Home / Browse projects / GINI BELVISTA - PHASE I

Completed No litigation declared Others project

GINI BELVISTA - PHASE I

By Gini Citicorp Realty LLP

RG-MH-36617 · RERA P52100018898 · Last updated on MahaRERA portal: 13 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2023Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
2 of 211Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

GINI BELVISTA - PHASE I is a Others project by Gini Citicorp Realty LLP in PARANDE PARK, 411015, registered with MahaRERA as P52100018898 on 11 Dec 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. 209 of the 211 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGINI BELVISTA - PHASE I
  • TypeOthers
  • Location
    • NEAR PORWAL ROAD
    • PARANDE PARK
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018898
  • ReraGenie IDRG-MH-36617

Builder

  • NameGini Citicorp Realty LLP
  • Entity typePartnership
  • GSTIN27AAJFG4973H1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersGautam Vinod Harlalka, Manish Vinod Harlalka, Pranav Deepak Harlalka, Deepak Vishwanath Harlalka, Vinod Sewaram Harlalka, Karan Deepak Harlalka, Gautam Vinod Harlalka, Pranav Deepak Harlalka, Vinod Sewaram Harlalka, Manish Vinod Harlalka, Karan Deepak Harlalka, Deepak Vishwanath Harlalka
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredDec 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Dec 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed76 files

Current status

99%209 of 211 units booked
0.2%Work done, per cost certificate

Figures as on 13 Nov 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA1308516101
ENA14031031
FNA14079079

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Compound WallYes100%
SWIMMING POOLYes100%

Parking filed195

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots195
Closed/Covered195
BuildingClosed/CoveredTotal
A8585
E3131
F7979

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,825 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024
LandownerVillageDistrict
JIJABAI SUBHASH PARANDE-Pune
VIJAY SUBHASH PARANDE-Pune
VIDYA VIJAY PARANDE-Pune
SAMBHAJI SUBHASH PARANDE-Pune
SUNITA SAMBHAJI PARANDE-Pune
ATUL SUBHASH PARANDE-Pune
SUPRIYA ATUL PARANDE-Pune
RAJASHREE GANESH PADALEBanerPune
SUBHASH DASHARATH PARANDE-Pune

Approvals and building plan

Permissible FSI15044.72
Proposed, not sanctioned15,045 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT MUMBAI
Estimated costRs 253.68 cr
Cost incurredRs 41.76 lakh
Work done0.16%
BuildingWingEstimatedIncurred
ANARs 240.60 cr-
-NARs 13.08 crRs 41.76 lakh

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Gini Citicorp Realty LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000340685Gautam HarlalkaMr. Tushar Bhagwat Suryawanshi11/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2023

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GV01 Form 1 Sep 2024.pdf13 Nov 2024
Certificates of CA (Form 3)File: GV01 Form 3 Sep 2024.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GV01 Form 2 Sep 24.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: GV 01 Sold Unsold Sep 24.pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 (GB-PH-01).pdf27 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: PPhase 1 Society registration certificate .pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 210222.pdf13 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 300522.pdf13 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCH COMPLETION.pdf10 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION OC.pdf28 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_RERA Belvista Phase -I_FY20-21.pdf21 Jan 2023
Certificates of CA (Form 3)File: FORM 3 CA CERT 310719.pdf18 Jan 2023
Certificates of CA (Form 3)File: 3 - Rera Certificate.pdf18 Jan 2023
Certificates of CA (Form 3)File: 4 - Rera Certificate.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL REPORT 21-22 _CA CERTIFICATE_RERA _ BELVISTA PHASE I.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GINI BELVISTA.pdf29 Aug 2022
Disclosure of sold/ booked inventoryFile: DEC 2021 PH I PDF.pdf4 Jan 2022
Disclosure of sold/ booked inventoryFile: Oct 2021 PH I PDF.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Belvista Disclouser of inventory form 3.pdf19 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANNAL REPORT 19-20.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Eng Cert Form II PhaseI 310321.pdf21 Jun 2021
Details of Restarting of Construction work post lockdownFile: Belvista Restart Letter.pdf5 Nov 2020
Form 2AFile: Form 2A Eng Quality Asuurance Cert Q4 18-19.pdf27 Feb 2020
Form 2AFile: Form 2A Eng Quality Asuurance Cert Q2 19-20.pdf27 Feb 2020
Form 2AFile: Form 2A Eng Quality Asuurance Cert Q3 19-20.pdf26 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 CA 1819.pdf23 Nov 2019
Form 2AFile: Form 2A Eng Quality Asuurance Cert Q1 19-20.pdf18 Jul 2019
Form 2AFile: Form 2A Dec18.pdf9 Jan 2019
Copy of the legal title reportFile: Search 04-12-2018.pdf4 Dec 2018
Proforma of Allotment letterFile: 04-12-2018 RERA GINI Belvista final.pdf4 Dec 2018
Declaration in FORM BFile: B Form LLP Belvista.pdf3 Dec 2018
Certificates of CA (Form 3)File: Gini Belvista_Form 3_Certified.pdf29 Nov 2018
Layout approvalFile: Old Layout Colour.pdf28 Nov 2018
Building plan approvalFile: A Second and Fourth Floor.pdf28 Nov 2018
Building plan approvalFile: A Basement Floor.pdf28 Nov 2018
Building plan approvalFile: A Eighth Floor.pdf28 Nov 2018
Building plan approvalFile: A Fifth Seventh Ninth Floor.pdf28 Nov 2018
Building plan approvalFile: A First Floor_A.pdf28 Nov 2018
Building plan approvalFile: A Ground Floor.pdf28 Nov 2018
Building plan approvalFile: A Sixth Floor.pdf28 Nov 2018
Building plan approvalFile: A Third Floor.pdf28 Nov 2018
Building plan approvalFile: ClubHouse.pdf28 Nov 2018
Building plan approvalFile: E 2-4-6-3-5-7-9.pdf28 Nov 2018
Building plan approvalFile: E Basement Ground First.pdf28 Nov 2018
Building plan approvalFile: E Eighth Floor.pdf28 Nov 2018
Building plan approvalFile: F 1st Floor.pdf28 Nov 2018
Building plan approvalFile: F 2-4-6.pdf28 Nov 2018
Building plan approvalFile: F 3-5-7-9.pdf28 Nov 2018
Building plan approvalFile: F 8th.pdf28 Nov 2018
Building plan approvalFile: F Ground and Basement.pdf28 Nov 2018
Building plan approvalFile: Layout New.pdf28 Nov 2018
Copy of Layout Approval (in case of layout)File: Old Layout Colour.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Second and Fourth Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Basement Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Eighth Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Fifth Seventh Ninth Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: A First Floor_A.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Ground Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Sixth Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: A Third Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: ClubHouse.pdf28 Nov 2018
Building Plan Approval (IOD)File: E 2-4-6-3-5-7-9.pdf28 Nov 2018
Building Plan Approval (IOD)File: E Basement Ground First.pdf28 Nov 2018
Building Plan Approval (IOD)File: E Eighth Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: F 1st Floor.pdf28 Nov 2018
Building Plan Approval (IOD)File: F 2-4-6.pdf28 Nov 2018
Building Plan Approval (IOD)File: F 3-5-7-9.pdf28 Nov 2018
Building Plan Approval (IOD)File: F 8th.pdf28 Nov 2018
Building Plan Approval (IOD)File: F Ground and Basement.pdf28 Nov 2018
Building Plan Approval (IOD)File: Layout New.pdf28 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Nov 2018
OtherFile: Belvista EC Order-compressed.pdf28 Nov 2018
Details of encumbrancesFile: No Enc Cert Belvista.pdf27 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Gini Belvista.pdf27 Nov 2018
PAN CardFile: LLP pancard.pdf20 Nov 2018
Proforma of Allotment letterFile: Allotment Letter.pdf20 Nov 2018

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GINI VIVANTE PHASE 02P52100050601KIWALE, Pune621Apr 2023OngoingDec 2027Not due yet
GINI VIVANTE PHASE 01P52100034447VILLAGE KIWALE, Pune539Apr 2022OngoingDec 2026Not due yet
Harlalka HeightsSitaram Poddar Marg Fanaswadi36-CompletedMay 2017Late, Jun 2017
Gini Viviana Phase 1Survey No 38-1 Balewadi191-CompletedMay 2016Late, May 2017
Gini Bellina Phase 1off Porwal Road Lohegaon140-CompletedJan 2014Late, Mar 2015

Keep GINI BELVISTA - PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARANDE PARK

2 kmGINI BELVISTA - PHASE ICompleted 31Lapsed / revoked 7Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Gini Citicorp Realty LLP

Gini Citicorp Realty LLP has 8 registrations on MahaRERA, including Gini Viviana F Bldg Phase 2 and GINI BELVISTA - PHASE I. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if GINI BELVISTA - PHASE I is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GINI BELVISTA - PHASE I?

The registered promoter entity is Gini Citicorp Realty LLP, a partnership as per the filing. Its GSTIN 27AAJFG4973H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GINI BELVISTA - PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GINI BELVISTA - PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GINI BELVISTA - PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in GINI BELVISTA - PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GINI BELVISTA - PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GINI BELVISTA - PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.