Home / Browse projects / GINI BELVISTA PHASE 3

Completed No litigation declared Residential / Group Housing project

GINI BELVISTA PHASE 3

By Gini Citicorp Realty LLP

RG-MH-22633 · RERA P52100032590 · Last updated on MahaRERA portal: 13 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

GINI BELVISTA PHASE 3 is a Residential / Group Housing project by Gini Citicorp Realty LLP in PARANDE PARK, 411015, registered with MahaRERA as P52100032590 on 14 Jan 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameGINI BELVISTA PHASE 3
  • TypeResidential / Group Housing
  • Location
    • NEAR PORWAL ROAD
    • PARANDE PARK
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032590
  • ReraGenie IDRG-MH-22633

Builder

  • NameGini Citicorp Realty LLP
  • Entity typePartnership
  • GSTIN27AAJFG4973H1Z1
  • PartnersGautam Vinod Harlalka, Manish Vinod Harlalka, Pranav Deepak Harlalka, Deepak Vishwanath Harlalka, Vinod Sewaram Harlalka, Karan Deepak Harlalka, Gautam Vinod Harlalka, Pranav Deepak Harlalka, Vinod Sewaram Harlalka, Manish Vinod Harlalka, Karan Deepak Harlalka, Deepak Vishwanath Harlalka
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Jan 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA130000
GNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots107
Closed/Covered107
BuildingClosed/CoveredTotal
C8585
G2222

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,467 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024
LandownerVillageDistrict
VIJAY SUBHASH PARANDEPune (M Corp.)Pune
VIDYA VIJAY PARANDEPune (M Corp.)Pune
SUNITA SAMBHAJI PARANDEPune (M Corp.)Pune
ATUL SUBHASH PARANDEPune (M Corp.)Pune
SUPRIYA ATUL PARANDEPune (M Corp.)Pune
SUBHASH DASHARATH PARANDEPune (M Corp.)Pune
RAHASHREE GANESH PADALEBanerPune
SAMBHAJI SUBHASH PARANDEPune (M Corp.)Pune
JIJABAI SUBHASH PARANDEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPoona Municipal Corporations
Permissible FSI10942.04
Proposed, not sanctioned7,211 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMITTAL COURT NARIMAN POINT MUMBAI

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Gini Citicorp Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Oct 2024

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB03 Form 1 Sep 2024.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB03 Form 3 Sep 2024.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GB 03 Form 2 Sep 2024.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: GB 03 Sold Unsold Sep 24.pdf13 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: GB 03 FORM 4.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GB03 FORM 5 23-24.pdf9 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Belvista Final OC.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 signed.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gini belvista phase 3.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belvista phase 3.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB03 FORM 3 JUNE 24_Final.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: GB 03 SOLD UNSOLDpdf.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB03 CA CERT DEC23_compressed Signed.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB 03 Q4 23-24 CA_compressed.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB 03 Q4 23-24 ARCH.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GB 03 Q4 23-24 ENG.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: GB 03 Q4 23-24 SOLD-UNSOLD.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM II A - Belvista Phase-3 -31032024.pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form II A - Gini Belvista Phase-3 -31032023.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB 03 ARCH SEP 23.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB03 ARCH CERT DEC23.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GB 03 ENG SEP 23.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GB03 ENG CERT DEC23.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY GINI BELVISTA PH-3_30-06-2023.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY (GB PH-03) Sep 23.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: GB03 DISC INVENTORYDec23.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB 03 CA SEP 23_11zon (1).pdf3 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 (GB-PH-03).pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB 03 ARCH .pdf10 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GB 03 ENG .pdf10 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB 03 CA _compressed.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: GetUserDocumentFileContent (1).pdf29 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GB 03 ARCH MARCH 23.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GB 03 ENG MARCH 23.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB 03 CA MARCH.pdf16 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF SOLD -GB PH 03.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE (GB PH-3).pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE (GB PH-3).pdf11 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS (GB-3).pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: GB PH 3 DISCLOSURE OF INVENTORY.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 ARCHITECTS CERTIFICATE GB-PHASE-03.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ENGINEERS CERTIFICATE GB-PHASE-03.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 ENGINEERS CERTIFICATE GB-PHASE-03.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CHARTERED ACCOUNTANTS GB-PHASE-03.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL REPORT 21-22 _CA CERTIFICATE_RERA _ BELVISTA PHASE 3.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY (BELVISTA PHASE-3).pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT PH 3.pdf28 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT P3.pdf28 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PH 3.pdf28 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Ph 3.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Ph 3.pdf27 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 3.pdf27 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 3.pdf27 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 3.pdf27 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 3.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RArch Cert.pdf13 Aug 2022
Disclosure of sold/ booked inventoryFile: RBelvista Ph 3 Disclosure of inventory form 3.pdf13 Aug 2022
Disclosure of sold/ booked inventoryFile: RBelvista Ph 3 Disclosure of inventory form 3.pdf13 Aug 2022
Building plan approvalFile: G Bldg 1-8th Floor_compressed.pdf6 May 2022
Layout approvalFile: Layout _compressed.pdf6 May 2022
Copy of Layout Approval (in case of layout)File: Layout _compressed.pdf6 May 2022
Building Plan Approval / NA Order for plotted developmentFile: G Bldg 1-8th Floor_compressed.pdf6 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 4148_compressed.pdf6 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200226377055_For_Asset_Based_Search_22_12_2021_12_50_18_036.pdf24 Dec 2021
Proforma of Allotment letterFile: allotment.pdf7 Dec 2021
Layout approvalFile: OLD LAYOUT download.pdf25 Nov 2021
Layout approvalFile: 01-01 layout .pdf25 Nov 2021
Building plan approvalFile: 07-14 C wing Ground Floor .pdf25 Nov 2021
Building plan approvalFile: 08-14 C Wing 1st Floor .pdf25 Nov 2021
Building plan approvalFile: 09-14 C wing 2nd Floor .pdf25 Nov 2021
Building plan approvalFile: 10-14 C WIng odd floors .pdf25 Nov 2021
Building plan approvalFile: 11-14 C Wing 4 AND 6 Floors .pdf25 Nov 2021
Building plan approvalFile: 12-14 C Wing 8th Floor .pdf25 Nov 2021
Building plan approvalFile: 13-14 C Wing Terrace .pdf25 Nov 2021
Details of encumbrancesFile: No Enc.pdf25 Nov 2021
Copy of Layout Approval (in case of layout)File: OLD LAYOUT download.pdf25 Nov 2021
Copy of Layout Approval (in case of layout)File: 01-01 layout .pdf25 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 07-14 C wing Ground Floor .pdf25 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 08-14 C Wing 1st Floor .pdf25 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 09-14 C wing 2nd Floor .pdf25 Nov 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GINI VIVANTE PHASE 02P52100050601KIWALE, Pune621Apr 2023OngoingDec 2027Not due yet
GINI VIVANTE PHASE 01P52100034447VILLAGE KIWALE, Pune539Apr 2022OngoingDec 2026Not due yet
Harlalka HeightsSitaram Poddar Marg Fanaswadi36-CompletedMay 2017Late, Jun 2017
Gini Viviana Phase 1Survey No 38-1 Balewadi191-CompletedMay 2016Late, May 2017
Gini Bellina Phase 1off Porwal Road Lohegaon140-CompletedJan 2014Late, Mar 2015

Keep GINI BELVISTA PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARANDE PARK

2 kmGINI BELVISTA PHASE 3Completed 31Lapsed / revoked 7Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Gini Citicorp Realty LLP

Gini Citicorp Realty LLP has 8 registrations on MahaRERA, including Gini Viviana F Bldg Phase 2 and GINI BELVISTA - PHASE I. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if GINI BELVISTA PHASE 3 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GINI BELVISTA PHASE 3?

The registered promoter entity is Gini Citicorp Realty LLP, a partnership as per the filing. Its GSTIN 27AAJFG4973H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GINI BELVISTA PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GINI BELVISTA PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in GINI BELVISTA PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GINI BELVISTA PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GINI BELVISTA PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.