Home / Browse projects / Mumbai Suburban, Maharashtra / Godrej Central
Godrej Central
By Godrej Landmark Redevelopers Private Limited
RG-MH-10780 · RERA P51800001107 · Last updated on MahaRERA portal: 21 Feb 2024
Source: official MahaRERA filing
Red flags
- 12 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Central is a Residential / Group Housing project by Godrej Landmark Redevelopers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001107 on 26 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2021. 12 complaints are on record with the regulator.
At a glance
Project
- NameGodrej Central
- TypeResidential / Group Housing
- Location
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800001107
- ReraGenie IDRG-MH-10780
Builder
- NameGodrej Landmark Redevelopers Private Limited
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Jul 2017
- Promised completion30 Mar 2021
- Revised completionNone
- Buildings20 building records
- Documents filed124 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 19 | 0 | 0 | 0 | 0 |
| B | NA | 19 | 0 | 0 | 0 | 0 |
| C | NA | 19 | 0 | 0 | 0 | 0 |
| D | NA | 19 | 0 | 0 | 0 | 0 |
| E | NA | 19 | 0 | 0 | 0 | 0 |
| F | NA | 19 | 0 | 0 | 0 | 0 |
| G | NA | 19 | 0 | 0 | 0 | 0 |
| BUILDING NO 14 TOWER I | NA | 18 | 0 | 0 | 0 | 0 |
| PRIVE TOWER J BUILDING NO 39 | NA | 16 | 0 | 0 | 0 | 0 |
| H | NA | 16 | 0 | 0 | 0 | 0 |
| L | NA | 16 | 0 | 0 | 0 | 0 |
| M | NA | 16 | 0 | 0 | 0 | 0 |
| N | NA | 16 | 0 | 0 | 0 | 0 |
| O | NA | 16 | 0 | 0 | 0 | 0 |
| P | NA | 16 | 0 | 0 | 0 | 0 |
| Q | NA | 16 | 0 | 0 | 0 | 0 |
| R | NA | 16 | 0 | 0 | 0 | 0 |
| MHADA BUILDING NO 2 | NA | 18 | 0 | 0 | 0 | 0 |
| MHADA BUILDING NO 23 | NA | 16 | 0 | 0 | 0 | 0 |
| MHADA BUILDING NO 37 | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 21 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
200 of 220 construction stages are filed complete across 20 buildings. The stage furthest along is Podiums (if any), at 0%.
A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 14 TOWER I91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PRIVE TOWER J BUILDING NO 3991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
H91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
M91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
N91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
O91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
P91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Q91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
R91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MHADA BUILDING NO 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MHADA BUILDING NO 2391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MHADA BUILDING NO 3791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 21 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
| CLUB HOUSE | Yes | 100% |
Parking filed1107
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A | 85 | 5 | 90 |
| B | 146 | 6 | 152 |
| C | 82 | 5 | 87 |
| D | 82 | 6 | 88 |
| E | 101 | 6 | 107 |
| F | 70 | 5 | 75 |
| G | 116 | 6 | 122 |
| BUILDING NO 14 TOWER I | 8 | 3 | 11 |
| PRIVE TOWER J BUILDING NO 39 | 19 | 14 | 33 |
| H | 47 | 0 | 47 |
| L | 39 | 0 | 39 |
| M | 39 | 0 | 39 |
| N | 39 | 0 | 39 |
| O | 39 | 0 | 39 |
| P | 39 | 0 | 39 |
| Q | 39 | 0 | 39 |
| R | 35 | 0 | 35 |
| MHADA BUILDING NO 2 | 7 | 3 | 10 |
| MHADA BUILDING NO 23 | 7 | 2 | 9 |
| MHADA BUILDING NO 37 | 5 | 2 | 7 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shell Tower Co-operative Housing Society Limited | Kurla | Mumbai Suburban |
| M Patankar Buildcons Private Limited | Kurla | Mumbai Suburban |
| Kamla Landmarc Property Leasing and Finance Pvt Li | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architects & Consultants |
| Architect | P G Patki Architects |
| Engineer | M/S Raje Structural Consultants Private Limited |
| Partner | Role in project |
|---|---|
| Godrej Landmark Redevelopers Private Limited | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 11078/2016 | High Court | Next hearing is on Nineteenth July Two Thousand Seventeen |
Complaints filed with MahaRERA12
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000043992 | Mrs. Renu Mohta | Godrej Landmark Redevelopers Pvt Ltd | 04/04/2018 |
| CC006000000043993 | Mrs. Meenakshi Mohta | Godrej landmark Redevelopers Pvt Ltd | 04/04/2018 |
| CC006000000054576 | SANJAY SHAMRAO HIRE | GODREJ LANDMARK REDEVELOPERS PVT. LTD. | 20/05/2018 |
| CC006000000056998 | MRS. PRACHI SANDESH KOTWAL AND MR. SANDESH ANIL KOTWAL | GODREJ LANDMARK REDEVELOPERS PRIVATE LIMITED | 22/11/2018 |
| CC006000000056249 | Anita Castellino | Godrej Landmark Redevelopers Pvt. Ltd. | 19/09/2018 |
| CC006000000079338 | Kanchan Kanti Chandra | Godrej Landmark Redevelopers Pvt. Ltd. | 20/05/2019 |
| CC006000000089654 | Geetha Narayan | Godrej Landmark Redevelopers Pvt Ltd | 09/06/2019 |
| CC006000000192640 | Ruchi Agarwal | Godrej Landmark Redevelopers Pvt Ltd | 16/02/2020 |
| CC006000000192676 | Jayesh Ashok Shah | Godrej Landmark Redevelopers Private Limited | 20/02/2020 |
| CC006000000193732 | Anisha Bhandari and Seema Bhandari | Godrej Landmark Redevelopers Pvt Ltd | 15/08/2020 |
| CC006000000193869 | Mrs Punam Nitin Nikam | Godrej Landmark Redevelopers Pvt Ltd | 29/08/2020 |
| CC006000000193881 | 1) Mrs Kala Tikle and 2) Ms Aditi Bhivandker alias Mrs Aditi Maurya | Godrej Landmark Redevelopers Pvt Ltd | 01/09/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Feb 2024
Documents filed124
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN1 Rehab Bldg 9 flats OC Issue Letter 18112019.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Rehab (252 Tenants) Part OC Letter Dated- 9th May 2018.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Wing H Full OC dtd 31-12-2018.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Bldg-2 full OC Certificate.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Bldg-23 full OC Certificate.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SN-1 Bldg-37 full OC Certificate.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg No 14 OC Certificate 18112019.pdf | 21 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg No 39 OC Certificate 18112019.pdf | 21 Feb 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate A-G.PDF | 21 Feb 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate - H.PDF | 17 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Central Tower I - Society Registration Certificate.pdf | 17 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Tower J Society Registration Certificate.PDF | 17 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A to G Full OC dtd 31-12-2018.pdf | 9 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ CENTRAL ENGINEER CERTIFICATE Nov 2019-compressed.pdf | 6 Apr 2022 |
| Proforma of Allotment letterFile: Godrej Central updated AFS.pdf | 24 Nov 2021 |
| Proforma of Allotment letterFile: Godrej Central updated AFS Rehab Sale flats.pdf | 24 Nov 2021 |
| Building plan approvalFile: Bldg No39OCCertificate18112019.pdf | 16 Mar 2021 |
| Building plan approvalFile: Bldg No14OCCertificate18112019.pdf | 16 Mar 2021 |
| Building plan approvalFile: SN-1RehabBldg9flatsOCIssueLetter.pdf | 16 Mar 2021 |
| Layout approvalFile: Bldg39OCPlan.pdf | 16 Mar 2021 |
| Layout approvalFile: Bldg14OCPlan-compressed.pdf | 16 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Bldg39OCPlan.pdf | 16 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Bldg14OCPlan-compressed.pdf | 16 Mar 2021 |
| Building Plan Approval (IOD)File: Bldg No39OCCertificate18112019.pdf | 16 Mar 2021 |
| Building Plan Approval (IOD)File: Bldg No14OCCertificate18112019.pdf | 16 Mar 2021 |
| Building Plan Approval (IOD)File: SN-1RehabBldg9flatsOCIssueLetter.pdf | 16 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Central Form 5 - Signed.pdf | 30 Sep 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM - 4 COMPLETION CERTIFICATE.PDF | 27 Jan 2020 |
| Certificates of CA (Form 5)File: Form V - Central - Upload - 1.pdf | 30 Sep 2019 |
| Layout approvalFile: SN-1 Rehab (252 Tenants) Part OC Plans Dated- 8th May 2018.pdf | 13 Jun 2019 |
| Layout approvalFile: H TOWER-pages-1-compressed (1).pdf | 13 Jun 2019 |
| Building plan approvalFile: SN-1 Rehab (252 Tenants) Part OC Letter Dated- 9th May 2018.pdf | 13 Jun 2019 |
| Building plan approvalFile: SN-1 Sale Bldg Wing A to G Full OC dtd 31-12-2018.pdf | 13 Jun 2019 |
| Building plan approvalFile: SN-1 Wing H Full OC dtd 31-12-2018.pdf | 13 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: H TOWER-pages-1-compressed (1).pdf | 13 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: SN-1 Rehab (252 Tenants) Part OC Plans Dated- 8th May 2018.pdf | 13 Jun 2019 |
| Building Plan Approval (IOD)File: SN-1 Sale Bldg Wing A to G Full OC dtd 31-12-2018.pdf | 13 Jun 2019 |
| Building Plan Approval (IOD)File: SN-1 Wing H Full OC dtd 31-12-2018.pdf | 13 Jun 2019 |
| Building Plan Approval (IOD)File: SN-1 Rehab (252 Tenants) Part OC Letter Dated- 9th May 2018.pdf | 13 Jun 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificates.pdf | 12 Jun 2019 |
| Layout approvalFile: SN-1 Sale Bldg A-G full OC Plans_31-12-2018-1 Page 1_compressed.pdf | 11 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: SN-1 Sale Bldg A-G full OC Plans_31-12-2018-1 Page 1_compressed.pdf | 11 Jun 2019 |
| Proforma of Allotment letterFile: Godrej Central AFS.pdf | 9 May 2019 |
| Proforma of Allotment letterFile: RERA updated Allotment 28012019.pdf | 3 Feb 2019 |
| Proforma of Allotment letterFile: Godrej Central updated AFS 04012019 rera.pdf | 3 Feb 2019 |
| Proforma of Allotment letterFile: RERA updated Application 15012019 rera.pdf | 3 Feb 2019 |
| Certificates of CA (Form 5)File: Central.pdf | 30 Sep 2018 |
| Details of encumbrancesFile: Non-encumbrance Certificate.pdf | 8 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Central - RERA Engg Cert Dec 2017.pdf | 2 Feb 2018 |
| Building plan approvalFile: Bldg no 14 Amended Plan Issue Letter.pdf | 26 Oct 2017 |
| Building plan approvalFile: Bldg No 39 Amended Plan Issue Letter 17022017.pdf | 26 Oct 2017 |
| Building Plan Approval (IOD)File: Bldg no 14 Amended Plan Issue Letter.pdf | 26 Oct 2017 |
| Building Plan Approval (IOD)File: Bldg No 39 Amended Plan Issue Letter 17022017.pdf | 26 Oct 2017 |
| Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-1-10.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-11-21.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-22-33.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-34-44.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: SN-1-updated-Title-Report-(21-Oct-2014)-45-57.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: Addendun to Title Certificate for SN1.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central CA cert part 1-compressed.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central CA cert part 2.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central-CA-cert-part-3.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central-CA-cert-part-4.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central-CA-cert-part-5.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central-CA-cert-part-6.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Central CA cert part 7.pdf | 18 Jul 2017 |
| Layout approvalFile: Bldg No 2 Approved Plan 10022017.pdf | 14 Jul 2017 |
| Layout approvalFile: Bldg No 14 Approved Plan 17062017 .pdf | 14 Jul 2017 |
| Layout approvalFile: Bldg No 23 Amended plans 10022017.pdf | 14 Jul 2017 |
| Layout approvalFile: Bldg No 37 Approved Plan 10022017.pdf | 14 Jul 2017 |
| Layout approvalFile: Bldg No 39 Amended Plan 17062017.pdf | 14 Jul 2017 |
| Layout approvalFile: Rehab Layout Amended plans dtd 19102016.pdf | 14 Jul 2017 |
| Layout approvalFile: Sale Layout Amended plans dtd 19102016.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 14 Amended Plan Issue Letter 17062017.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 14 SALE IOD Letter 14012014.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 23 Amended Letter 10022017.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 23 IOD MHADA Letter 13012014.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 37 Amended Letter 10022017.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 37 MHADA IOD Letter 13012014.pdf | 14 Jul 2017 |
| Building plan approvalFile: Bldg No 39 Amended Plan Issue Letter 17062017.pdf | 14 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 124 filed documents as one ZIP, foldered, with a manifest
Keep Godrej Central on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 503 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Godrej Landmark Redevelopers Private Limited
Godrej Landmark Redevelopers Private Limited has 1 registration on MahaRERA, including Godrej Central. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Godrej Central is delayed beyond 30 Mar 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Central?
The registered promoter entity is Godrej Landmark Redevelopers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Central?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Godrej Central?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Godrej Central?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Central?
The professionals named in the filing: Architect: Aakar Architects & Consultants; Architect: P G Patki Architects; Engineer: M/S Raje Structural Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Central?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback