GIRIVAN LA QUINTA

By Abhishek Mahesh Garodia

RG-MH-28439 · RERA P51800026169 · Last updated on MahaRERA portal: 19 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

GIRIVAN LA QUINTA is a Residential / Group Housing project by Abhishek Mahesh Garodia in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026169 on 25 Aug 2020. The registration is recorded completed; possession was promised by 30 Apr 2025.

At a glance

Project

  • NameGIRIVAN LA QUINTA
  • TypeResidential / Group Housing
  • Location
    • Plot no 1 and 2
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800026169
  • ReraGenie IDRG-MH-28439

Builder

  • NameAbhishek Mahesh Garodia
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2020PromisedApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2020
  • Promised completion30 Apr 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B wingNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

B wing: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 19 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable
Energy ManagementNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,315 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2992.96
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChember

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHemant Karani
EngineerGireesh Rajadhyaksha
EngineerHanamantaray Nandepagol
Chartered AccountantKetan Kataria and Associates
PartnerRole in project
Abhishek Mahesh Garodia-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 May 2023

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold Inventory-girivan la quinta.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch Certificate March 2023 Girivan La Quinta.pdf26 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate March 2023 Girivan La Quinta.pdf26 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 for March 2023-signed.pdf26 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 for March 2023-signed.pdf20 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form4_0001.pdf12 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2371205_OC_signed (1).pdf22 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5-signed copy.pdf11 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Girivan La Quinta Dec 2022.pdf6 Mar 2023
Disclosure of sold/ booked inventoryFile: Discl of sold Inventory Dec 2022.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Girivan La Quinta FY 2022-23 Q3 Final-signed.pdf20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert.pdf30 Jan 2023
Declaration about Commencement CertificateFile: Declaration About CC.pdf16 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng cert 0001.pdf2 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: _FurtherCC_signed.pdf1 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Girivan La Quinta FY 2022 23 Q2.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert.pdf5 Nov 2022
Disclosure of sold/ booked inventoryFile: sold inventory.pdf5 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Upload.pdf29 Aug 2022
Disclosure of sold/ booked inventoryFile: Disc;losure Sold booked inventory.pdf24 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Union Park for June 2022 Quarter end 12-08-2022 1830 signed Upload.pdf16 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert.pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: sold invent.pdf9 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Enginners Certificate uploaded.pdf3 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf1 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-compressed.pdf14 Mar 2022
Building plan approvalFile: Building Plan 1.pdf8 Mar 2022
Building plan approvalFile: Building Plan 2.pdf8 Mar 2022
Building plan approvalFile: Building Plan 3.pdf8 Mar 2022
Building plan approvalFile: Building Plan 4.pdf8 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf8 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf8 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf8 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf8 Mar 2022
Declaration about Commencement CertificateFile: Declaration.pdf4 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf19 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Girivan La Quinta CA Certificate (1).pdf11 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance (1).pdf3 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect Certificate Union Park.pdf2 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng crt.pdf2 Nov 2021
Disclosure of sold/ booked inventoryFile: Disclosur of sold inventories.pdf2 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - Certificate.pdf31 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (a).pdf17 Aug 2021
Details of encumbrancesFile: Cersai Letter.pdf16 Aug 2021
Declaration about Commencement CertificateFile: CC (2).pdf16 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arct Certificate (a).pdf16 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate (a).pdf16 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory Discloser.pdf16 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate march compressed.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate june compressed.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate june compressed.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: la quinta form 2A.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Girivan LA Quinta Form 1 1 (1).pdf10 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: girivan la form 2.pdf6 Aug 2021
Layout approvalFile: layout one.pdf30 Jul 2021
Layout approvalFile: layout 2.pdf30 Jul 2021
Layout approvalFile: layout page one.pdf30 Jul 2021
Layout approvalFile: layout page two.pdf30 Jul 2021
Layout approvalFile: layout page three.pdf30 Jul 2021
Layout approvalFile: layout page four.pdf30 Jul 2021
Layout approvalFile: layout page five.pdf30 Jul 2021
Layout approvalFile: layout page six.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout one.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout 2.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout page one.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout page two.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout page three.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout page four.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout page five.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: layout page six.pdf30 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Cc.pdf30 Jul 2021
Declaration about Commencement CertificateFile: cc declartion.pdf30 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: IOD 16 floors - 2275699Amendletter_signed.pdf28 Jun 2021
Disclosure of sold/ booked inventoryFile: LA Quinta MIS converted.pdf16 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch-cert.pdf17 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng-cert.pdf17 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P51800026169.pdf31 Dec 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GIRIVAN LA QUINTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmGIRIVAN LA QUINTACompleted 106Lapsed / revoked 65Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 283 registered projects within 2 km.

Builder: Abhishek Mahesh Garodia

Abhishek Mahesh Garodia has 1 registration on MahaRERA, including GIRIVAN LA QUINTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GIRIVAN LA QUINTA is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GIRIVAN LA QUINTA?

The registered promoter entity is Abhishek Mahesh Garodia, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GIRIVAN LA QUINTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GIRIVAN LA QUINTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GIRIVAN LA QUINTA?

The professionals named in the filing: Architect: Hemant Karani; Engineer: Gireesh Rajadhyaksha; Engineer: Hanamantaray Nandepagol; Chartered Accountant: Ketan Kataria and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GIRIVAN LA QUINTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GIRIVAN LA QUINTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GIRIVAN LA QUINTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.