Home / Browse projects / Satara, Maharashtra / GEMS RESIDENCY

Registered No litigation declared Residential / Group Housing project

GEMS RESIDENCY

By JAWAD DEVELOPERS PRIVATE LIMITED

RG-MH-24595 · RERA P52700008539 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 105 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 105 months from the original
60 of 99Construction stages doneacross 9 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

GEMS RESIDENCY is a Residential / Group Housing project by JAWAD DEVELOPERS PRIVATE LIMITED in Satara, Maharashtra, registered with MahaRERA as P52700008539 on 19 Aug 2017. Possession is promised by 31 Dec 2030. The completion date has moved by 105 months from the original filing.

At a glance

Project

  • NameGEMS RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Jadhavwadi (563279)
    • Phaltan
    • Satara
    • 415523
  • Pincode415523
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700008539
  • ReraGenie IDRG-MH-24595

Builder

  • NameJAWAD DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorYUSUF GAFAR KACHHI
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseMar 2022Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Mar 2022)
  • Buildings9 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA50000
B WINGNA50000
C WINGNA50000
D WINGNA50000
E WINGNA50000
F WINGNA50000
G WINGNA50000
H WINGNA50000
I WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes70%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
COMPOUND WALLYes90%
ENTRANCE GATEYes80%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9
BuildingClosed/CoveredTotal
A WING11
B WING11
C WING11
D WING11
E WING11
F WING11
G WING11
H WING11
I WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,196 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4923.15
Proposed, not sanctioned4,923 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPALACE STREET SATARA

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIKAS GHADGE AND ASSOCIATES
PartnerRole in project
JAWAD DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700024459Mar 2022 → Dec 2030

Reason as filed by the promoterWe have completed 6 buildings out of 9 buildings and got its c occupancy certificate which were also hand over to alloties . We want this proposed extension for completion of remaining building in the project and other legal entities such as full occupancy certificate, society formation, conveyance deed, etc.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jul 2024

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1.PDF19 Apr 2026
Form 2File: ENGINEER CERTIFICATE 2.pdf19 Apr 2026
Form 3File: form 30001.PDF19 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.PDF19 Apr 2026
Form 1File: FORM 1 DEC 25.PDF20 Jan 2026
Form 3File: FORM 3 DEC 25.PDF20 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold.PDF20 Jan 2026
Form 2File: ENGINEER CERTIFICATE 2.pdf20 Jan 2026
Form 1File: FORM 1.PDF20 Oct 2025
Form 2File: ENGINEER CERTIFICATE 2.pdf20 Oct 2025
Form 3File: FORM 3.PDF20 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold.PDF20 Oct 2025
Form 1File: form no 1.PDF18 Jul 2025
Form 3File: form no 3 ca certi.PDF18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD 16-07.pdf18 Jul 2025
Form 2File: form no 2.pdf18 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM NO 1.PDF20 Apr 2025
Certificates of CA (Form 3)File: FORM NO 3.PDF20 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM NO 2.pdf20 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH JUNE 2024.PDF4 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH SEPT 2024.PDF4 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH DEC 2024.PDF4 Apr 2025
Certificates of CA (Form 3)File: CA JUNE 2024.PDF4 Apr 2025
Certificates of CA (Form 3)File: CA SEPT 2024.PDF4 Apr 2025
Certificates of CA (Form 3)File: CA DEC 2024.PDF4 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG JUNE 2024.PDF4 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG SEPT 2024.PDF4 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG DEC 2024.PDF4 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM NO 5 (MARCH 2019).PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM NO 5 (MARCH 2020).PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM NO 5 (MARCH 2021).PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 (MARCH 2022).PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 5 (MARCH 2023).PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM NO 5 (MARCH 2024).PDF12 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.PDF30 Oct 2024
Certificates of CA (Form 3)File: ca 1.PDF30 Oct 2024
Certificates of CA (Form 3)File: ca 2.PDF30 Oct 2024
Certificates of CA (Form 3)File: ca 3.PDF30 Oct 2024
Certificates of CA (Form 3)File: ca 12.PDF30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2.PDF30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2a 19-20.PDF30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2a 20-21.PDF30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2a 21-22.PDF30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2a 22-23.PDF30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2a 23-24.PDF30 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE.PDF31 Jul 2024
Details of encumbrances concerned to LegalFile: ENCUMBERANCE.PDF31 Jul 2024
Declaration about Commencement CertificateFile: DEC CC.PDF31 Jul 2024
Declaration in FORM BFile: FORM B.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH MARCH 2024.PDF31 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD.PDF31 Jul 2024
CERSAI detailsFile: CERSAI.PDF31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTREST.PDF31 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: BANK.PDF31 Jul 2024
Deviation Report with respect to Allotment letterFile: DEV ALLOTMENT.PDF31 Jul 2024
Deviation Report with respect to model copy of AgreementFile: DEV AGGREMENT.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH MARCH 2024.PDF18 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.PDF18 Jul 2024
Certificates of CA (Form 5)File: gems.pdf28 Oct 2018
Layout approvalFile: lay out plan.pdf31 Jul 2017
Building plan approvalFile: lay out plan.pdf31 Jul 2017
PAN CardFile: PAN CARD FIRM.pdf31 Jul 2017
Copy of the legal title reportFile: search report.pdf31 Jul 2017
Details of encumbrancesFile: MORTGAGE deed of jems residency.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: lay out plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: lay out plan.pdf31 Jul 2017
Declaration in FORM BFile: GEMS RESIDENCY AFFIDAVIT.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects certi.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTI.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CERTI OF GEMS RESIDENCY.pdf31 Jul 2017
Proforma of Allotment letterFile: arcticles of agreement AND letter of allotment.pdf31 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GOLD COINCTS 418 SADAR BAZAR SATARA29CompletedJun 2014Jun 2014

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 105 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep GEMS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jadhavwadi (563279)1,100+ in Satara

Builder: JAWAD DEVELOPERS PRIVATE LIMITED

JAWAD DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including WHITE CASTLE and GEMS RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if GEMS RESIDENCY is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GEMS RESIDENCY?

The registered promoter entity is JAWAD DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GEMS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GEMS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GEMS RESIDENCY?

The professionals named in the filing: Architect: VIKAS GHADGE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GEMS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GEMS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GEMS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.