Home / Browse projects / Pune, Maharashtra / GLORIOUS TATHASTU
GLORIOUS TATHASTU
RG-MH-54386 · RERA P52100054325 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 7 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GLORIOUS TATHASTU is a Residential / Group Housing project by GLORIOUS BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100054325 on 15 Jan 2024. The registration is recorded completed; possession was promised by 31 Jul 2026. The completion date has moved by 7 months from the original filing. 49 of the 56 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.
At a glance
Project
- NameGLORIOUS TATHASTU
- TypeResidential / Group Housing
- Location
- AUNDH RAVET BRT ROAD
- RAVET
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054325
- ReraGenie IDRG-MH-54386
Builder
- NameGLORIOUS BUILDCON
- Entity typePartnership
- GSTIN27AAZFG8135D1ZZ
- PartnersMAYUR VASANTLAL PATEL, KINJALKUMAR NANDLAL PATEL
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jan 2024
- Promised completion31 Jul 2026
- Revised completionRevised to 31 Jul 2026 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed120 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 9 | 7 | 28 | 0 | 28 |
| B WING | NA | 9 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed106
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 52 | 52 |
| B WING | 54 | 54 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 10.31 cr | Rs 8.07 cr |
| B WING | NA | Rs 10.31 cr | Rs 8.07 cr |
| - | NA | Rs 2.21 cr | Rs 1.03 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRECISION ARCHITECTS & PLANNER |
| Engineer | HRUSHIKESH RAJENDRA SONAVANE |
| Engineer | SARVASHIDDHANT STRUCTURAL ENGINEERING PVT LTD |
| Engineer | Narsing Tukaram Kamble |
| Chartered Accountant | BANKIM PATEL & ASSCOCIATES |
| Chartered Accountant | PRASANT PATEL |
| Partner | Role in project |
|---|---|
| Glorious Buildcon | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI respectfully request that my application for extension of the project validity up to 31/07/2026 be processed and approved. Although the Occupancy Certificate has already been received on 27/01/2026, the extension is required to complete the correction process on the MahaRERA portal prior to applying for project closure. Since the sanctioned built-up area mentioned in the initial registration differs from the revised approved plans, direct project closure cannot be sought. Further, a query has been raised by MahaRERA regarding the expiry of the project completion date. Accordingly, the extens
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Completion Certificate.pdf | 12 Jun 2026 |
| Layout approvalFile: PLAN 1 R3_compressed.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 1 R3_compressed.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 2 R3.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 3 R3.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 4 R3.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 5 R3.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 6 R3.pdf | 8 May 2026 |
| Building plan approvalFile: PLAN 7 R3.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Form 1_0001.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate_0001.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 _0001_compressed.pdf | 23 Apr 2026 |
| Layout approvalFile: Plan 01.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 01.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 02.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 03.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 04.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 05.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 06.pdf | 2 Mar 2026 |
| Building plan approvalFile: Plan 07.pdf | 2 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - 2023-2024.pdf | 16 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf | 16 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf | 16 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - June 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Sep 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - June 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Sep 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - June 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Sep 25_compressed.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 25.pdf | 30 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOARM 1 MARCH 2025.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOARM 2 MARCH 2025.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 ARCH 31122024.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTI 31122024 COM.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng 31122024.pdf | 15 Jan 2025 |
| Building plan approvalFile: 1 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: 2 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: 3 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: 4 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: 5 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: 6 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: 7 PLAN.pdf | 20 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 PLAN.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 PLAN.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 PLAN.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 PLAN.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 PLAN.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 PLAN.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 PLAN.pdf | 20 Dec 2024 |
| Building plan approvalFile: Plan 1.pdf | 16 Dec 2024 |
| Building plan approvalFile: Plan 2.pdf | 16 Dec 2024 |
| Building plan approvalFile: Plan 3.pdf | 16 Dec 2024 |
| Building plan approvalFile: Plan 4.pdf | 16 Dec 2024 |
| Building plan approvalFile: Plan 5.pdf | 16 Dec 2024 |
| Building plan approvalFile: Plan 6.pdf | 16 Dec 2024 |
| Building plan approvalFile: Plan 7.pdf | 16 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Plan 1.pdf | 16 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 16 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate form-1.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate From-3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate from-2.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-01 Architect Cretificate.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-02 Engineer Certificate.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 CA Certificate pdf.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: Parfoma Agreement Sales- Glorious Tathastu RERA.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_11zon.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 2 May 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Financial Glorious.pdf | 4 Jan 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| GLORIOUS CROWNP52100033429 | NEAR GANESH SHAMRAJYA, Pune | 32 | Feb 2022 | Completed | Jun 2024 | Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
Keep GLORIOUS TATHASTU on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAVET13,700+ in Pune
Filed coordinates, straight-line distance. 279 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: GLORIOUS BUILDCON
GLORIOUS BUILDCON has 1 registration on MahaRERA, including GLORIOUS TATHASTU. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GLORIOUS TATHASTU is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GLORIOUS TATHASTU?
The registered promoter entity is GLORIOUS BUILDCON, a partnership as per the filing. Its GSTIN 27AAZFG8135D1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GLORIOUS TATHASTU?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GLORIOUS TATHASTU?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GLORIOUS TATHASTU?
The professionals named in the filing: Architect: PRECISION ARCHITECTS & PLANNER; Engineer: HRUSHIKESH RAJENDRA SONAVANE; Engineer: SARVASHIDDHANT STRUCTURAL ENGINEERING PVT LTD; Engineer: Narsing Tukaram Kamble; Chartered Accountant: BANKIM PATEL & ASSCOCIATES; Chartered Accountant: PRASANT PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GLORIOUS TATHASTU?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback