Home / Browse projects / Pune, Maharashtra / GOLDEN COURT

Registered Litigation declared Commercial project

GOLDEN COURT

By Silverleaf landmarks llp

RG-MH-87844 · RERA P52100046952 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 24 months from the original
6 of 11Construction stages donefurthest along: Staircases, 95%
11 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

GOLDEN COURT is a Commercial project by Silverleaf landmarks llp in Pune, Maharashtra, registered with MahaRERA as P52100046952 on 26 Sep 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 24 months from the original filing. 54 of the 65 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameGOLDEN COURT
  • TypeCommercial
  • Location
    • MOHAMDWADI
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046952
  • ReraGenie IDRG-MH-87844

Builder

  • NameSilverleaf landmarks llp
  • Entity typeOthers
  • Named personsaditya gadiya, NIKHIL BALDOTA, AMIT DHADIWAL

Key dates

this monthRegisteredSep 2022First promiseJun 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed101 files

Current status

83%54 of 65 units booked
98.2%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
golden courtNA7406565

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

golden court: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,101 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Krystalline Constryctions LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10714.47
Proposed, not sanctioned9,290 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAXMI ARCADE B T KAWDE ROAD
Estimated costRs 26.00 cr
Cost incurredRs 25.54 cr
Work done98.23%
BuildingWingEstimatedIncurred
golden courtNARs 24.70 crRs 24.70 cr
-NARs 1.30 crRs 83.95 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGroup Consultants
EngineerS K Consultants & Engineers
EngineerSK Consultants & Engineers
EngineerSandeep Zhende
Chartered AccountantN B Sayed & Associates
Chartered AccountantR S Mutha & co.
PartnerRole in project
Silverleaf landmarks llp-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26022620015Jun 2025 → Jun 2027

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 30-06-2027. to complete the project and fulfil all regulatory requirements.

Litigation declared2

CaseCourtStatus
445/2019CIVIL COURT SENIOR DIVISION PUNEPENDING
445/2019CIVIL COURT SENIOR DIVISION PUNEOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Mar 2024

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Golden Court june 2026.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 - Golden Court June 2026.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 - Golden Court June 2026.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1 31-03-2026 Unsigned.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 Golden Court.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 Golden COurt.pdf12 Aug 2026
Form 5 (FY 2022-2023)File: Form 5 22-23 Signed.pdf26 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 23-24 Signed.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 30-09-2025.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 30-09-2025.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 30-09-2025.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 25 Signed.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 31-03-2026 Unsigned.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 - Golden Court as on Sep 2025.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 - Golden Court as on Sep 2025.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 - Golden Court as on Sep 2025.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25 Signed.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Golden Court.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 - Golden Court as on Sep 2025.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 - Golden Court as on Sep 2025.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 - Golden Court as on Sep 2025.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 Dec 25 Signed.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 Golden COurt.pdf25 Jun 2026
Form 5 (FY 2024-2025)File: Silverleaf Landmarks LLP Form 5_FY 2024-25.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 - Golden Court as on June 2025.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 - Golden Court as on June 2025.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 - Golden Court as on June 2025.pdf18 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Golden Court as on June 2023.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Golden Court as on Sep 2023.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Golden Court as on Dec 2023.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Golden Court as on March 2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Golden Court as on June 2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Golden Court as on Sep 2024.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Golden Court for FY 2023-24.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Golden Court as on December 2024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on December 2024.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: blank .pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf21 Feb 2025
Layout approvalFile: 1.pdf8 Jan 2025
Building plan approvalFile: 2.pdf8 Jan 2025
Building plan approvalFile: 3.pdf8 Jan 2025
Building plan approvalFile: 4.pdf8 Jan 2025
Copy of Layout Approval (in case of layout)File: 1.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf8 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 31st March 2023.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 30th June 2023.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 30th September 2023.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 31st December 2023.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 31st March 2024.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 30th June 2024.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Golden Court as on 30th September 2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on Sep 2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on June 2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on March 2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on Dec 2023.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on Sep 2023.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on June 2023.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Golden Court as on March 2023.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf26 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: null-6.pdf26 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion .pdf26 Mar 2024
Building plan approvalFile: 1.pdf14 Feb 2023
Building plan approvalFile: 2.pdf14 Feb 2023
Building plan approvalFile: 3.pdf14 Feb 2023
Building plan approvalFile: 4.pdf14 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf14 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf14 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf14 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf14 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca.pdf21 Sep 2022
Other - LegalFile: Annuxre A.pdf13 Sep 2022
Other - LegalFile: DRAFT AGREEMENT - AS PER RERA.pdf13 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details.pdf12 Sep 2022
CERSAI detailsFile: CERSAI.pdf9 Sep 2022
Layout approvalFile: 1-1 Layout.pdf5 Sep 2022

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOLDEN COURT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UNDRI13,700+ in Pune

2 kmGOLDEN COURTCompleted 83Lapsed / revoked 30Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 197 registered projects within 2 km.

Builder: Silverleaf landmarks llp

Silverleaf landmarks llp has 1 registration on MahaRERA, including GOLDEN COURT. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GOLDEN COURT is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN COURT?

The registered promoter entity is Silverleaf landmarks llp, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN COURT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN COURT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN COURT?

The professionals named in the filing: Architect: Group Consultants; Engineer: S K Consultants & Engineers; Engineer: SK Consultants & Engineers; Engineer: Sandeep Zhende; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: R S Mutha & co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN COURT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN COURT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN COURT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.