Home / Browse projects / Geras Imperium Alpha

Completed No litigation declared Commercial project

Geras Imperium Alpha

By Gera Developments Private Limited

RG-MH-84679 · RERA P52100015242 · Last updated on MahaRERA portal: 29 Sep 2021

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jan 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Geras Imperium Alpha is a Commercial project by Gera Developments Private Limited in Kharadi, 411014, registered with MahaRERA as P52100015242 on 8 Feb 2018. The registration is recorded completed; possession was promised by 30 Jan 2023. 3 complaints are on record with the regulator.

At a glance

Project

  • NameGeras Imperium Alpha
  • TypeCommercial
  • Location
    • Plot no 3 S.No.64
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015242
  • ReraGenie IDRG-MH-84679

Builder

  • NameGera Developments Private Limited
  • Entity typeCompany
  • Managing DirectorRohit Gera
  • Other registrations24 more →
  • Completed11 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

this monthRegisteredFeb 2018PromisedJan 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Feb 2018
  • Promised completion30 Jan 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Geras Imperium AlphaNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Geras Imperium Alpha: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed316

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots316
Closed/Covered282
Open Space34

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,023 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14333.48
Proposed, not sanctioned14,333 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Garden Road

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGera Developments
EngineerSantosh Tiwatne
Chartered AccountantK Ray & Co
Chartered AccountantKhandelwal Jain & Associates
PartnerRole in project
Gera Developments Private Limited-

Litigation declared9

CaseCourtStatus
1409/2016Civil CourtOngoing
259/2007Civil CourtOngoing
630/2017civilongoing
631/2017Civil courtongoing
632/2017Civil courtongoing
633/2017Civil courtongoing
634/2017Civil courtongoing
635/2017Civil courtongoing
755/2021Civil Court PuneOngoing

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000228403Gera Developments Private LimitedRohan Raosaheb Londhe31/03/2023
CC005000000238608Gera Developments Private LimitedSujit Kamal Jadhav and Arti Sujit Jadhav31/03/2023
CC005000000269326Gera Developments Private LimitedMr. Christraj Vincent Puttu and Mrs. Meghna Christraj Puttu28/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2021

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Imperium Alpha.pdf29 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Notes to Form 5_Imperium Alpha.pdf29 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Imperium Alpha registration certificate .pdf6 May 2021
Certificates of CA (Form 3)File: Geras Imperium Alpha Kharadi CA.pdf5 Mar 2021
Certificates of CA (Form 5)File: Geras Imperium Alpha Kharadi CA.pdf24 Feb 2021
Proforma of Allotment letterFile: 7A- Imperium Alpha Post OC -27-Jan-21.pdf23 Feb 2021
Proforma of Allotment letterFile: Imperium Alpha -V5.pdf17 Feb 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Alpha OC.pdf28 Jan 2021
Architect’s Certificate on Completion of Project (Form 4)File: Alpha Rera certificate-27jan21_rotated.pdf28 Jan 2021
Declaration in FORM BFile: Form B- Alpha_compressed.pdf21 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Arch Certificate 30-Sep-20.pdf21 Nov 2020
Certificates of CA (Form 3)File: CA Cert Imperium Alpha Kharadi 25082020.pdf21 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Alpha-2019.pdf30 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Alpha-Audit-19-20.pdf30 Sep 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Imp Alpha.pdf13 Aug 2020
Details of Restarting of Construction work post lockdownFile: Imp Alpha.pdf20 Jun 2020
Certificates of CA (Form 5)File: Alpha-2019.pdf30 Sep 2019
Details of encumbrancesFile: Encumbrance Imp Alpha.pdf12 Jun 2019
Declaration in FORM BFile: Form B - Alpha_Compressed.pdf12 Jun 2019
Building plan approvalFile: 6-7 Sanction Plan.pdf4 Feb 2019
Building Plan Approval (IOD)File: 6-7 Sanction Plan.pdf4 Feb 2019
Proforma of Allotment letterFile: V3-Gera's Imperium Alpha Application Form-Jan-2019.pdf4 Feb 2019
Proforma of Allotment letterFile: Imperium Alpha -V7.pdf4 Feb 2019
Layout approvalFile: 1-Layout-Plan.PDF29 Jan 2019
Building plan approvalFile: 2-Basement.PDF29 Jan 2019
Building plan approvalFile: 3-LG.PDF29 Jan 2019
Building plan approvalFile: 4-UG.PDF29 Jan 2019
Building plan approvalFile: 5-Floor-1-2-3.PDF29 Jan 2019
Building plan approvalFile: 6-Typical floor.PDF29 Jan 2019
Building plan approvalFile: 7-Section.PDF29 Jan 2019
Copy of Layout Approval (in case of layout)File: 1-Layout-Plan.PDF29 Jan 2019
Building Plan Approval (IOD)File: 2-Basement.PDF29 Jan 2019
Building Plan Approval (IOD)File: 3-LG.PDF29 Jan 2019
Building Plan Approval (IOD)File: 4-UG.PDF29 Jan 2019
Building Plan Approval (IOD)File: 5-Floor-1-2-3.PDF29 Jan 2019
Building Plan Approval (IOD)File: 6-Typical floor.PDF29 Jan 2019
Building Plan Approval (IOD)File: 7-Section.PDF29 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: CC-3288-22Jan-19.pdf29 Jan 2019
Declaration in FORM BFile: Form B- Alpha-Dec-18.pdf29 Jan 2019
Proforma of Allotment letterFile: Gera'sAlpha Application Form-Jan-2019-V2.pdf29 Jan 2019
Proforma of Allotment letterFile: Imperium Alpha -V6.pdf29 Jan 2019
OtherFile: AlphaEC.pdf29 Jan 2019
Layout approvalFile: Layout-CC-1419-18 dated Aug-18.pdf13 Nov 2018
Copy of Layout Approval (in case of layout)File: Layout-CC-1419-18 dated Aug-18.pdf13 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Alpha revised layout CC-Aug-18.PDF13 Nov 2018
Certificates of CA (Form 5)File: GDPL Imperium Alpha.pdf30 Sep 2018
Proforma of Allotment letterFile: ARTICLES OF AGREEMENT Imperium Alpha -V4.pdf6 Aug 2018
Proforma of Allotment letterFile: ARTICLES OF AGREEMENT formatted Imperium Alpha -V3.pdf14 May 2018
Proforma of Allotment letterFile: ARTICLES OF AGREEMENT -Revised20Apr18v2.pdf3 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Agreement- Alpha -1 Feb.pdf2 Feb 2018
Proforma of Allotment letterFile: Gera's Imperium Alpha Application Form 2-Feb.pdf2 Feb 2018
Proforma of Allotment letterFile: ARTICLES OF AGREEMENT formatted Imperium Alpha - 02 feb 18.pdf2 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Imp-Alpha-Arch Cerf-3.pdf1 Feb 2018
Details of encumbrancesFile: Imperium Alpha - Encumberance Declaration.pdf30 Jan 2018
Building plan approvalFile: Layout Plan 2.PDF29 Jan 2018
Building Plan Approval (IOD)File: Layout Plan 2.PDF29 Jan 2018
Copy of the legal title reportFile: Imperium Alpha -Title and Search Report.pdf25 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Imperium Alpha - Commencement 1.pdf25 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Imperium Alpha - Commencement 2.pdf25 Jan 2018
Declaration in FORM BFile: Imperium Alpha - Form B.pdf25 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imp Alpha-Eng.pdf25 Jan 2018
Certificates of CA (Form 3)File: Form 3_Gera Imperium Alfa.pdf25 Jan 2018
Layout approvalFile: Layout Plan 1.PDF24 Jan 2018
Building plan approvalFile: Building Plan 1.PDF24 Jan 2018
Building plan approvalFile: Building Plan 2.PDF24 Jan 2018
Building plan approvalFile: Building Plan 3.PDF24 Jan 2018
Building plan approvalFile: Building Plan 4.PDF24 Jan 2018
Building plan approvalFile: Building Plan 5.PDF24 Jan 2018
PAN CardFile: GDPL PAN.pdf24 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout Plan 1.PDF24 Jan 2018
Building Plan Approval (IOD)File: Building Plan 1.PDF24 Jan 2018
Building Plan Approval (IOD)File: Building Plan 2.PDF24 Jan 2018
Building Plan Approval (IOD)File: Building Plan 3.PDF24 Jan 2018
Building Plan Approval (IOD)File: Building Plan 4.PDF24 Jan 2018
Building Plan Approval (IOD)File: Building Plan 5.PDF24 Jan 2018

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Imperium GreenChalta No 13 Part of PT Sheet No 73 Plot No A X Neogi nagar Rua de Ourem Road Panji Goa61CompletedApr 2019May 2015
Geras Greenville Song of Joy A1 A2Survey No 64 Hissa No 1 to 6120CompletedApr 2017Oct 2016
A1 A2 Song of Joy Geras GreenvilleS No 64 Hissa No 1to 6 Kharadi Pune 14120CompletedApr 2017Oct 2016
Geras Greensville Trinity TowersSurvey No 64 Hissa No 1 to 6 Kharadi Pune 411 014248CompletedNov 2015Oct 2015
Geras Regent TowerSurvey No 33 Hissa No 2 2 Village Baner Pune9CompletedNov 2014Sep 2014
Geras Parkview ISurvey No 73 Hissa No 1 Kharadi Pune 411014227CompletedApr 2014Late, Mar 2015

Keep Geras Imperium Alpha on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

2 kmGeras Imperium AlphaCompleted 34Lapsed / revoked 17Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: Gera Developments Private Limited

Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Geras Imperium Alpha is delayed beyond 30 Jan 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Geras Imperium Alpha?

The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Geras Imperium Alpha?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Geras Imperium Alpha?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Geras Imperium Alpha?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Geras Imperium Alpha?

The professionals named in the filing: Architect: Gera Developments; Engineer: Santosh Tiwatne; Chartered Accountant: K Ray & Co; Chartered Accountant: Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Geras Imperium Alpha?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Geras Imperium Alpha. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Geras Imperium Alpha to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.