Home / Browse projects / Mumbai Suburban, Maharashtra / Godrej RKS

Completed No litigation declared Others project

Godrej RKS

By Godrej Projects Development Limited

RG-MH-22904 · RERA P51800023915 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
23 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 96%
17 of 149Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Godrej RKS is a Others project by Godrej Projects Development Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023915 on 14 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 132 of the 149 units on this registration are recorded sold or booked, and 23 of 33 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej RKS
  • TypeOthers
  • Location
    • VN Purav Marg
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800023915
  • ReraGenie IDRG-MH-22904

Builder

  • NameGodrej Projects Development Limited
  • Entity typeCompany
  • CINU70102MH2010PLC210227
  • GSTIN27AAECG0366L1ZG
  • Associate Vice President Region Head MMR TwoPriyamvada Navet
  • Other registrations5 more →
  • Completed5 of 6
  • Declared earlier projects16 →

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed81 files

Current status

89%132 of 149 units booked
91.5%Work done, per cost certificate

Figures as on 7 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA19050050
Wing BNA20038038
Wing CNA19053861

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 96%.

Wing A72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed344

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots344
Closed/Covered344
BuildingClosed/CoveredTotal
Wing A157157
Wing B5555
Wing C132132

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,795 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI23638.7
Proposed, not sanctioned23,639 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJeevan Prakash Building, Sir PM Road, Mumbai 400001
Estimated costRs 226.96 cr
Cost incurredRs 207.78 cr
Work done91.55%
BuildingWingEstimatedIncurred
Wing ANARs 96.43 crRs 90.79 cr
Wing CNARs 84.40 crRs 79.47 cr
Wing BNARs 29.59 crRs 27.86 cr
-NARs 16.54 crRs 9.66 cr

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Godrej Projects Development Limited-

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000198261Manish VoraniGodrej Project Development Limited06/09/2021
CC006000000397000ESHA SEHGALGodrej Projects Development Limited12/08/2023
CC006000000397056AVINASH KAURGodrej Projects Development Limited12/08/2023
CC006000000397055Hardik MajethiaGodrej Projects Development Limited12/08/2023
CC006000000397059Liyakat Ali KhanGODREJ PROJECTS DEVELOPMENT LIMITED12/08/2023
CC006000000500399SAURAV SANANGodrej Projects Development Limited08/05/2024
CC006000000500627ARTI ATIN KAMBLEGodrej Projects Development Limited30/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Dec 2023

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej RKS Form 5 FY 23 24.pdf7 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: RKS Form 4_Architect certificate_Phase 1_ OC Received.pdf29 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Letter 22122023.pdf28 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RK OC Approved Letter 16032022.pdf28 Dec 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: APPLICATION.pdf4 Dec 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: APPLICATION.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKS_RERA certificate Sep 2023.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RKS CHEMBUR_SEPT' 23-Final.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RKS Sept 23 Final.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final deliverable RKS.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final deliverable RKS_compressed.pdf27 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: RKS - Society Registration Certificate.pdf22 Aug 2023
Status of ConveyanceFile: Name Reservation Certificate RKS.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RK _ RERA_Jun 2023.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RKS CHEMBUR_JUNE' 23-Final.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RKS June 23.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 23 RKS.pdf18 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RKS CHEMBUR_MAR' 23-Final Engineer Certificate.pdf18 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE March 23 RKS.pdf18 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2366523_OC_signed.pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RKS CHEMBUR_DEC' 22-Final.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RKS Dec 22.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sep'22 RKS.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sep'22 RKS.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - RKS Sep'22.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Godrej_RKS_Form_5.pdf30 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June'22 - RK Project.pdf14 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_June'22 - RKS.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate_godrej_RKS_June-2022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Sales data - June'22 RKS FINAL.pdf7 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: RK- Further CC Wing B and C.pdf20 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mar'22 RKS.pdf20 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory_Mar'22_Part1.pdf20 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory_Mar'22_part2.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_Dec-21-Part1.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_Dec-21-Part2.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Mar-22_Godrej RKS_Part1.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Mar-22_Godrej RKS_Part2.pdf20 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate _Sep'21.pdf18 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Dec'21.pdf18 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Dec21 - RKS.pdf18 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Mar'22.pdf18 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Godrej RKS Form 2A RERA FY 2021-22 dtd 12-04-22.pdf18 Apr 2022
CERSAI detailsFile: CERSAI_For_Asset_Based_Search - RKS.pdf9 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory Details on Letter head_Godrej RKS Project.pdf9 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory Details_Godrej RKS.pdf9 Feb 2022
Declaration about Commencement CertificateFile: Declaration about CC_Godrej RKS Project.pdf12 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory Details_Godrej RKS Project.pdf12 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep'21.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Sep21.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - FY 2020-21.pdf29 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 21.pdf20 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate RERA June 21.pdf20 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q-1-Form 2A - Godrej RKS.pdf20 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar-21.pdf20 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RKS RERA Dec20.pdf21 Jan 2021
Building plan approvalFile: RK IOD-3 Plans v2-pages-1,3-compressed-2.pdf28 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: RK IOD-3 Plans v2-pages-1,3-compressed-2.pdf28 Dec 2020
Proforma of Allotment letterFile: Booking App Form.pdf2 Dec 2020
Proforma of Allotment letterFile: AFS Nov-20.pdf2 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RKS - Signed RERA form 5 - Mar 20.pdf30 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jun-20.pdf24 Jul 2020
OtherFile: Revised Amenities List.pdf23 Jan 2020
Layout approvalFile: Layout Approval - certified by Project Architect 090120 v1.pdf9 Jan 2020
Details of encumbrancesFile: Non Encumberance Certificate v2 080120.pdf9 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout Approval - certified by Project Architect 090120 v1.pdf9 Jan 2020
Declaration in FORM BFile: Form B v2.pdf9 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate v2 070120.pdf7 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 070120 v1.pdf7 Jan 2020
Proforma of Allotment letterFile: App Form.pdf7 Jan 2020
Proforma of Allotment letterFile: Allotment Letter.pdf7 Jan 2020
Proforma of Allotment letterFile: AFS.pdf7 Jan 2020
Building plan approvalFile: IOD approval letter dtd 18-12-2019.pdf6 Jan 2020
PAN CardFile: GPDPL New PAN Card.pdf6 Jan 2020
Copy of the legal title reportFile: Title Certificate.pdf6 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: IOD approval letter dtd 18-12-2019.pdf6 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: CC 030120.pdf6 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Jan 2020
OtherFile: RK Registered Deed of Conveyance for RERA (1).pdf6 Jan 2020

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Godrej SummitVillage Gurugram Sector 104 Gurugram1,177CompletedSep 2018Late, Dec 2018
Godrej BKCG Block Bandra Kurla Complex Bandra East Mumbai 40005130CompletedJun 2016May 2016
Godrej PlatinumInternational Airport Road Hebbal Bengaluru Karnataka 560024108CompletedMar 2016Late, Jan 2017
Godrej GenesisPlot No X1 9 10 13 and 14 Block EP and GP Sector V Saltlake Kolkata 700091125CompletedSep 2015Late, Dec 2015

How this compares with Mumbai Suburban

89%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej RKS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmGodrej RKSCompleted 98Lapsed / revoked 62Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 253 registered projects within 2 km.

Builder: Godrej Projects Development Limited

Godrej Projects Development Limited has 6 registrations on MahaRERA, including Godrej RKS and GODREJ COUNTRY ESTATE. Its filings disclose 16 earlier MahaRERA projects: declares 10 of 16 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Godrej RKS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej RKS?

The registered promoter entity is Godrej Projects Development Limited, a company as per the filing. Its CIN U70102MH2010PLC210227 and GSTIN 27AAECG0366L1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej RKS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej RKS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej RKS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Godrej RKS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej RKS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej RKS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.