Geras Isle Royale Tower 4 and 5
By Gera Developments Private Limited
RG-MH-20496 · RERA P52100011031 · Last updated on MahaRERA portal: 8 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 15 cases
- Completion date moved by 80 months
- 2 extensions taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Geras Isle Royale Tower 4 and 5 is a Residential / Group Housing project by Gera Developments Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100011031 on 31 Aug 2017. Possession is promised by 31 Dec 2030. The completion date has moved by 80 months from the original filing. 10 of the 42 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameGeras Isle Royale Tower 4 and 5
- TypeResidential / Group Housing
- Location
- Bhavdhan
- Bavdhan
- Bavadhan BK
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100011031
- ReraGenie IDRG-MH-20496
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Dec 2030
- Revised completionRevised to 31 Dec 2030 (originally 30 Apr 2024)
- Buildings2 building records
- Documents filed104 files
Current status
Figures as on 8 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | NA | 15 | 0 | 21 | 0 | 21 |
| Block B | NA | 15 | 0 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
Block A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 40% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed132
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Block A | 66 | 66 |
| Block B | 66 | 66 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Block B | NA | Rs 42.86 cr | - |
| Block A | NA | Rs 42.86 cr | - |
| - | NA | Rs 15.35 cr | Rs 2.44 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Malwadkar Architects Pvt Ltd |
| Architect | Gera Developments |
| Engineer | Santosh Tiwatne |
| Engineer | Ashish Rajigare |
| Chartered Accountant | Jain Doshi and Associates |
| Chartered Accountant | K Ray & Co |
| Chartered Accountant | Khandelwal Jain & Associates |
| Chartered Accountant | Deepak Shah |
| Chartered Accountant | Shah Khandelwal Jain & Associates |
| Partner | Role in project |
|---|---|
| Gera Developments Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, hereby apply for extension u/s 7 (3) of the registered project bearing registration number P52100011031. Project was registered in August 2017. We Gera Developments Private Limited do hereby declare that the honorable Bombay High-Court in second appeal number 397/11 had passed an interim order dated 5th August 2016“restraining Gera Developments Private Limited from commencing any new construction activities, including excavation, on the suit plot” (Project Land). (restraining order Uploaded) In pursuance of the Interim order dated 5th August 2016 Gera Developments Private Limited was not a
Reason as filed by the promoterhe construction activities of the project undertaken by Gera Developments Private Limited had not commenced as the revised Commencement Certificate (CC) was awaited. The revised CC has now been received, and the project construction shall commence in accordance with the approved permissions and development schedule.
Litigation declared15
| Case | Court | Status |
|---|---|---|
| 761/2004 | Civil Court Pune | Closed |
| 1656/2009 | High Court Bombay | Closed |
| 493/2010 | Civil Court Pune | Ongoing |
| 1173/2010 | Civil Court Pune | Closed |
| 2027/2012 | Civil Court Pune | Closed |
| 401/2012 | Civil Court Pune | Ongoing |
| 1664/2014 | Civil Court Pune | Ongoing |
| 1213/2017 | Civil Court Pune | Ongoing |
| 1858/2019 | Civil Court Pune | Closed |
| 797/2019 | Civil Court Pune | Ongoing |
| 1879/2017 | Civil Court Pune | Closed |
| 397/2011 | Civil Court Pune | Closed |
| 1478/2025 | Civil Court Paud | Ongoing |
| 49/2025 | Civil Court Paud | Ongoing |
| 513/2025 | Civil Court Paud | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jul 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jul 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement certificateFile: building cc.pdf | 8 Jul 2026 |
| Commencement certificateFile: layout cc.pdf | 8 Jul 2026 |
| Layout approvalFile: plan 001 Layout.pdf | 8 Jul 2026 |
| Layout approvalFile: plan 01.pdf | 8 Jul 2026 |
| Building plan approvalFile: plan 02.pdf | 8 Jul 2026 |
| Building plan approvalFile: Plan 03.pdf | 8 Jul 2026 |
| Building plan approvalFile: Plan 04.pdf | 8 Jul 2026 |
| Building plan approvalFile: Plan 05.pdf | 8 Jul 2026 |
| Building plan approvalFile: Plan 06.pdf | 8 Jul 2026 |
| Building plan approvalFile: Plan 07.pdf | 8 Jul 2026 |
| Building plan approvalFile: Plan 08.pdf | 8 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 Q1 FY 26 27 IR 4 and 5_2294.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: Q1 FY 26 27 FORM 2 IR 4 and 5_1686.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 IR 4 and 5.pdf | 8 Jul 2026 |
| Withdrawal Update Form 1File: IR_T4 and T5.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate IR Tower 4 and 5 31032026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: IR 4 5.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: IR_RERA CERTIFICATE_T4 T5.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate- IR Tower 4 5.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: IR 4 5.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 IR 4 and 5.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Engineers Certificate IR Tower 4 5.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: IR Tower 4 5_11zon.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: IR 4 5.pdf | 3 Oct 2025 |
| Withdrawal Update Form 2File: Eng Cert IR 4 5.pdf | 3 Oct 2025 |
| Withdrawal Update Form 3File: IR 4 5.pdf | 3 Oct 2025 |
| Form 2A (FY 2024-2025)File: IR 4 5 2A FY 24 25.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: IR Tower 4 5 FY24-25.pdf | 14 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: IR 4 and 5 Sold Unsold.pdf | 24 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IR Tower 4 and 5 March 2025.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AFFINIA ENGINEER CERTIFICATE 31032025.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IR TOWER 4 5 ENGINEER CERTIFICATE 31032025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IR 4 5 FORM 1.pdf | 21 Jan 2025 |
| Certificates of CA (Form 3)File: IR 4 5.pdf | 21 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate IR Tower 4 5 31122024.pdf | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: IR 4 5.pdf | 21 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC.pdf | 13 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IR 4 5 FORM 230092024.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23-24 IR 4 5.pdf | 21 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IR 4 5 FORM 230092024.pdf | 21 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23-24 IR 4 5.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: IR 4 5 Disc Sold Unsold 30092024.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: IR 4 5 Disc Sold Unsold 30092024.pdf | 18 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IR TOWER 4 5 FORM 1 30092024.pdf | 5 Nov 2024 |
| Certificates of CA (Form 3)File: Gera IR Tower 4-5 30092024.pdf | 20 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate IR Tower 4-5 30092024.pdf | 20 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Seperate Bank account disclosure IR 4 5 signed.pdf | 9 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Interest in other Organization.pdf | 9 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY23-24 IR 4 5.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: IR Tower 4 5_compressed.pdf | 9 Oct 2024 |
| Declaration in FORM BFile: FORM B.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: IR 4 5 .pdf | 20 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IR 4 5.pdf | 19 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert IR 4 5.pdf | 19 Jul 2024 |
| Certificates of CA (Form 3)File: IR 4 5.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: IR 4 and 5.pdf | 29 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IR 4 and 5.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: IR 4 and 5.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: I R 4 and 5.pdf | 20 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IR 4 and 5 FORM 1.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IR Tower 4 5 Engineer Certificate 31122023.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold IR.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: IR 4 and 5 Q2.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Notes_IR Tower 4 5.pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disc Sold Unsold IR 4 5.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Isle Royale 4 and 5.pdf | 27 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Notes IR Tower 4-5_Signed.pdf | 17 Oct 2022 |
| OtherFile: Form 5 Notes IR Tower 4-5_Signed.pdf | 28 Sep 2022 |
| Certificates of CA (Form 5)File: Form 5 Notes IR Tower 4-5_Signed.pdf | 27 Sep 2022 |
| CERSAI detailsFile: CERSAI Declaration - Gera's IR.pdf | 8 Jul 2022 |
| CERSAI detailsFile: CERSAI Declaration - Gera's IR.pdf | 18 May 2022 |
| Declaration about Commencement CertificateFile: IR-4-5-declaration.pdf | 12 May 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory- IR-4-5.pdf | 12 May 2022 |
| OtherFile: IR-4-5.pdf | 17 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_IR Tower 4-5.pdf | 29 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Notes to Form 5_IR Tower 4-5.pdf | 29 Sep 2021 |
| Declaration in FORM BFile: Form B- IR-4-5_oct-20.pdf | 23 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: IR 4-5-2019.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: IR 4- 5 -Audit-2019-20.pdf | 30 Sep 2020 |
| Details of Restarting of Construction work post lockdownFile: IR 4-5.pdf | 20 Jun 2020 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Geras Imperium Green | Chalta No 13 Part of PT Sheet No 73 Plot No A X Neogi nagar Rua de Ourem Road Panji Goa | 61 | Completed | Apr 2019 | May 2015 |
| Geras Greenville Song of Joy A1 A2 | Survey No 64 Hissa No 1 to 6 | 120 | Completed | Apr 2017 | Oct 2016 |
| A1 A2 Song of Joy Geras Greenville | S No 64 Hissa No 1to 6 Kharadi Pune 14 | 120 | Completed | Apr 2017 | Oct 2016 |
| Geras Greensville Trinity Towers | Survey No 64 Hissa No 1 to 6 Kharadi Pune 411 014 | 248 | Completed | Nov 2015 | Oct 2015 |
| Geras Regent Tower | Survey No 33 Hissa No 2 2 Village Baner Pune | 9 | Completed | Nov 2014 | Sep 2014 |
| Geras Parkview I | Survey No 73 Hissa No 1 Kharadi Pune 411014 | 227 | Completed | Apr 2014 | Late, Mar 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Geras Isle Royale Tower 4 and 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bavdhan13,700+ in Pune
Filed coordinates, straight-line distance. 171 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Gera Developments Private Limited
Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Geras Isle Royale Tower 4 and 5 is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Geras Isle Royale Tower 4 and 5?
The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Geras Isle Royale Tower 4 and 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Geras Isle Royale Tower 4 and 5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Geras Isle Royale Tower 4 and 5?
The professionals named in the filing: Architect: Malwadkar Architects Pvt Ltd; Architect: Gera Developments; Engineer: Santosh Tiwatne; Engineer: Ashish Rajigare; Chartered Accountant: Jain Doshi and Associates; Chartered Accountant: K Ray & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Geras Isle Royale Tower 4 and 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback