ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GINI ARIA MHADA WING

Completed No litigation declared Residential / Group Housing project

GINI ARIA MHADA WING

By Gini Construction Pvt Ltd

RG-MH-22175 · RERA P52100031664 · Last updated on MahaRERA portal: 21 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

GINI ARIA MHADA WING is a Residential / Group Housing project by Gini Construction Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100031664 on 3 Nov 2021. The registration is recorded completed; possession was promised by 31 Mar 2025.

At a glance

Project

  • NameGINI ARIA MHADA WING
  • TypeResidential / Group Housing
  • Location
    • BOPDEV GHAT
    • YEWALEWADI
    • YAWALEWADI
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031664
  • ReraGenie IDRG-MH-22175

Builder

  • NameGini Construction Pvt Ltd
  • Entity typeCompany
  • Managing DirectorsDeeapk Vishwanath Harlalka, Manish Vinod Harlalka, Gautam Vinod Harlalka
  • Other registrations4 more →
  • Completed5 of 5
  • Declared earlier projects6 →

Key dates

this monthRegisteredNov 2021PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Nov 2021
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MHADA WINGNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MHADA WING: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered12
Open Space9

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area750 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
DATTOBA VITHOBA PADWALYAWALEWADIPune
YAMUNA DATTU PADWALYAWALEWADIPune
SUREKHA RAJENDRA WALHEKARYAWALEWADIPune
BABLU RAJENDRA WALHEKARYAWALEWADIPune
AKSHAY RAJENDRA WLHEKARYAWALEWADIPune
DEWIDAS DATTU PADWALYAWALEWADIPune
BALASAHEB DATTOBA PADWALYAWALEWADIPune
PRAMILA BALASAHEB PADWALYAWALEWADIPune
VAISHALI DEVIDAS PADWALYAWALEWADIPune
AMIT MAHENDRA SHAHPune (M Corp.)Pune
SHITAL SHITAL JAINPune (M Corp.)Pune

Approvals and building plan

Permissible FSI2007.67
Proposed, not sanctioned1,972 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT MUMBAI

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Gini Construction Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Nov 2024

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: AM FORM 4.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AM Form 1 Sep 24.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AM Form 3 Sep 24.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AM Form 2 Sep 2024.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: AM Sold Unsold Sep 24.pdf13 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Mhada Winf.pdf12 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AM FORM 4.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AM FORM 5 23-24.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GA MHADA FORM 1 JUNE 24.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GA MHADA FORM 2 JUNE 24.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GA MHADA FORM 3 JUNE 24_Final.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: GA MHADA SOLD UNSOLD.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AM Q4 23-24 ARCH.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AM 02 Q4 23-24 ENG.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: AM Q4 23-24 SOLD-UNSOLD.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AM 02 Q4 23-24 CA_compressed.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form II A - Aria-E- Mhada 31032024.pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form II A - Aria-E- Mhada 31032023.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GA MHADA ARCH CERT JUNE 23.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GA Mhada ARCH CERTI DEC23.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GA MHADA ENG CERT JUNE 23.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GA MHADA ENG CERT DEC23.pdf4 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY (GA MHADA ) Sep23.pdf4 Feb 2024
Disclosure of sold/ booked inventoryFile: GA MHADA DISC INV DEC23.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GA MHADA CA CERT JUNE 23.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GA MHADA CA CERT DEC23_11zon.pdf4 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 GAM.pdf27 Jan 2024
Disclosure of sold/ booked inventoryFile: GA-MHADA WING DISCLOSURE OF INVENTORY.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT 310323 DATA.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 310323 DATA.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT 310323 DATA.pdf4 May 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD-GA MHADA WING.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE (GA).pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE (GA).pdf11 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS (GA).pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE ARIA MHADA.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE ARIA MHADA.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS ARIA MHADA.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL REPORT 21-22 _CA CERTIFICATE_RERA _ GINI ARIA MHADA WING.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY (ARIA).pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Mahada.pdf27 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Mhada.pdf27 Sep 2022
Disclosure of sold/ booked inventoryFile: Aria Mhada Disclosure of inventory form 3.pdf27 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Mahda.pdf27 Sep 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT RERA FORMAT.pdf28 Oct 2021
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf28 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_compressed_compressed.pdf16 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gini Construction Pvt Ltd-compressed.pdf16 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LLL27-09-2021.pdf27 Sep 2021
Layout approvalFile: Layout .pdf6 Sep 2021
Building plan approvalFile: Building Plan .pdf6 Sep 2021
Copy of Layout Approval (in case of layout)File: Layout .pdf6 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan .pdf6 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates _ NA Order for plotted development.pdf6 Sep 2021
Declaration about Commencement CertificateFile: Form D CC declaration.pdf6 Sep 2021
Declaration in FORM BFile: GAUTAM SIR.pdf6 Sep 2021
Declaration in FORM BFile: AMIT SHAHA AND SHEETAL JAIN.pdf6 Sep 2021
Declaration in FORM BFile: PADWAL FAMILY FORM B.pdf6 Sep 2021
PAN CardFile: PAN Card.pdf11 Aug 2021
Details of encumbrancesFile: No Encumbrance Aria.pdf11 Aug 2021

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GINI ARIA - PHASE IYAWALEWADI PUNE-41104865CompletedSep 2022Jun 2022
Bellina Phase 3Lohgaon Pune-41104749CompletedSep 2020Aug 2020
BELLINA PHASE 2 - COMMERCIALLohgaon Pune-41104731CompletedSep 2018Feb 2018
Harlalka HeightsSitaram Poddar Marg Kalbadevi36CompletedMay 2017Late, Jun 2017
Gini Viviana Phase 1Survey No 38-1 Balewadi191CompletedMay 2016Late, May 2017
Gini Bellina Phase 1off Porwal Road Lohegaon140CompletedJan 2014Late, Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GINI ARIA MHADA WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near YEWALEWADI13,700+ in Pune

2 kmGINI ARIA MHADA WINGCompleted 11Lapsed / revoked 8Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Gini Construction Pvt Ltd

Gini Construction Pvt Ltd has 5 registrations on MahaRERA, including BELLINA PHASE 3 and BELLINA PHASE 2 - COMMERCIAL. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GINI ARIA MHADA WING is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GINI ARIA MHADA WING?

The registered promoter entity is Gini Construction Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GINI ARIA MHADA WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GINI ARIA MHADA WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in GINI ARIA MHADA WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GINI ARIA MHADA WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GINI ARIA MHADA WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.