAAD-SOLD UNSOLD.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 jun 24.pdf6 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf6 Aug 2024
Declaration in FORM BFile: FORM B.pdf18 Oct 2021
Copy of the legal title reportFile: title report.pdf12 Oct 2021
Layout approvalFile: 1.pdf20 Sep 2021
Building plan approvalFile: 1.pdf20 Sep 2021
Copy of Layout Approval (in case of layout)File: 1.pdf20 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf20 Sep 2021
Declaration about Commencement CertificateFile: CC DECLARATION.pdf17 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf17 Sep 2021
Layout approvalFile: 13.pdf16 Sep 2021
Layout approvalFile: 8.pdf16 Sep 2021
Layout approvalFile: 10.pdf16 Sep 2021
Layout approvalFile: 11.pdf16 Sep 2021
Layout approvalFile: 12.pdf16 Sep 2021
Building plan approvalFile: 8.pdf16 Sep 2021
Building plan approvalFile: 10.pdf16 Sep 2021
Building plan approvalFile: 11.pdf16 Sep 2021
Building plan approvalFile: 12.pdf16 Sep 2021
Building plan approvalFile: 13.pdf16 Sep 2021
Details of encumbrancesFile: NO ENCUMBRANCE.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: 8.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: 10.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: 11.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: 12.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: 13.pdf16 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf16 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf16 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf16 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf16 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf16 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Building no 3 CC NEW.pdf6 Sep 2021
Proforma of Allotment letterFile: FLAT ALLOTMENT LETTER.pdf2 Sep 2021
PAN CardFile: MAAD CONSTRUCTION PAN.pdf28 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate (1).pdf28 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf28 Aug 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf28 Aug 2021

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 42 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOPALKRISHNA SANKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

Builder: MAAD CONSTRUCTION

MAAD CONSTRUCTION has 3 registrations on MahaRERA, including BALKRISHNA SANKUL and GOPALKRISHNA SANKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if GOPALKRISHNA SANKUL is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOPALKRISHNA SANKUL?

The registered promoter entity is MAAD CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOPALKRISHNA SANKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOPALKRISHNA SANKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOPALKRISHNA SANKUL?

The professionals named in the filing: Architect: EN CON; Engineer: EN CON; Engineer: SEEMU CONSULTANCY; Chartered Accountant: VANDIT SHAH & CO; Chartered Accountant: ASHWIN NAIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOPALKRISHNA SANKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOPALKRISHNA SANKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOPALKRISHNA SANKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.