Home / Browse projects / Mumbai Suburban, Maharashtra / Godrej Central

Completed No litigation declared Residential / Group Housing project

Godrej Central

By Godrej Landmark Redevelopers Private Limited

RG-MH-10780 · RERA P51800001107 · Last updated on MahaRERA portal: 21 Feb 2024

Source: official MahaRERA filing

Red flags

  • 12 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
200 of 220Construction stages doneacross 20 buildings; furthest along: Podiums (if any), 0%
12Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

Godrej Central is a Residential / Group Housing project by Godrej Landmark Redevelopers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001107 on 26 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2021. 12 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Central
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001107
  • ReraGenie IDRG-MH-10780

Builder

  • NameGodrej Landmark Redevelopers Private Limited
  • Entity typeCompany

Key dates

this monthRegisteredJul 2017PromisedMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion30 Mar 2021
  • Revised completionNone
  • Buildings20 building records
  • Documents filed124 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA190000
BNA190000
CNA190000
DNA190000
ENA190000
FNA190000
GNA190000
BUILDING NO 14 TOWER INA180000
PRIVE TOWER J BUILDING NO 39NA160000
HNA160000
LNA160000
MNA160000
NNA160000
ONA160000
PNA160000
QNA160000
RNA160000
MHADA BUILDING NO 2NA180000
MHADA BUILDING NO 23NA160000
MHADA BUILDING NO 37NA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 21 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

200 of 220 construction stages are filed complete across 20 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 14 TOWER I91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PRIVE TOWER J BUILDING NO 3991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
L91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
M91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
N91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
O91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
P91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Q91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
R91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MHADA BUILDING NO 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MHADA BUILDING NO 2391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MHADA BUILDING NO 3791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 21 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
CLUB HOUSEYes100%

Parking filed1107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,107
Closed/Covered1,044
Open Space63
BuildingClosed/CoveredOpen SpaceTotal
A85590
B1466152
C82587
D82688
E1016107
F70575
G1166122
BUILDING NO 14 TOWER I8311
PRIVE TOWER J BUILDING NO 39191433
H47047
L39039
M39039
N39039
O39039
P39039
Q39039
R35035
MHADA BUILDING NO 27310
MHADA BUILDING NO 23729
MHADA BUILDING NO 37527

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,542 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Shell Tower Co-operative Housing Society LimitedKurlaMumbai Suburban
M Patankar Buildcons Private LimitedKurlaMumbai Suburban
Kamla Landmarc Property Leasing and Finance Pvt LiAndheriMumbai Suburban

Approvals and building plan

Permissible FSI82698.04
Proposed, not sanctioned81,664 sq m
Buildings approved20
Buildings sanctioned20

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12 Mittal Tower, 1st Floor, A Wing, Nariman Point, Mumbai - 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architects & Consultants
ArchitectP G Patki Architects
EngineerM/S Raje Structural Consultants Private Limited
PartnerRole in project
Godrej Landmark Redevelopers Private Limited-

Litigation declared1

CaseCourtStatus
11078/2016High CourtNext hearing is on Nineteenth July Two Thousand Seventeen

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000043992Mrs. Renu MohtaGodrej Landmark Redevelopers Pvt Ltd04/04/2018
CC006000000043993Mrs. Meenakshi MohtaGodrej landmark Redevelopers Pvt Ltd04/04/2018
CC006000000054576SANJAY SHAMRAO HIREGODREJ LANDMARK REDEVELOPERS PVT. LTD.20/05/2018
CC006000000056998MRS. PRACHI SANDESH KOTWAL AND MR. SANDESH ANIL KOTWALGODREJ LANDMARK REDEVELOPERS PRIVATE LIMITED22/11/2018
CC006000000056249Anita CastellinoGodrej Landmark Redevelopers Pvt. Ltd.19/09/2018
CC006000000079338Kanchan Kanti ChandraGodrej Landmark Redevelopers Pvt. Ltd.20/05/2019
CC006000000089654Geetha NarayanGodrej Landmark Redevelopers Pvt Ltd09/06/2019
CC006000000192640Ruchi AgarwalGodrej Landmark Redevelopers Pvt Ltd16/02/2020
CC006000000192676Jayesh Ashok ShahGodrej Landmark Redevelopers Private Limited20/02/2020
CC006000000193732Anisha Bhandari and Seema BhandariGodrej Landmark Redevelopers Pvt Ltd15/08/2020
CC006000000193869Mrs Punam Nitin NikamGodrej Landmark Redevelopers Pvt Ltd29/08/2020
CC0060000001938811) Mrs Kala Tikle and 2) Ms Aditi Bhivandker alias Mrs Aditi MauryaGodrej Landmark Redevelopers Pvt Ltd01/09/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Feb 2024

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN1 Rehab Bldg 9 flats OC Issue Letter 18112019.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Rehab (252 Tenants) Part OC Letter Dated- 9th May 2018.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Wing H Full OC dtd 31-12-2018.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Bldg-2 full OC Certificate.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Bldg-23 full OC Certificate.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Bldg-37 full OC Certificate.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg No 14 OC Certificate 18112019.pdf21 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg No 39 OC Certificate 18112019.pdf21 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate A-G.PDF21 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate - H.PDF17 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Central Tower I - Society Registration Certificate.pdf17 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tower J Society Registration Certificate.PDF17 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A to G Full OC dtd 31-12-2018.pdf9 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ CENTRAL ENGINEER CERTIFICATE Nov 2019-compressed.pdf6 Apr 2022
Proforma of Allotment letterFile: Godrej Central updated AFS.pdf24 Nov 2021
Proforma of Allotment letterFile: Godrej Central updated AFS Rehab Sale flats.pdf24 Nov 2021
Building plan approvalFile: Bldg No39OCCertificate18112019.pdf16 Mar 2021
Building plan approvalFile: Bldg No14OCCertificate18112019.pdf16 Mar 2021
Building plan approvalFile: SN-1RehabBldg9flatsOCIssueLetter.pdf16 Mar 2021
Layout approvalFile: Bldg39OCPlan.pdf16 Mar 2021
Layout approvalFile: Bldg14OCPlan-compressed.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Bldg39OCPlan.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Bldg14OCPlan-compressed.pdf16 Mar 2021
Building Plan Approval (IOD)File: Bldg No39OCCertificate18112019.pdf16 Mar 2021
Building Plan Approval (IOD)File: Bldg No14OCCertificate18112019.pdf16 Mar 2021
Building Plan Approval (IOD)File: SN-1RehabBldg9flatsOCIssueLetter.pdf16 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Central Form 5 - Signed.pdf30 Sep 2020
Architect’s Certificate on Completion of Project (Form 4)File: FORM - 4 COMPLETION CERTIFICATE.PDF27 Jan 2020
Certificates of CA (Form 5)File: Form V - Central - Upload - 1.pdf30 Sep 2019
Layout approvalFile: SN-1 Rehab (252 Tenants) Part OC Plans Dated- 8th May 2018.pdf13 Jun 2019
Layout approvalFile: H TOWER-pages-1-compressed (1).pdf13 Jun 2019
Building plan approvalFile: SN-1 Rehab (252 Tenants) Part OC Letter Dated- 9th May 2018.pdf13 Jun 2019
Building plan approvalFile: SN-1 Sale Bldg Wing A to G Full OC dtd 31-12-2018.pdf13 Jun 2019
Building plan approvalFile: SN-1 Wing H Full OC dtd 31-12-2018.pdf13 Jun 2019
Copy of Layout Approval (in case of layout)File: H TOWER-pages-1-compressed (1).pdf13 Jun 2019
Copy of Layout Approval (in case of layout)File: SN-1 Rehab (252 Tenants) Part OC Plans Dated- 8th May 2018.pdf13 Jun 2019
Building Plan Approval (IOD)File: SN-1 Sale Bldg Wing A to G Full OC dtd 31-12-2018.pdf13 Jun 2019
Building Plan Approval (IOD)File: SN-1 Wing H Full OC dtd 31-12-2018.pdf13 Jun 2019
Building Plan Approval (IOD)File: SN-1 Rehab (252 Tenants) Part OC Letter Dated- 9th May 2018.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificates.pdf12 Jun 2019
Layout approvalFile: SN-1 Sale Bldg A-G full OC Plans_31-12-2018-1 Page 1_compressed.pdf11 Jun 2019
Copy of Layout Approval (in case of layout)File: SN-1 Sale Bldg A-G full OC Plans_31-12-2018-1 Page 1_compressed.pdf11 Jun 2019
Proforma of Allotment letterFile: Godrej Central AFS.pdf9 May 2019
Proforma of Allotment letterFile: RERA updated Allotment 28012019.pdf3 Feb 2019
Proforma of Allotment letterFile: Godrej Central updated AFS 04012019 rera.pdf3 Feb 2019
Proforma of Allotment letterFile: RERA updated Application 15012019 rera.pdf3 Feb 2019
Certificates of CA (Form 5)File: Central.pdf30 Sep 2018
Details of encumbrancesFile: Non-encumbrance Certificate.pdf8 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Central - RERA Engg Cert Dec 2017.pdf2 Feb 2018
Building plan approvalFile: Bldg no 14 Amended Plan Issue Letter.pdf26 Oct 2017
Building plan approvalFile: Bldg No 39 Amended Plan Issue Letter 17022017.pdf26 Oct 2017
Building Plan Approval (IOD)File: Bldg no 14 Amended Plan Issue Letter.pdf26 Oct 2017
Building Plan Approval (IOD)File: Bldg No 39 Amended Plan Issue Letter 17022017.pdf26 Oct 2017
Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-1-10.pdf18 Jul 2017
Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-11-21.pdf18 Jul 2017
Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-22-33.pdf18 Jul 2017
Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-34-44.pdf18 Jul 2017
Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-45-57.pdf18 Jul 2017
Copy of the legal title reportFile: Addendun to Title Certificate for SN1.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central CA cert part 1-compressed.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central CA cert part 2.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central-CA-cert-part-3.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central-CA-cert-part-4.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central-CA-cert-part-5.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central-CA-cert-part-6.pdf18 Jul 2017
Certificates of CA (Form 3)File: Central CA cert part 7.pdf18 Jul 2017
Layout approvalFile: Bldg No 2 Approved Plan 10022017.pdf14 Jul 2017
Layout approvalFile: Bldg No 14 Approved Plan 17062017 .pdf14 Jul 2017
Layout approvalFile: Bldg No 23 Amended plans 10022017.pdf14 Jul 2017
Layout approvalFile: Bldg No 37 Approved Plan 10022017.pdf14 Jul 2017
Layout approvalFile: Bldg No 39 Amended Plan 17062017.pdf14 Jul 2017
Layout approvalFile: Rehab Layout Amended plans dtd 19102016.pdf14 Jul 2017
Layout approvalFile: Sale Layout Amended plans dtd 19102016.pdf14 Jul 2017
Building plan approvalFile: Bldg No 14 Amended Plan Issue Letter 17062017.pdf14 Jul 2017
Building plan approvalFile: Bldg No 14 SALE IOD Letter 14012014.pdf14 Jul 2017
Building plan approvalFile: Bldg No 23 Amended Letter 10022017.pdf14 Jul 2017
Building plan approvalFile: Bldg No 23 IOD MHADA Letter 13012014.pdf14 Jul 2017
Building plan approvalFile: Bldg No 37 Amended Letter 10022017.pdf14 Jul 2017
Building plan approvalFile: Bldg No 37 MHADA IOD Letter 13012014.pdf14 Jul 2017
Building plan approvalFile: Bldg No 39 Amended Plan Issue Letter 17062017.pdf14 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Central on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmGodrej CentralCompleted 167Lapsed / revoked 146Other 190Dot size: filed unitsN

Filed coordinates, straight-line distance. 503 registered projects within 2 km.

Builder: Godrej Landmark Redevelopers Private Limited

Godrej Landmark Redevelopers Private Limited has 1 registration on MahaRERA, including Godrej Central. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Godrej Central is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Central?

The registered promoter entity is Godrej Landmark Redevelopers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Central?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Central?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Central?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Central?

The professionals named in the filing: Architect: Aakar Architects & Consultants; Architect: P G Patki Architects; Engineer: M/S Raje Structural Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Central?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Central. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Central to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.